16:42:15 EST Fri 20 Nov 2026
Enter Symbol
or Name
USA
CA



Sonoro Gold Corp
Symbol SGO
Shares Issued 440,461,555
Close 2026-11-19 C$ 0.13
Market Cap C$ 57,260,002
Recent Sedar+ Documents

Sonoro completes geotechnical program at Cerro Caliche

2026-11-20 13:45 ET - News Release

Mr. Kenneth MacLeod reports

SONORO ANNOUNCES COMPLETION OF GEOTECHNICAL PROGRAM AND INITIATION OF ADVANCED ENGINEERING FOR PROPOSED CERRO CALICHE GOLD OPERATION

Sonoro Gold Corp. has completed a comprehensive geotechnical investigation program and commenced advanced engineering for a proposed open-pit, mining operation at its Cerro Caliche gold project in Sonora, Mexico.

The company engaged BBA Consultants International LP to oversee geotechnical investigations and develop the feasibility-level engineering design for the proposed heap leach facility as part of the overall feasibility study, with Ausenco Mexico S. de R.L. de C.V. serving as the lead engineering consultant for the overall project. The extensive geotechnical and geophysical investigations have now been completed with advanced engineering and the HLF design expected to be finalized by the end of Q1 (first quarter) 2027.

The programs mark important advancements of Cerro Caliche, and are expected to provide key technical inputs for project design, development planning and continuing permitting activities.

"The geotechnical investigations and advanced engineering are fundamental to both the design criteria and structural integrity of the proposed Cerro Caliche operation," said Kenneth MacLeod, president and chief executive officer. "This work reflects additional derisking milestones at Cerro Caliche while we continue with our very successful drilling program which has identified higher-grade mineralization at the recently acquired Diana and Batamote concessions."

Geotechnical investigation programs

BBA co-ordinated and provided technical oversight of the geotechnical and geophysical investigation programs conducted by specialized third party contractors to support the feasibility-level engineering design of the proposed heap leach facility. The investigations covered the proposed heap leach pad, solution ponds, crushing plant, ancillary facilities, waste rock area and other areas across the project site. Field activities included geophysical surveys, borehole drilling, test pit excavations and piezometer installations.

Eight HQ-size geotechnical boreholes were completed to characterize subsurface soil and bedrock conditions. In addition, 16 test pits were excavated to depths ranging from 1.40 to 5.80 metres.

On-site standard penetration tests (SPTs) were carried out in the soil intervals and permeability testing to evaluate the hydraulic conditions and laboratory testing was conducted on soil and rock samples taken from the boreholes and pits to adequately characterize foundation soils.

The results and details from the site work are being used for the final heap leach design to a feasibility level with full details of water balance, material takeoffs of the liner system and water diversion requirements.

The geotechnical results are expected to be instrumental for project development and are currently being utilized as key inputs into the advanced engineering phase currently under way.

Advanced engineering

Advanced engineering is being led by Ausenco Mexico, a global engineering, consultancy and project delivery company specializing in the mining and metals industry.

The scope of work is to further define key components of the proposed mining operation, incorporating the results of recent geotechnical work, as well as environmental and engineering studies completed across the project site.

The engineering work is expected to provide additional detail regarding site infrastructure, operational design criteria, construction requirements and implementation planning for the development, construction and commissioning of the process facilities.

Qualified person statement

Stephen Kenwood, PGeo, an independent director of Sonoro Gold, is a qualified person as defined in National Instrument 43-101, and has reviewed and approved the scientific and technical information contained in this news release.

About BBA Consultants International LP

BBA has been providing a wide range of consulting engineering services for over 45 years. Strategic advisory, environmental, engineering and field experts team up to quickly and accurately pinpoint the needs of industrial and institutional clients. Known for its innovative, sustainable and reliable solutions, the firm's expertise is recognized in the energy and natural resources industry. BBA has over 30 plus offices across Canada and abroad (Chile, Peru and the United States), offering clients local support and increased field presence.

About Ausenco Mexico S. de R.L. de C.V.

Ausenco is a global engineering, consulting and project delivery company built for the minerals and metals industry. With more than three decades of global experience, Ausenco partners with clients to navigate complex challenges from initial study through final closure, across all project phases and on five continents. Drawing on deep roots in the minerals and metals sector, Ausenco's team combines technical expertise, practical experience and proven insights to deliver innovative, pragmatic solutions that reduce risk and create value.

About Sonoro Gold Corp.

Sonoro Gold is a publicly listed exploration and development company holding the near-development-stage Cerro Caliche project and the exploration-stage San Marcial project in Sonora state, Mexico. The company has highly experienced operational and management teams with proven records for the discovery and development of natural resource deposits.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.