01:39:02 EDT Wed 08 May 2024
Enter Symbol
or Name
USA
CA



Lithium South Development Corp
Symbol LIS
Shares Issued 96,899,542
Close 2023-09-13 C$ 0.45
Market Cap C$ 43,604,794
Recent Sedar Documents

Lithium South Development begins well drilling at HMN

2023-09-14 09:55 ET - News Release

Mr. Adrian Hobkirk reports

PUMPING/PRODUCTION WELL INSTALLATION BEGINS AT HMN LI PROJECT

Lithium South Development Corp. has initiated a pumping/production well drilling campaign at the five-claim block Hombre Muerto North lithium project (HMN Li project), Salta, Argentina.

This phase 1 program will include the drilling of three wells: two at Alba Sabrina (AS-WW-01-23 and AS-WW-02-23) and one at Natalia Maria (NM-WW-01-23). Notably, each well will be fitted with screen filters and blind casing. Upon completion, long-term pumping tests will be conducted to determine brine transmissivity, including the maximum flow of each well. The results will provide key information for the coming feasibility study.

The first well, NM-WW-01-23, located at the Natalia Maria claim block, is currently being drilled to a depth of 200 metres. Early results from core drilling are promising, with a lithium concentration exceeding 1,175 milligrams per litre (as announced on April 6, 2023). Following the completion of the Natalia Maria well, the team will begin drilling two wells at the Alba Sabrina block, with depths of 400 m and 200 m, respectively. The Alba Sabrina claim block is the largest in the HMN Li project claim group, encompassing 2,089 hectares of the total 3,287-hectare salar footprint. The upgraded project resource (Sept. 12, 2023) delineates a resource of 927,500 tonnes of lithium carbonate equivalent (LCE) within this block.

In addition to the above, Lithium South Development is reviewing technical data associated with the southern Viamonte and Norma Edit claim blocks. These blocks are being evaluated for potential production well installation during this drilling campaign.

Advertising program

To assist in distributing the company message, Batteryjuniors.com, an advertising and marketing company based in Sweden, have been retained to develop a advertising program worldwide with special focus on the United States and Canada. Total cost for the six month program is 100,800 euros and is expected to begin immediately.

About Lithium South Development Corp.

Lithium South owns 100 per cent of the Hombre Muerto North lithium project located in Salta and Catamarca provinces, Argentina, the heart of the lithium triangle. The Hombre Muerto salar has a history of lithium production, with Livent Corp. in operation for over 25 years, in an area just south of the HMN Li project. The HMN Li project is surrounded by a $4-billion (U.S.) lithium development under construction by POSCO (Korea) and the Sal de Vida project under development by Allkem. Lithium South has delineated a National Instrument 43-101 compliant, 1,583,100-tonne lithium carbonate equivalent (LCE) resource on the Alba Sabrina, Natalia Maria and Tramo claim blocks, three of five non-contiguous blocks that make up the HMN Li project. Lithium South is now transitioning from being a lithium explorer to becoming a lithium developer.

William Feyerabend, a consulting geologist and qualified person under NI 43-101, contributed to the production of this press release and approves of the technical and scientific information contained herein.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.