23:08:52 EDT Mon 15 Sep 2025
Enter Symbol
or Name
USA
CA



Trident Resources Corp
Symbol ROCK
Shares Issued 29,590,523
Close 2025-08-14 C$ 0.65
Market Cap C$ 19,233,840
Recent Sedar Documents

Trident to begin drilling at Contact Lake

2025-08-14 14:29 ET - News Release

Mr. Jonathan Wiesblatt reports

TRIDENT RESOURCES TO COMMENCE 5,000M DIAMOND DRILLING PROGRAM ON CONTACT LAKE HIGH-GRADE GOLD PROJECT, SASKATCHEWAN

Trident Resources Corp. has detailed the plans for its upcoming inaugural drill program at the Contact Lake gold project in Saskatchewan's underexplored and prolific La Ronge gold belt. Trident enters this program with over $11-million in cash and marketable securities, fully financing this drill program and positioning the company to act swiftly on future exploration opportunities across its Saskatchewan portfolio.

"With drilling to be under way within the next week, we are excited to build on our proven track record of discovery and resource growth in the La Ronge gold district. We believe our gold assets have the potential to become a Tier 1 project in Canada and provide a strong foundation for value creation. We are also optimistic that our systematic exploration methodology will deliver success with additional new discoveries in our underexplored district-scale land package," said Jonathan Wiesblatt, chief executive officer of Trident.

The drill program at the Contact Lake mine site will comprise 5,000 metres across 16 holes with the aim of confirming and extending gold mineralization along strike and downdip from the historically defined gold mineral resources. The Contact Lake mine was operated by Cameco between December, 1994, and May, 1998, when 1,006,673 tonnes of ore were processed at a head grade of 6.16 grams per tonne (g/t) gold (Au) for a reported 188,185 ounces Au recovered with life-of-mill recovery rate stated at 95 per cent. Contact Lake hosts significant underground infrastructure and exploration potential in the areas immediately adjacent to the underground development. Cameco reported that substantial historically defined gold resources were left in the ground when mining activities were terminated at a time when the gold price was approximately $300 per ounce.

The Contact Lake deposit is hosted within the northeast-trending Bakos shear zone, which cuts through the granitic portion of the Little Deer Lake composite pluton. The auriferous Bakos shear zone has been drill defined at between 15 to 40 metres in width over a strike length of greater than two kilometres. The 2025 drilling will focus on extending gold mineralization between the underground development and the unmined resources of the BK3 zone, located immediately northeast of the former mine site. Drilling will also target downdip extensions of the high-grade gold mineralization of the main zone as these types of shear-hosted gold deposits commonly extend at depth, providing strong discovery potential below the currently defined dimensions of the Contact Lake deposit.

Cyr Drilling, from Winnipeg, Man., has been chosen as the drill contractor and is mobilizing its personnel and drill equipment to Contact Lake. All drill cores will be logged, photographed and processed on site throughout the program. Data collection will include geologic, geotechnical and a full 48-element analytical suite in conjunction with a comprehensive QA/QC (quality assurance/quality control) program with lab-certified standards, field blanks and duplicates comprising more than 10 per cent of the sample stream. All 2025 data will be incorporated into the existing Contact Lake database and utilized in future exploration programs on the project.

The initial drill holes of the 2025 program will be focused on the discovery of shallow gold mineralization immediately northeast of the Contact Lake main zone (MZ1), which produced the majority of gold resources during mining operations. The second phase of drilling will target zones at moderate depth (200 to 250 metres below surface) that lie between the MZ1 zone and the BK3 zone. The BK3 zone is located 150 metres northeast of MZ1, below the western edge of Contact Lake, and is reported to host substantial gold resources that were never mined. The final phase of the 2025 drill program will target the downplunge extension of the gold mineralization in both the MZ1 and MZ2 zones.

Drilling will target the heart of the past-producing Contact Lake mine, following up on historical high-grade intercepts, including intercepts detailed in the attached table.

Qualified person

The scientific and technical data contained in this news release were approved by Cornell McDowell, PGeo, a non-independent qualified person under National Instrument 43-101, Standards of Disclosure of Mineral Projects.

About Trident Resources Corp.

Trident Resources is a Canadian public mineral exploration company listed on the TSX Venture Exchange, focused on the acquisition, exploration and development of advanced-stage gold and copper exploration projects in Saskatchewan, Canada. The company is advancing its 100-per-cent-owned Contact Lake and Greywacke Lake projects, which host significant historical gold resources located within the prospective and underexplored La Ronge gold belt, as well as the 100-per-cent-owned Knife Lake copper project, which contains a historical copper resource.

We seek Safe Harbor.

© 2025 Canjex Publishing Ltd. All rights reserved.