11:44:26 EDT Wed 09 Jul 2025
Enter Symbol
or Name
USA
CA



Kermode Resources Ltd (2)
Symbol KLM
Shares Issued 48,664,734
Close 2024-07-29 C$ 0.01
Market Cap C$ 486,647
Recent Sedar Documents

Kermode's XRF work returns 16.64% Cu at Mount Sicker

2024-07-31 09:27 ET - News Release

Subject: News Release COPPER CANYON XRF results PDF Document

File: Attachment 2024-07-31-KLM-COPPER CANYON XRF 3rd results news release.pdf

Kermode Reports XRF Results for Select Samples from Copper Canyon

Victoria, British Columbia - (July 31, 2024) - Kermode Resources Ltd. (TSXV: KLM) ("Kermode" or the "Company") reports the results of XRF analysis of select surface samples from the Copper Canyon area at the Mount Sicker project.

Sample ID Copper (% Cu)

CCSH1 1.03% CCSH2 5.87% CCSH3 3.24% CCSH4 16.64%

A video of the field work titled, "Copper Bearing Veins In The Copper Canyon Zone!" was published here: https://youtu.be/mtzxPeeGGsw

Rock Sample Details for Samples from Copper Canyon

ID DATE EASTING NORTHING SAMPLE Details

CCSH1 ELEVATI CCSH2 (10N) (ZONE 10) ON (ASL) TYPE CCSH3 CCSH4 30cm wide quartz vein hosted in schists.

Fine pyrite, pyhrrotite and chalcopyrite

follows vein partially mineralizing the

quartz and surrounding schists. Sample

contains approximatley 30% pyrite, 10%

pyhrrotite and 10% chalcopyrite in

Select clots/patches in the pyrite/pyhrrotite

7/5/2024 440542 5413043 141m Grab matrix.

Sample from the mine dump material at

edge of Chemainus River, containing

quartz with semi massive sulphides, 30%

pyrite, 20% pyhrrotite and 30%

Select chalcopyrite. Base of Copper Canyon

7/5/2024 440535 5413033 135m Grab lower portal.

Sample across quartz vein hosted in

sheared/folded schists averaging 40%

pyrite, 10% pyhrrotite and 20%

chalcopyrite. Lower portal of Copper

2.0m Canyon Shaft, directly across from

7/5/2024 440536 5413011 139m Chip victoria adit.

55cm wide quartz vein with 50%

chalcopyrite, 10-15% pyrite, 2-3%

pyhrrotite. Vein traceable over 10m uphill

and also goes into the river. Vein

55cm appears to parallel main vein at the lower

7/5/2024 440555 5413031 136m Chip portal of the Copper Canyon workings. Note that all samples were collected by Justin Deveault and Justin McNutt from 911 Exploration Corp. on July 5, 2024. The XRF results were received July 29, 2024.

Qualified Person The technical information in this news release has been reviewed and approved by Mr. Jacques Houle, P. Eng, a Qualified Person responsible for the scientific and technical information contained herein under National Instrument 43-101 standards.

QA/QC Statement The results reported here were prepared by using an Olympus Delta portable XRF (Model DS 6500CC) using industry-standard chain of custody procedures with all samples. The XRF operator named Clive Khan is independent of Kermode and completed the XRF analysis in July 2024.

The XRF was calibrated prior to each test as follows. At each startup, a calibration coin was analyzed, and subsequent analysis was only performed when a pass was obtained, which was calculated internally by the XRF instrument. The XRF unit was set to geochemical mode and a full 200 second test was run to determine copper content. While the instrument detects many elements, only copper was tested. The XRF analyzes only a small portion of the sample, so half the sample was crushed to pass an 80-mesh screen before testing. During analysis of the samples by handheld XRF, non-blind control samples were analysed to monitor the XRF instrument calibration and performance. A correction factor for all base metals was applied to the raw data. The correction factor was determined by analyzing samples that had previously been analyzed at a commercial laboratory. These rock samples were of varying concentrations and analyzed by the handheld XRF using the method described above. The portable XRF is accurate to within a 5% error for copper content. We did not use the portable XRF to determine accurate readings for other elements.

About Kermode Kermode is a junior mining company hunting for exploration opportunities around the world.

On Behalf of the Board of Directors, KERMODE RESOURCES LTD

"Peter Bell" President/CEO

For further information, please contact

Tel: 1-250-588-6939

Email: peterbellmining@gmail.com

Website: https://linktr.ee/kermoderesources Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements This news release contains statements that constitute "forward-looking statements" within the meaning of applicable Canadian and United States securities legislation. Such forward-looking statements involve risks that may cause Kermode's actual results to differ materially from anticipated results. Forward-looking statements in this document include results, analyses and interpretations of our exploration programs, geological and mineralization interpretations and the plans, results, costs, and timing thereof. Although Kermode believes the forward-looking information contained in this news release is reasonably based, forward-looking statements involve uncertainty. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date.

© 2025 Canjex Publishing Ltd. All rights reserved.