07:49:42 EDT Wed 24 Apr 2024
Enter Symbol
or Name
USA
CA



Roxgold Inc (2)
Symbol ROXG
Shares Issued 372,116,228
Close 2020-09-11 C$ 1.69
Market Cap C$ 628,876,425
Recent Sedar Documents

Roxgold drills 4.8 m of 26.9 g/t Au at Boussoura

2020-09-14 06:10 ET - News Release

Mr. John Dorward reports

ROXGOLD REPORTS 26.9 GPT OVER 4.8 METRES AT BOUSSOURA AS DRILL PROGRAM CONTINUES TO EXPAND ADDITIONAL FOFORA VEIN SETS

Roxgold Inc. has released new exploration drilling results from the company's Boussoura project, located in southern Burkina Faso.

Boussoura project, Burkina Faso

Highlights from scout reverse circulation (RC) and diamond core (RD) drilling

Fofora:

  • 4.8 metres at 26.9 grams per tonne gold (g/t Au) in drill hole BSR-20-RD-FFR-040 from 79.5 m including:
    • 0.8 m at 147 g/t Au from 79.5 m; and separate intervals of:
      • 1.9 m at 7.3 g/t Au from 42.7 m;
      • 6.0 m at 2.5 g/t Au from 57.5m;
      • Nine m at 2.7 g/t Au from 182 m;
  • Nine m at 10.7 g/t Au in drill hole BSR-20-RC-FFR-063 from 71 m including:
    • One m at 84.1 g/t Au from 77 m;
  • 12 m at 5.7 g/t Au in drill hole BSR-20-RC-FFR-052 from 74 m including:
    • Two m at 33.4 g/t Au from 74 m;
  • 22 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-062 from 40 m including:
    • One m at 35.4 g/t Au from 45 m;
  • 6.7 m at 6.4 g/t Au in drill hole BSR-19-DD-FFR-011 from 244.3 m including:
    • 0.4 m at 94 g/t Au from 249.6 m;
  • 14 m at 3.0 g/t Au in drill hole BSR-20-RC-FFR-070 from two m including:
    • Two m at 13.5 g/t Au from eight m;
  • 18 m at 0.9 g/t Au from 54m and six m at 4.1 g/t from 92 m in drill hole BSR-20-RC-FFR-051;
  • 30 m at 1.3 g/t Au from zero m and two m at 11.4 g/t from 76 m in drill hole BSR-20-RC-FFR-053A;
  • Eight m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-060 from 16 m.

"The exploration success at the Boussoura project continues to build our confidence in the potential for the project to become Roxgold's third high-value asset," stated John Dorward, president and chief executive officer. "We announced the discovery of Boussoura in February of this year and have drilled over 70 holes with consistent assay returns demonstrating broad intersections of mineralization with lower-grade halos surrounding higher-grade quartz veining at Fofora and high-grade veins at Galgouli. We are excited by the potential scale of this project with multiple additional veins with active artisanal workings yet to be tested and numerous targets identified on our exploration permit with similar geochemistry and geophysical anomalies. Going forward, the focus will be on drilling the additional five vein sets identified at Fofora, testing targets near Galgouli and conducting an air core drill program to prioritize the regional targets that have demonstrated high prospectivity from recent geochemical results."

Paul Weedon, vice-president, exploration, commented: "We have now identified over nine mineralized vein sets over four vein corridors across only a third of the nine-square-kilometre active area at Fofora. The results today further highlight the potential we see at Boussoura, with high-grade results such as 4.8 m at 26.9 g/t Au from BSR-20-RD-FFR-040 and nine m at 10.7 g/t Au from BSR-20-RC-FFR-063 underpinning the high-grade nature of the veining we see there.

"In addition, these results include a re-entry and extension of hole BSR-19-DD-FFR-011 drilled at the main Fofora vein last year, which returned 6.7 m at 6.4 g/t Au, including 0.4 m at 94 g/t Au from 249.6 m, emphasizing the depth continuity of the veins and is one of the deepest intersections to date."

Boussoura project -- Burkina Faso

The Boussoura project is situated in the southern portion of the Hounde greenstone belt, which is host to several large-scale operating gold mines, including Roxgold's Yaramoko mine, which is 190 km to the north as well as Endeavour Mining's Hounde and Mana gold mines. The Boussoura project is located approximately 10 kilometres north of the Ivory Coast border.

The Boussoura tenement covers an area of over 250 square kilometres with an earn-in agreement in place over an additional 250 square kilometres of neighbouring permits. The primary targeted areas of the Boussoura project are Fofora in the north and Galgouli in the south. Fofora has seen a minor amount of exploration in the past, while Galgouli was a new discovery by Roxgold (refer to company news release dated Feb. 3, 2020).

Fofora

At least nine sets of shear zones and vein corridors have been identified to date within an active nine-square-kilometre artisanal field in the Fofora area of the Boussoura project. Drilling resumed at Fofora in early May, testing five new vein corridors within two kilometres to the west of the main Fofora vein. Each of the five vein corridors were considered high-priority targets, each having coincident artisanal workings and geophysical and geochemical anomalies, and consisting of a series of north-to-northwest-striking shear zones with surface strike lengths of up to 1,000 m. These targets form part of the broader Fofora artisanal field and are very similar in appearance to the high-grade Fofora main vein.

Mineralization is typically associated with a series of sheared felsic dikes, associated quartz veining and intense silica alteration and replacement, with a variable dip from steep westerly to about 70 degrees east with coarse gold commonly seen in samples. Two mineralization styles have now been recognized at Fofora, with very broad lower-grade zones (typically 0.5 to 1.0 g/t) extending up to 60 m in width and interpreted as representing broad siliceous halos to much higher-grade quartz veins (10 to greater than 100 g/t intervals with high levels of coarse gold) over one to four m intervals.

There were 12 additional RC and RC with diamond tail holes completed at the Fofora Main vein, with a line of five holes successfully extending the strike an additional 150 m to the south. Results included nine m at 10.7 g/t from BSR-20-RC-FFR-063 from 71 m, and the vein remains open along strike.

In addition, five holes successfully intersected an interpreted parallel subsidiary vein on the eastern margin of Fofora Main with results including 14 m at 3.0 g/t in BSR-20-RC-FFR-070 from two m, and 22 m at 2.1 g/t from BSR-20-RC-FFR-062 from 40 m. A re-entry and extension of drill hole BSR-19-DD-FFR-011, targeting interpreted depth extensions, returned 6.7 m at 6.4 g/t from 244.3 m while drill hole BSR-20-RD-FFR-040 intersected several well-mineralized intervals, the highlight of which was 4.8 m at 26.9 g/t Au from 79.5 m, including a 0.8 m interval of 147 g/t Au. These depth extensions and parallel structures remain open along strike and at depth.

Reconnaissance RC drilling tested vein targets up to two kilometres to the west of the main Fofora vein, with recent results including 12 m at 5.7 g/t from 74 m in BSR-20-RC-FFR-052, 30 m at 1.3 g/t Au from zero m in BSR-20-RC-FFR-053A, which included two m at 10.0 g/t Au from 14 m and a separate interval of two m at 11.4 g/t Au from 76 m, and 17 m at 2.1 g/t Au from BSR-20-RC-FFR-079 from 41 m with these results increasing the extent of mineralization highlighted in the previous company release (refer to company news release dated July 29, 2020).

Reconnaissance drilling is continuing to test targets an additional one kilometre west and south with further work to test the balance of the three km by three km artisanal field planned for Q4 this year, after the conclusion of the current rainy season.

Highlights from the most recent drilling at Fofora include:

Fofora Main drilling:

  • 4.8 m at 26.9 g/t Au in drill hole BSR-20-RD-FFR-040 from 79.5 m including:
    • 0.8 m at 147 g/t Au from 79.5 m; and separate intervals of:
      • 1.9 m at 7.3 g/t Au from 42.7 m;
      • 6.0 m at 2.5 g/t Au from 57.5 m;
      • 13.5 m at 1.3 g/t Au from 118 m;
      • Nine m at 2.7 g/t Au from 182 m;
  • Nine m at 10.7 g/t Au in drill hole BSR-20-RC-FFR-063 from 71 m including:
    • One m at 84.1 g/t Au from 77 m;
  • 22 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-062 from 40 m including:
    • One m at 35.4 g/t Au from 45 m;
  • 14 m at 3.0 g/t Au in drill hole BSR-20-RC-FFR-070 from two m including:
    • Two m at 13.5 g/t Au from eight m;
  • 19 m at 1.0 g/t Au in drill hole BSR-20-RC-FFR-065 from 77 m including:
    • One m at 12.2 g/t Au from 92 m;
  • 6.7 m at 6.4 g/t Au in drill hole BSR-19-DD-FFR-011 from 244.3 m including:
    • 0.4 m at 94 g/t Au from 249.6 m.

Fofora Scout drilling:

  • 12 m at 5.7 g/t Au in drill hole BSR-20-RC-FFR-052 from 74 m including:
    • Two m at 33.4 g/t Au from 74 m;
  • 18 m at 0.9 g/t Au in drill hole BSR-20-RC-FFR-051 from 54 m;
    • And six m at 4.1 g/t Au from 92 m;
  • 30 m at 1.3 g/t Au in drill hole BSR-20-RC-FFR-053A from zero m including:
    • Two m at 10.0 g/t from 14 m;
    • And a separate interval of two m at 11.4 g/t Au from 76 m;
  • 25 m at 0.7 g/t Au in drill hole BSR-20-RC-FFR-053 from one m;
  • Eight m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-060 from 16 m;
  • Six m at 2.2 g/t Au in drill hole BSR-20-RC-FFR-058 from 72 m;
  • 16 m at 1.0 g/t Au in drill hole BSR-20-RC-FFR-076 from 22 m;
  • 17 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-079 from 41 m including:
    • One m at 13.4 g/t Au from 46 m;
    • One m at 13.5 g/t Au from 48 m.

Visit the company's website to view the full listing of drill results from the recent drilling programs at the Boussoura project. All results are reported as downhole intervals, which represent approximately 70 per cent of true width, except for FFR-047, which was drilled oblique to the interpreted dip of the mineralization, with true width assumed to be about 40 per cent of reported downhole width.

                                 CATALYSTS AND NEXT STEPS
Event                                                                       Timing
Updated resource and reserve statement
for the Yaramoko mine complex                                              Q4 2020
Continuing infill, expansion and satellite
target drilling program at Seguela                                         Q4 2020
Drilling results from Boussoura                                            Q4 2020
Underground drilling program in 55 zone
at Yaramoko mine complex                                                   Q4 2020
Feasibility study for Seguela                                              H1 2021
Seguela construction decision                                              H1 2021

Quality assurance/quality control

All drilling data completed by Roxgold utilized the following procedures and methodologies. All drilling was carried out under the supervision of Roxgold personnel.

RC drilling used a 5.25-inch face sampling pneumatic hammer with samples collected into 60-litre plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Aircore (AC) drilling was collected in one-metre intervals and sampled in a similar fashion to RC methods. Once collected, RC and AC samples were riffle split through a three-tier splitter to yield a 12.5-per-cent representative sample for submission to the analytical laboratory. The residual 87.5-per-cent sample was stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on site at the company controlled core yard.

DD drill holes were drilled with HQ-sized diamond drill bits. The core was logged, marked up for sampling using standard lengths of one metre. Samples were then cut into equal halves using a diamond saw. One-half of the core was left in the original core box and stored in a secure location at the company core yard at Yaramoko. The other half was sampled, catalogued and placed into sealed bags, and then securely stored at the site until shipment.

All Boussoura RC, AC and DD core samples were shipped to ALS Laboratories laboratory in Ouagadougou for preparation. Samples were dried and crushed by the laboratory and a 250-gram split prepared from the coarse crushed material, prior to pulverization and preparation of a 200 g sample with routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the laboratory inserted its own quality control samples.

Qualified person

Paul Weedon, MAIG, vice-president, exploration, for Roxgold, a qualified person within the meaning of National Instrument 43-101, has reviewed and approved the scientific and technical disclosure contained in this news release, including the QA/QC, sampling, analytical and test data underlying this information. Mr. Weedon verified the information in the news release by reviewing the drill logs, geological interpretations and supporting analytical data. No limitations were imposed on Mr. Weedon's verification process. For more information on the company's QA/QC and sampling procedures, please refer to the company's annual information form dated Dec. 31, 2019, available on the company's website and on SEDAR.

About Roxgold Inc.

Roxgold is a Canada-based gold mining company with assets located in West Africa. The company owns and operates the high-grade Yaramoko gold mine located on the Hounde greenstone belt in Burkina Faso and is advancing the development and exploration of the Seguela gold project located in Ivory Coast.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.