13:49:09 EDT Wed 08 May 2024
Enter Symbol
or Name
USA
CA



Lithium South Development Corp
Symbol LIS
Shares Issued 96,899,542
Close 2024-01-17 C$ 0.445
Market Cap C$ 43,120,296
Recent Sedar Documents

Lithium S. nears completion of 1st HMN production well

2024-01-18 11:59 ET - News Release

Mr. Adrian Hobkirk reports

LITHIUM SOUTH PUMPING/PRODUCTION WELL DRILLING UPDATE

Lithium South Development Corp. has provided an update regarding the continuing development of the Hombre Muerto North lithium project (HMN Li), located on the Hombre Muerto salar, in Salta province, Argentina.

Spanning 3,287 salar-located hectares, the HMN Li project comprises five key claim blocks: Alba Sabrina (2,089 hectares), Norma Edit (115 hectares), Viamonte/Natalia Maria (595 contiguous hectares), Gaston Enrique (55 hectares) and Tramo (383 hectares).

Alba Sabrina production well 1 (ASPW1) has been drilled to 340 metres depth and is nearing the target depth of 400 metres. The well has encountered sand and sand/broken rock from surface to the current depth. Porosity is anticipated to be good. Upon target depth, the well will then be cased, developed and a pumping test will be completed. A technical review is under way to determine the optimal location for further pumping wells on the Alba Sabrina claim block.

Company president and chief executive officer Adrian F.C. Hobkirk is quoted: "We are excited to be nearing the completion of our first deep pumping well at the Alba Sabrina claim block. We look forward to pumping test results."

The preliminary economic assessment (PEA) announced Oct. 18, 2023, is nearing completion. Knight Piesold Consulting and JDS Energy and Mining are now completing the financial model. Full results are expected shortly. The PEA will have an initial design capacity of 15,000 tonnes per year lithium carbonate equivalent.

About Lithium South Development Corp.

Lithium South owns 100 per cent of the Hombre Muerto North lithium project located in Salta and Catamarca provinces, Argentina, the heart of the lithium triangle. The HMN Li project is surrounded by a $4-billion (U.S.) lithium development under construction by POSCO (Korea) and the Sal de Vida project under development by Arcadium Lithium. Lithium South has delineated a National Instrument 43-101 compliant 1,583,100-tonne lithium carbonate equivalent (LCE) resource on the Alba Sabrina, Natalia Maria and Tramo claim blocks, three of five non-contiguous blocks that make up the HMN Li project. A pumping/production well drilling campaign is under way. A preliminary economic assessment based on the Tramo, Alba Sabrina and Natalia Maria claim blocks is expected in January, 2024. Lithium South is transitioning from being a lithium explorer to becoming a lithium developer.

William Feyerabend, CPG, a consulting geologist and qualified person under NI 43-101, contributed to the production of this press release and approves of the technical and scientific information contained herein.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.