12:22:21 EST Wed 25 Nov 2026
Enter Symbol
or Name
USA
CA



Imagine Lithium Inc.
Symbol ILI
Shares Issued 340,628,030
Close 2026-11-24 C$ 0.015
Market Cap C$ 5,109,420
Recent Sedar+ Documents

ORIGINAL: Imagine Lithium Announces Commencement of Drill Program on Casino Royale to Expand its Jackpot Lithium Project

2026-11-25 07:01 ET - News Release

Vancouver, British Columbia--(Newsfile Corp. - November 25, 2026) - IMAGINE LITHIUM INC. (TSXV: ILI) (OTCQB: ARXRF) (the “Company” or “Imagine”) is pleased to announce that drill rigs are being mobilized to the Jackpot Project site to commence the Company's planned Fall 2026 exploration drilling program, as outlined below, and to provide an exploration update on its 27,597 ha Jackpot Project. Imagine Lithium's Jackpot project comprises the Ruth Pegmatite claims and the Jackpot Deposit claims in the Georgia Lake Pegmatite Field, approximately 140 km NNE of Thunder Bay, Ontario (Figure 1).

Total resources on the land package include 3.1 Mt Indicated Mineral Resources at 0.85% Li2O for 26.2 kt of Li2O and 5.3 Mt Inferred Mineral Resources at 0.91% Li2O for 49.5 kt of Li2O (see October 15, 2025 press release). The Ruth Pegmatite was exposed over a 233 m strike length in the fall of 2025 and drilling will test the pegmatite over 400m of strike. Channel sample highlights from the 2025 program include 1.34% Li2O over 9.10 m in channel RCH25-06" (see January 19, 2026 press release). The proposed 2,200 m drill program is intended to expand the 3.1 Mt inferred resource at the Casino Royale zone and provide insight on the continuity, grade and width of the Ruth Pegmatite.

Note: Inferred Mineral Resources have a lower level of confidence, are not Mineral Reserves, and have not demonstrated economic viability.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2962/325818_3021592c047f7b68_001.jpg

Figure 1: Jackpot Project located next to Trans-Canada Highway, power, port, railroad, and workforce.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2962/325818_3021592c047f7b68_001full.jpg

Compilation of exploration data collected between 2022 and 2025 has identified six high-priority lithium exploration targets across the Jackpot Project (Figure 2). The targets combine lithium-in-soil anomalies with spodumene-bearing pegmatite discoveries in bedrock and glacial boulders, with several returning high-grade lithium assays of up to 4.31% Li₂O.

The six priority targets, listed in order of proximity to the Jackpot Deposit, are:

  • Jackpot South: Three spodumene-bearing boulders grading up to 2.91% Li₂O, associated with a lithium-in-soil anomaly.
  • Blay Lake: Bedrock and boulder samples grading up to 4.31% Li₂O, coincident with a lithium-in-soil anomaly.
  • Newkirk SW: A cluster of spodumene-bearing boulders grading up to 3.59% Li₂O.
  • Cosgrave North: Northern and southern pegmatite dykes with surface samples grading up to 3.92% Li₂O.
  • Jackpot West: A spodumene-bearing pegmatite dyke up to 5 metres wide and 40 metres long, with samples grading up to 1.98% Li₂O, alongside a significant soil anomaly.
  • Jackpot Southwest: A large lithium-in-soil anomaly with spodumene-bearing boulders grading up to 4.16% Li₂O, in an area containing five previously identified pegmatite dykes (see August 26, 2026 press release).

Note: grab and boulder samples are selective by nature and may not represent the true grade or style of mineralization.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2962/325818_3021592c047f7b68_002.jpg

Figure 2: Exploration Potential of the Jackpot Project showing newly discovered zones with coincident lithium-in-soil anomalies.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2962/325818_3021592c047f7b68_002full.jpg

Drill rigs are being mobilized to the Jackpot Project site to begin the Fall 2026 drilling program. The program will focus on expanding Mineral Resources at the Casino Royale deposit and conducting exploration drilling at the Ruth Pegmatite to update Imagine Lithium's Mineral Resource inventory.

In addition, several high-priority blind targets, including the Jackpot South and Blay Lake areas, will be advanced in preparation for a Winter 2027 drill program.

The broader exploration program will include:

  • Testing the Pegmatite 500 Extension north of the Jackpot-Casino Royale open-pit trend;
  • Bedrock stripping at Newkirk SW to identify the source of spodumene-bearing boulders;
  • Geological mapping at Jackpot West and Jackpot Southwest to identify additional pegmatite targets;
  • Advancing metallurgical optimization and preliminary engineering studies; and
  • Initiating environmental baseline studies and permitting preparations to support future development.

QA/QC Protocol

Imagine Lithium implemented a strict QA/QC protocol in processing all rock samples collected from the stripped outcrops. The protocol included the insertion and monitoring of appropriate reference materials. High and low concentration certified lithium standards, blanks and duplicates are used to validate the accuracy and precision of the assay results.

All collected rock samples were put in sturdy plastic bags, tagged, and stored in the core shack under the supervision of a professional geologist. The sample number, distance and brief description of each sample is logged and entered to a digital database. Rock samples were cut using a 14" diamond saw and placed in a labelled sample bag. Duplicate samples were halved and placed into unique sample bags with a separate sample identifier.

All sample bags were put into rice bags and stored securely before being delivered to AGAT Laboratories in Thunder Bay, Ontario. Samples are processed and shipped to be crushed at the AGAT facility in Vancouver, BC. Lithium was analyzed by Sodium Peroxide Fusion with ICP-OES and ICP-MS Finish.

Qualified Person

Jason Arnold, P.Geo., President of DCX Geological Consulting is a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, and has reviewed and approved the technical content of this news release. Due to Mr. Arnold's role as a consultant and director of the Company, he is not considered independent of the Company within the meaning of NI 43-101.

About Imagine Lithium Inc.

Imagine is a junior mining exploration company focused on seeking and acquiring world-class mineral projects. The company holds the Jackpot lithium property located in the Georgia Lake area about 140 km NNE of Thunder Bay, Ontario. The Property is approximately 12 km by road from the Trans-Canada Highway (Hwy 11), and is in proximity to sources of power, railroads, and ports. The Jackpot Property consists of 322 mineral claims covering 27,597 hectares. The Property contains NI 43-101 compliant Mineral Resources of 3.1 Mt grading 0.85% Li2O in the Indicated category and 5.3 Mt grading 0.91% Li2O in the Inferred category, as well as several other known pegmatite showings.

ON BEHALF OF THE BOARD
Simone Sze Man Suen, President

FOR FURTHER INFORMATION, PLEASE CONTACT:

Telephone: +1-807-355-5405
Toll Free: 1-888-945-4770
info@imaginelithium.com
www.imaginelithium.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and beliefs, and are based on assumptions made by, and information currently available to, the Company.

Forward-looking statements in this news release include, but are not limited to, statements regarding the mobilization of drill rigs and the commencement, scope and timing of the Fall 2026 drilling program; the anticipated Winter 2027 drill program; the expansion of Mineral Resources at the Casino Royale deposit and exploration drilling at the Ruth Pegmatite; the planned bedrock stripping, geological mapping, metallurgical optimization and preliminary engineering studies; and the initiation of environmental baseline studies and permitting preparations.

These statements are based on assumptions including the continued availability of drilling contractors, equipment and qualified personnel; the Company's ability to obtain adequate financing on acceptable terms; the timely receipt of required permits and approvals; stable commodity prices, exchange rates and lithium market conditions; and the absence of material adverse weather, access or operational disruptions. Material risk factors that could cause actual results to differ include exploration results that do not support further drilling or resource expansion, inability to secure financing, delays in permitting or community and Indigenous engagement, cost escalation, equipment or labour shortages, and the inherent uncertainty of mineral exploration and resource estimation.

Investors are cautioned that these forward-looking statements are neither promises nor guarantees and are subject to risks and uncertainties that may cause future results to differ materially from those expected. These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances. All the forward-looking statements made in this press release are qualified by these cautionary statements and by those made in our filings with SEDAR+ in Canada.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/325818

© 2026 Canjex Publishing Ltd. All rights reserved.