04:51:13 EDT Tue 21 May 2024
Enter Symbol
or Name
USA
CA



Kootenay Silver Inc
Symbol KTN
Shares Issued 439,279,033
Close 2023-10-12 C$ 0.065
Market Cap C$ 28,553,137
Recent Sedar Documents

Kootenay Silver's Promontorio at 140.8 Moz AgEq M+I

2023-10-12 10:27 ET - News Release

Mr. James McDonald reports

KOOTENAY SILVER ANNOUNCES UPDATED PROMONTORIO/MAIDEN LA NEGRA RESOURCE ESTIMATE AND INTENTION OF SHARE CONSOLIDATION

Kootenay Silver Inc. has provided an updated mineral resource estimate at the Promontorio/La Negra project in Sonora, Mexico. The resource estimate is an update of the Promontorio deposit and a maiden mineral resource estimate for the La Negra deposit seven kilometres to the north. The two deposits are part of the Promontorio mineral belt and are considered a single project.

The mineral resource estimates (MREs) have been prepared by Sue Bird, MSc, PEng, geological and mining engineer of by Moose Mountain Technical Services (MMTS), in accordance with NI 43-101 standards (May 9, 2016) and CIM (Canadian Institute of Mining, Metallurgy and Petroleum) Definition Standards (May 19, 2014), with guidance from CIM Best Practice Guidelines (Nov. 29, 2019).

Highlights from the 2023 mineral resource estimate include:

  • Increased grades of the Promontorio deposit of 24 per cent for silver, 21 per cent for gold and 22 per cent and 21 per cent for lead and zinc, respectively (see attached table);
  • A resulting 68-per-cent increase in measured and indicated (M+I) silver equivalent (AgEq) metal content at the Promontorio deposit (see attached table);
  • Promontorio M+I (measured and indicated) mineral resources of 140.8 million ounces AgEq contained in 42.1 million metric tonnes averaging 104 grams per tonne;
  • Promontorio inferred mineral resources of 39.8 million ounces contained in 14.6 million tonnes averaging 84.9 g/t; these results are calculated using 25 g/t AgEq cut-off and are contained within a potentially economically minable pit shell (see attached table);
  • La Negra indicated mineral resources of 22 million ounces AgEq contained in 5.3 million tonnes averaging 129 g/t;
  • La Negra inferred mineral resources of 4.6 million ounces contained in 1.2 million tonnes averaging 115 g/t; these results are calculated using 40 g/t AgEq cut-off and are contained within a potentially economically minable pit shell (see attached tables).

Kootenay's president and chief executive officer, James McDonald, stated: "We are pleased to see a significant increase in metal content on the Promontorio/La Negra property that includes the La Negra discovery for the first time. Between the two deposits, we see an exciting increase in grade and contained silver ounces.

"On a silver equivalent basis, the project is now estimated to host 162.8 million ounces M+I and 44.4 million ounces inferred. On a silver-only basis, the M+I resource for silver are estimated to total 68.2 million ounces, with another 17.6 million ounces inferred.

"The first-ever resource estimate for La Negra silver deposit returned excellent overall grades, averaging 129 g/t silver equivalent in the indicated category and 115 g/t silver equivalent in the inferred category. At a cut-off of 50 g/t silver equivalent, these grades increase to 146 g/t and 133 g/t silver equivalent, respectively, with only a modest drop in contained silver ounces.

"I would like to point out our expanded resource base, on a silver equivalent basis, the estimated totals for Promontorio/La Negra plus La Cigarra are 214.2 million silver equivalent ounces in the M+I, along with 54.9 million silver equivalent ounces inferred.

"On a silver-only basis, Kootenay's M+I silver resources are estimated to be 120.2 million ounces and 28.2 million silver ounces inferred for the Promontorio/La Negra and La Cigarra projects.

"This work prepares the project for advancement in a stronger metals market. Meanwhile, we remain focused on drilling Columba with the aim of defining a new high-grade resource there and will be reporting on results in the coming weeks."

Mr. McDonald added: "The company has also decided to proceed with a share consolidation at this time as detailed below, which the board believes is in the best interest of shareholders. It has been an ongoing discussion point with various investors and shareholders encouraging us to proceed with the consolidation, which could lead to increased investor interest by raising the company profile with a lower number of outstanding shares, a higher stock price and better position the company to obtain financing to further advance its properties."

The attached tables summarize the Promontorio comparison and the mineral resource estimate for Promontorio. The effective date of the Promontorio/La Negra resource estimates is Aug. 27, 2023.

At Promontorio, the increase in M+I metal content is considered to be due primarily to the following:

  • Additional drilling of 89 holes (23,220 metres) in 2012/2013, which were not included in the previous resource estimate;
  • Modelling of both high-grade constrained mineralized shells and a lower-grade mineralized halo to better limit the data used for the interpolations;
  • Changes to the metal prices (particularly Ag and Au) with lower Ag price and higher Au price to conform to three-year trailing averages, which caused a large increase in AgEq grade.

The attached tables summarize the La Negra total resource estimate and the La Negra resource by oxidation zone, respectively. La Negra is assumed to produce dore, with only Au and Ag recovered. The cut-off grades of 40 g/t AgEq more than covers the assumed cost of processing plus G&A (general and administrative).

Resource estimate uncertainty

Areas of uncertainty that may materially impact the mineral resource estimates include changes to: long-term metal price assumptions; interpretations of mineralization geometry, fault geometry and continuity of mineralized zones; net smelter return used to constrain the estimates; metallurgical recovery assumptions; input assumptions used to derive the conceptual open pit outlines used to constrain the estimate; variations in geotechnical, hydrogeological and mining assumptions and environmental, permitting and social license assumptions.

There are no other known environmental, legal, title, taxation, socioeconomic, marketing, political or other relevant factors that would materially affect the estimation of mineral resources that are not discussed in this news release.

Mineral Resource Estimate Methodology

Data

The Promontorio MRE uses 59,149 assays from 311 drill holes based on drilling up to an including 2013. The La Negra MRE uses 9,311 assays in 94 drill holes from drilling completed between 2014 and 2017.

Mineralization Envelopes

Confining shapes for the interpolations have been made using the geologic modelling shapes provided by Kootenay, the logged lithology and the metal grades. The shapes of the main mineralized zones target the breccias and a value of approximately US$15/tonne Net Smelter Return (NSR). Dilution of lower grade intercepts has been added as necessary to produce smooth shapes.

At Promontorio there are six domains modeled, as well as a low-grade halo surrounding and connecting the 2 major areas. The shapes are illustrated in Figure 1.

At La Negra one domain has been modeled and it has been split into three oxidation zones based on logging data. The shapes are illustrated in Figure 2.

Grade Capping

The grade distributions within the mineralized domains are mainly lognormal except at very high grades where outliers are evident and therefore capping of assays has been done as summarized in the following tables. For clarity, also summarized in the tables are the Outlier Restrictions which has been applied to the composites during interpolation at Promontorio. For composite grades above the Outlier value provided, and at distances greater than 5m from the data, the value is essentially capped to the outlier.

At both deposits 2m has been used for the base length when compositing, which is longer than the vast majority of the assays. The compositing also honored the domain boundaries. Assay intervals less than 1 m have been added to the previous composite to limit the number of small assay intervals.

Variography

At Promontorio variograms have been made on each axis for each metal in Domain 1 and 2, which are the largest domains. The strongest correlations are steeply dipping down the major axis of the mineralization with ranges from 100m to 130m.

At La Negra the strongest correlation is at azimuth 255 dipping 15 degrees with a range of approximately 55m. The variograms have been used to aid in determining the search parameters for the interpolations, as well as distances for Classification to Measured and Indicated.

Specific Gravity

The Promontorio drilling database contains 4,510 specific gravity ("SG") measurements in total and the SG is estimated based on the interpolated Pb and Zn grade using a regression formula.

The SG at La Negra is based on 1,541 measurements within the deposit area and has been assigned based on the mean grade within each of the oxidation zones.

Interpolations and Classification.

Interpolations have been done in 5 passes using composites coded with the domain shapes for model-composite domain matching. Searches are oriented along the major axis of each domain. Inverse Distance squared (ID2) is used at Promontorio and Ordinary Kriging at La Negra.

Classification methodology at the two deposits is similar, the primary difference being the search distances used, which are based on the variography.

Classification at Promontorio is based on the distance between drill holes using the following process:

All interpolated blocks are initially classified as Inferred.

Block are upgraded to Indicated if the if the average distance to the 2 nearest drill holes is <= 50m and if the distance to the furthest of those drill hole is <=70m, and the drill holes must be in at least two quadrants (directions).

Blocks are further upgraded to Measured if the if the average distance to the 3 nearest drill holes is <= 30m and if the distance to the furthest of those drill hole is <=50m, and the drill holes must be in three quadrants (directions).

The low grade halo is classified as Inferred

Classification at La Negra uses the following process:

All interpolated blocks are initially classified as Inferred.

Block are upgraded to Indicated if the average distance to the 2 nearest drill holes is <= 30m, and the distance to the furthest of those drill hole is <=50m, and the drill holes must be in two quadrants (directions).

At both deposits additional manual checking and smoothing of the results has been done to ensure continuous shapes of Classification are produced.

Metallurgy

G&T Metallurgical Services Ltd, Kamloops, BC, Canada completed preliminary metallurgical programs on drill core composites from the Promontorio property for Kootenay in 2009, 2012 and 2013. The metallurgical program investigated a standard polymetallic sequential flotation flowsheet that includes crushing, grinding, lead flotation, zinc flotation and pyrite/arsenopyrite flotation. Pressure oxidation (POX) of the pyrite/arsenopyrite concentrate is required to extract the contained gold by cyanidation to produce dore. Promontorio will also produce lead concentrate, zinc concentrate. The metallurgical recovery assumptions are listed with Table 1. Overall gold recovery is estimated at 70 per cent and is based on 65 per cent gold recovery into the pyrite flotation concentrate followed by 94 per cent cyanidation gold extraction from the pyrite concentrate after pressure oxidation, plus an average 9 per cent gold recovery into the lead flotation concentrate.

Metallurgical testing on La Negra samples has been conducted by Kappes, Cassiday & Associates of Reno Nevada in 2015 and McClelland Laboratories of Sparks Nevada in 2018. The work in 2015 did initial comparisons of flotation to cyanide leaching recovery methods on 7 composites. Silver extractions from leaching ranged from 70 per cent to 90 per cent based on calculated heads which ranged from 61.71 to 242.64 grams per metric tonne and did not seem influenced by sulfide sulfur content. Follow-up in 2018 tested 10 composites representing material from four oxidation zones. The composites were all amenable to whole ore milling/cyanidation treatment with respect to silver recovery, but gold recoveries varied significantly.

La Negra is expected to produce silver and gold dore. The metallurgical recovery assumptions are listed with Table 2 and are based on the average results for each oxidation type tested in the 2018 test program.

Resource Pit Limits

Lerch Grossman ("LG") pit optimization tools have been used to select a pit shape for limiting the resource. The LG pit targets Net Smelter Return (NSR) calculated in each block using interpolation results and the economic, metallurgical, and mining parameters shown with the resource tables 1 through 4.

Cut off Grade

The COG was selected using AgEq to cover, as a minimum, the processing and G&A costs and to account for the metallurgical recovery and smelter terms. For both deposits 25g/t AgEq will covers the assumed cost of US$12/tonne; however, a higher cut-off has been used for the base case for La Negra.

Block Model Validation

Several validation techniques have been utilised to ensure that the estimates are reasonable. The global grades of the model with the de-clustered composites have been compared to ensure no bias was introduced. In addition, the total metal content for each metal at various cut-off have been compared to ensure that the total metal compares well to that of data. Grade-tonnage curves have been created to ensure that the appropriate smoothing of modelled grades has been accomplished with no over-prediction of metal throughout the grade distributions. Swath plots comparing the de-clustered composite grade to the ID2 modelled estimate in Easting, Northing and Elevation were completed to ensure the model is spatially predicting grade correctly. Visual comparisons on section and plan were also done to ensure the model compares well to the assay grades.

Qualified Persons

Ms. Sue Bird - P. Eng., (resource estimate) of MMTS is the Qualified Person ("QP") who prepared the mineral resource estimate, and compiled and reviewed the resource estimate disclosed in this news release. Ms. Bird, as the Qualified Person, has approved the scientific and technical content of this news release. Dale Brittliffe, BSc. P. Geol., Vice President, Exploration of Kootenay Silver, is the Company's nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has reviewed the scientific and technical information disclosed in this news release. Mr. Brittliffe is not independent of Kootenay Silver.

Cautionary Note to Investors

While the terms "indicated (mineral) resource" and "inferred (mineral) resource" are recognized and required by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, investors are cautioned that except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated economic viability. Investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded into mineral reserves. Additionally, investors are cautioned that inferred mineral resources have a high degree of uncertainty as to their existence, as to whether they can be economically or legally mined, or will ever be upgraded to a higher category.

United States investors are advised that current Mineral Resources are not current Mineral Reserves and do not have demonstrated economic viability.

Share Consolidation

The Company is pleased to announce that its board of directors (the "Board") has approved a consolidation (the "Consolidation") of the common shares (the "Shares") of the Company on a ten-to-one (10:1) basis. The Company currently has 457,669,033 Shares outstanding and if completed, the Consolidation would reduce the issued and outstanding Shares to approximately 45,766,903 Shares, subject to rounding. No fractional post-Consolidation Shares will be issued pursuant to the Consolidation. Any fractional Shares equal to or greater than one-half resulting from the Consolidation will be rounded up to the next whole number of Shares, and any fractional Shares less than one-half resulting from the Consolidation will be rounded down to the nearest whole number.

Along with all outstanding Shares, the Company's equity incentive plan will be adjusted accordingly. The Consolidation will also affect the issued and outstanding common share purchase warrants (each, a "Warrant") of the Company, as the number of Shares issuable upon the exercise of each Warrant will be reduced and the exercise price will increase, all in accordance with the terms of the certificates governing the Warrants.

The Consolidation is subject to TSX Venture Exchange ("TSXV") approval. At the Company's annual general and special meeting of its shareholders (the "Shareholders") held on March 15, 2023, the Shareholders approved the replacement of the Company's articles of incorporation in their entirety with a new form of articles of incorporation (the "New Articles"). Under the New Articles, a consolidation may be implemented by the Board without shareholder approval. As such, the Consolidation is not subject to shareholder approval. The Company will announce the effective date of the Consolidation, as well as the new CUSIP/ISIN numbers for the post-Consolidation Shares by way of a future news release. The post-Consolidation Shares will continue to trade on the TSXV under the Company's existing name and trading symbol.

The Consolidation will not materially affect the percentage ownership in the Company of Shareholders even though such ownership will be represented by a smaller number of Shares. The Consolidation will merely proportionally reduce the number of Shares held by Shareholders.

Shareholders who have deposited their Shares into brokerage accounts are not required to take any action to effect an exchange of their Shares.

Shareholders with physical certificates will receive a letter of transmittal from Computershare Investor Services Inc., the Company's transfer agent. The letter of transmittal will contain instructions on how registered Shareholders can exchange their share certificates representing pre-Consolidation Shares for new certificates representing post-Consolidation Shares. Until surrendered, each share certificate representing pre-Consolidation shares will represent the number of whole post-Consolidation shares to which the holder is entitled as a result of the consolidation.

About Kootenay Silver

Kootenay Silver Inc. is an exploration company actively engaged in the discovery and development of mineral projects in the Sierra Madre Region of Mexico. Supported by one of the largest junior portfolios of silver assets in Mexico, Kootenay continues to provide its shareholders with significant leverage to silver prices. The Company remains focused on the expansion of its current silver resources, new discoveries and the near-term economic development of its priority silver projects located in prolific mining districts in Sonora, State and Chihuahua, State, Mexico, respectively.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.