Mr. Frank Candido reports
DELTA RESOURCES ADVANCES I-ZONE DRILLING AND DISTRICT-SCALE GOLD EXPLORATION AHEAD OF SWISS MINING INSTITUTE CONFERENCE IN ZURICH
Delta Resources Ltd. has provided an update on its continuing exploration program at the approximately 340-square-kilometre Delta-1 gold project, located 50 kilometres west of Thunder Bay, Ont. Building on the Eureka gold discovery, Delta is advancing its first drill campaign at I-zone while evaluating additional gold occurrences along the Crayfish Creek fault corridor.
Delta-1 exploration highlights -- previously announced results
Recent disclosures highlight Delta's progress in advancing drilling at I-zone and identifying additional exploration targets beyond Eureka:
- Surface gold mineralization extended more than 400 metres eastward at I-zone, with channel results, including 4.85 grams per tonne (g/t) gold (Au) over 8.0 metres, 2.91 g/t Au over 8.3 metres and 4.23 g/t Au over 4.3 metres.
- Additional channel sampling returned 2.36 g/t Au over 15.1 metres and 3.81 g/t Au over 2.0 metres.
- Grab samples returned up to 24.7 g/t Au, including gold mineralization in sulphide-rich iron formation adjacent to mineralized dikes.
- New gold occurrences were identified over approximately six kilometres within the broader Crayfish Creek fault corridor.
- Delta's first drilling campaign at I-zone is underway, testing the continuity of gold-bearing veins and felsic dikes along strike and at depth as part of the previously announced 10,000-metre program targeting Eureka and I-zone.
Ron Kopas, chief executive officer (CEO) of Delta, commented:
"Eureka remains the foundation of our Delta-1 exploration story and our recent work highlights the potential to identify additional gold-bearing zones across this extensive property. At I-zone, we have moved from encouraging surface results to our first drill campaign, while regional prospecting has identified further gold occurrences along the Crayfish Creek fault corridor. We look forward to discussing this progress and our next exploration priorities with investors at SMI in Zurich."
I-zone channel sampling and drilling
On Sept. 21, 2026, Delta reported channel sampling results of 4.85 g/t Au over 8.0 metres in channel D1-26-TR17-01, 2.91 g/t Au over 8.3 metres in channel D1-26-TR20-07 and 4.23 g/t Au over 4.3 metres in channel D1-26-TR20-08. The results extended known surface gold mineralization at I-zone more than 400 metres eastward.
On Sept. 22, 2026, Delta announced the start of a 10,000-metre drill program targeting Eureka and I-zone. By Oct. 30, the company's first drill campaign at I-zone was under way, testing the continuity of gold-bearing veins and felsic dikes along strike and at depth.
On Oct. 30, 2026, Delta reported additional channel sampling results, including 2.36 g/t Au over 15.1 metres in channel D1-26-TR18-03 and 3.81 g/t Au over 2.0 metres in channel D1-26-TR16-08, from its I-zone surface program.
Gold mineralization at I-zone is primarily associated with approximately north-south-trending extensional quartz veins hosted within approximately east-west-trending felsic dikes.
Note: Channel samples were oriented to intersect the mineralized veins and, therefore, do not represent the true width of the host dikes. Observed true widths of the felsic dikes at surface are variable and range from less than one metre to approximately four metres.
Gold occurrences across the Crayfish Creek fault corridor
On Oct. 29, 2026, Delta reported results from 55 outcrop grab samples with gold values ranging from 0.1 to 24.7 g/t Au. Samples from sulphide-rich iron formation adjacent to mineralized dikes returned 16.1 g/t Au and 24.7 g/t Au.
Regional prospecting also identified new gold occurrences associated with shearing and quartz veining over approximately six kilometres south of the Crayfish Creek fault. Two occurrences comprise gold-bearing quartz veins in quartz-sericite schist and may define a common trend north of anomalous gold grains in till. These results broaden the range of geological settings being evaluated as Delta advances exploration beyond Eureka.
Note: Grab samples are selective by nature and may not represent the mineralization on the property.
Continuing exploration
Drilling is currently under way at I-zone as part of Delta's program targeting Eureka and I-zone. Trenching and channel sampling are also continuing, with hundreds of additional surface sample assays pending. Results will be released as they are received and interpreted.
On Oct. 6, 2026, Delta announced a second phase of till sampling designed to complete first-pass coverage across essentially the entire 340-square-kilometre property. Field collection has since been completed. The remaining results will be integrated with geological mapping, geophysical data and historical exploration records to rank anomalies and plan follow-up work.
This regional program is designed to identify potential mineralized bedrock beneath glacial cover and advance additional targets toward drilling.
Swiss Mining Institute conference -- Zurich
Delta will participate in the Swiss Mining Institute (SMI) conference at The Dolder Grand in Zurich, Switzerland, on Nov. 18, 2026, to Nov. 19, 2026, where management will highlight the company's exploration progress and meet with investors. Chief executive officer Ron Kopas is scheduled to present on Nov. 18 at 10 a.m. local time in Garden Salon 2.
Qualified person
Daniel Boudreau, PGeo, vice-president of exploration at Delta Resources, is the qualified person as defined by National Instrument 43-101, and has reviewed and approved the technical information contained in this news release.
Quality assurance/quality control
The channel and grab samples summarized in this news release were analyzed by AGAT Laboratories in Thunder Bay under Delta's QA/QC program, which includes the insertion of certified reference materials and blanks.
Channel samples containing visible gold or returning greater than 2.0 g/t Au on an initial 50-gram (g) fire assay underwent metallic screening using a one-kilogram (kg) pulverized sample screened to 106 microns, followed by fire assay with gravimetric finish. Full analytical and QA/QC details are provided in the Sept. 21, 2026, Oct. 29, 2026, and Oct. 30, 2026, news releases.
About Delta Resources Ltd.
Delta Resources is a Canadian mineral exploration and development company focused on advancing its Delta-1 gold project in Ontario. The company has identified a large, near-surface gold system located approximately 50 kilometres west of Thunder Bay, adjacent to the Trans-Canada Highway. The Delta-1 property covers approximately 340 square kilometres and hosts multiple gold-bearing corridors, including the Eureka gold deposit and the highly prospective I-zone-Crayfish-Creek fault trend.
The Eureka gold deposit extends over 2.5 kilometres in strike length and to depths exceeding 300 metres, with mineralization intersected to vertical depth of approximately 600 metres and remaining open in all directions. Highlights include drill intercepts such as 5.92 g/t Au over 31 metres (including 14.8 g/t Au over 11.9 m) and 1.79 g/t Au over 128.5 m.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.