20:30:16 EDT Thu 31 Oct 2024
Enter Symbol
or Name
USA
CA



Copper North Mining Corp (2)
Symbol COL
Shares Issued 77,475,973
Close 2018-01-05 C$ 0.08
Market Cap C$ 6,198,078
Recent Sedar Documents

ORIGINAL: Copper North drills 34.9 m of 0.65% Cu at Carmacks

2018-01-08 06:18 ET - News Release

Received by email:

File: NR_Jan8_2018_DrillResults.docx

January 08, 2018 
COPPER NORTH INTERSECTS 34.9 M OF 0.65% COPPER, 0.14 g/t GOLD, AND 2.47 g/t SILVER AT CARMACKS 

Vancouver, British Columbia - Copper North Mining Corp. ("Copper North" or the "Company") (TSX.V:COL) are pleased to a
--->nnounce results of drilling  on the Carmacks oxide Cu-Au-Ag project, Yukon, Canada. Seven holes were drilled within th
--->e zone 2000S as infill and small step-outs to better define the mineralized zone and the boundary between the sulphide
---> and oxide domains. Copper mineralization was intersected in all holes within the zone.

Highlights of the assays included in the extension area:

CN17-21: 34.9 m true width of 0.65% Cu, 0.14 g/t Au and 2.47 g/t Ag
CN17-15: 21.5 m true width of 0.65% Cu, 0.14 g/t Au and 2.93 g/t Ag
CN17-24: 49.5 m true width of 0.44% Cu, 0.13 g/t Au and 2.14 g/t Ag

Zone 2000S Assay results are given in the table below:

Hole
 From (m)
 To (m)
 Intersected width (m)
 Estimated true width (m)
 Au g/t
 Ag g/t
 Acid-soluble Cu%
 Total Cu%
 Style
 
 CN17-12
 18.43
 24.77
 6.34
 5.1
 0.09
 1.36
 0.23
 0.25
 Oxide
 
 CN17-12
 37.93
 40.60
 2.67
 2.25
 0.76
 12.62
 1.82
 1.96
 Oxide
 
 CN17-13
 79.38
 111.04
 31.66
 23.95
 0.10
 1.83
 0.25
 0.34
 Oxide
 
 CN17-15
 97.31
 121.92
 24.61
 21.53
 0.14
 2.93
 0.17
 0.65
 Oxide to Sulphide
 
 including
 97.31
 109.59
 12.28
 10.74
 0.11
 2.15
 0.26
 0.54
 Oxide
 
 and
 110.68
 121.92
 11.24
 9.83
 0.19
 4.05
 0.08
 0.83
 Sulphide
 
 CN17-18
 100.85
 107.90
 7.05
 5.09
 0.23
 3.98
 0.04
 0.78
 Sulphide
 
 CN17-21
 76.74
 123.44
 46.70
 34.91
 0.14
 2.47
 0.34
 0.65
 Oxide to Sulphide
 
 including
 76.74
 106.20
 29.46
 22.02
 0.13
 2.09
 0.47
 0.60
 Oxide
 
 and
 106.20
 123.44
 17.24
 12.89
 0.16
 3.12
 0.12
 0.73
 Sulphide
 
 CN17-24
 59.26
 120.40
 61.14
 49.5
 0.13
 2.14
 0.31
 0.44
 Oxide
 
 CN17-27
 28.9
 31.23
 2.33
 1.86
 0.10
 1.76
 0.32
 0.42
 Oxide
 
 CN17-27
 38.02
 41.91
 3.89
 3.11
 0.12
 1.67
 0.57
 0.63
 Oxide
 
 CN17-27
 53.62
 55.43
 1.81
 1.45
 0.46
 8.29
 0.81
 0.92
 Oxide
 
 CN17-27
 94.49
 97.54
 3.05
 2.44
 0.07
 1.55
 0.22
 0.36
 Oxide
 
 
Zone 2000S is located 340 meters south of the proposed open pit and mineralized material crops out on surface. The min
--->eralized zone tapers to the south and the north, but becomes wider with depth. It comprises oxide and sulphide copper 
--->mineralization hosted by a steeply east dipping tabular body of foliated amphibolite up to 50 meters wide. There is a 
--->significant oxide cap in Zone 2000S that extends to depths of up to 125 meters below surface with abundant malachite, 
--->azurite, chrysocolla and tenorite. The chalcopyrite-bornite-sulphide zone is open to depth.

The 2017 drilling has confirmed the high-grade tenor and excellent continuity of the zone. The increase in drill hole 
--->density may lead to increases in the level of confidence of parts of the existing Mineral Resource from Inferred to In
--->dicated or Measured categories. 

Dr. Harlan Meade, President and CEO commented "the value of Zone 2000S is that it represents an opportunity to extend 
--->the proposed 7 `year mine life. None of the zone is currently included in the mine plan or PEA. The 2017 drilling has 
--->focused on expanding and improving the confidence in the copper oxide resources, demonstrating potential and scope for
---> continued operation by exploring the highly prospective ground that surrounds the identified zones on the property".

Results are pending for the remaining 2017 holes in Zone 13; assays are expected to be reported shortly. 
Maps of the location of Zone 2000S and the drill holes are available on www.coppernorthmining.com.

QA/QC

Quality assurance and quality control procedures include the systematic insertion of duplicate and standard samples in
---> to the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and were shipped straight
---> to the preparatory laboratory of ALS Minerals in Whitehorse. All geochemical analyses were performed by ALS Minerals 
--->in North Vancouver. Total copper assays were performed by four-acid digestion with an AAS finish. Soluble copper assay
--->s were carried out by sulphuric acid digestion with an AAS finish. Gold was analyzed by a 30 g charge fire assay with 
--->an AAS finish. Silver was analyzed by four-acid digestion and ICP-AES finish. 

True widths were determined by construction of geological cross sections along drill fences, interpretation of the bou
--->nding surfaces of the mineralized zones, and the width of the mineralized zone was measured perpendicular to the zone 
--->boundaries at the centre point of the intersection. The technical information in this news release has been prepared, 
--->reviewed and approved by Dr. Harlan Meade, P.Geo, the President and CEO of Copper North, a Qualified Person within the
---> meaning of NI 43-101.

On behalf of the Board of Directors:

"Dr. Harlan Meade"
President, CEO and Director


About Copper North
Copper North is a Canadian mineral exploration and development company. Its assets include the Carmacks Project locate
--->d in the Yukon, the Redstone Property located in the Northwest Territories, and the Thor Property in British Columbia.
--->  Copper North trades on the TSX Venture Exchange under the symbol COL.
 For Further Information
Dr. Harlan Meade
President and Chief Executive Officer
Tel:     604.398.3451
Email: info@coppernorthmining.com
Web:   www.coppernorthmining.com


This news release includes certain forward-looking information or forward-looking statements for the purposes of appli
--->cable securities laws. These statements include, among others, statements with respect to the use of proceeds from the
---> Private Placement; and proposed exploration and development activities and their timing. These statements address fut
--->ure events and conditions and, as such, involve known and unknown risks, uncertainties and other factors, which may ca
--->use the actual results, performance or achievements to differ materially from those anticipated in such statements. Im
--->portant factors that could cause actual results to differ materially from the Company's expectations include, among ot
--->hers, the timeliness and success of regulatory approvals, the timing and success of future exploration and development
---> activities, exploration and development risks, market prices, exploitation and exploration results, availability of c
--->apital and financing, general economic, market or business conditions, uninsured risks, regulatory changes, defects in
---> title, availability of personnel, materials and equipment, unanticipated environmental impacts on operations and othe
--->r exploration risks detailed herein and from time to time in the filings made by the Company with securities regulator
--->s. In making the forward-looking statements, the Company has applied several material assumptions including, but not l
--->imited to, the assumptions that the Private Placement will receive regulatory approval, the proposed exploration and d
--->evelopment of the mineral projects will proceed as planned, market fundamentals will result in sustained metals and mi
--->neral prices, and any additional financing needed will be available on reasonable terms. The Company expressly disclai
--->ms any intention or obligation to update or revise any forward-looking statements whether as a result of new informati
--->on, future events or otherwise except as otherwise required by applicable securities legislation. 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the 
--->TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 



File: NR_Jan8_2018_DrillResults.pdf

                                                                              Copper North Mining Corp.
                                                                              Suite 1120   1095 West Pender St.
                                                                              Vancouver, BC V6E 2M6 Canada
                                                                              www.coppernorthmining.com

                                                                              T. 604.398.3210
                                                                              F. 604.398.3456
                                                                              Toll Free. 1.844.401.2646



                                                                                                    January 08, 2018

      COPPER NORTH INTERSECTS 34.9 M OF 0.65% COPPER, 0.14 g/t GOLD, AND 2.47 g/t
                            SILVER AT CARMACKS

    Vancouver, British Columbia   Copper North Mining Corp. ("Copper North" or the "Company") (TSX.V:COL)
    are pleased to announce results of drilling on the Carmacks oxide Cu-Au-Ag project, Yukon, Canada.
    Seven holes were drilled within the zone 2000S as infill and small step-outs to better define the mineralized
    zone and the boundary between the sulphide and oxide domains. Copper mineralization was intersected
    in all holes within the zone.

    Highlights of the assays included in the extension area:

              CN17-21: 34.9 m true width of 0.65% Cu, 0.14 g/t Au and 2.47 g/t Ag
              CN17-15: 21.5 m true width of 0.65% Cu, 0.14 g/t Au and 2.93 g/t Ag
              CN17-24: 49.5 m true width of 0.44% Cu, 0.13 g/t Au and 2.14 g/t Ag

    Zone 2000S Assay results are given in the table below:


                                                 Estimated                     Acid-
                  From             Intersected   true width    Au      Ag     soluble      Total
       Hole        (m)    To (m)    width (m)        (m)       g/t     g/t     Cu%         Cu%               Style
     CN17-12      18.43    24.77      6.34          5.1        0.09   1.36      0.23       0.25      Oxide
     CN17-12      37.93    40.60      2.67         2.25        0.76   12.62     1.82       1.96      Oxide
     CN17-13      79.38   111.04      31.66        23.95       0.10   1.83      0.25       0.34      Oxide
     CN17-15      97.31   121.92      24.61        21.53       0.14   2.93      0.17       0.65      Oxide to Sulphide
     including    97.31   109.59      12.28        10.74       0.11   2.15      0.26       0.54      Oxide
     and         110.68   121.92      11.24        9.83        0.19   4.05      0.08       0.83      Sulphide
     CN17-18     100.85   107.90      7.05         5.09        0.23   3.98      0.04       0.78      Sulphide
     CN17-21      76.74   123.44      46.70        34.91       0.14   2.47      0.34       0.65      Oxide to Sulphide
     including    76.74   106.20      29.46        22.02       0.13   2.09      0.47       0.60      Oxide
     and         106.20   123.44      17.24        12.89       0.16   3.12      0.12       0.73      Sulphide
     CN17-24      59.26   120.40      61.14        49.5        0.13   2.14      0.31       0.44      Oxide
     CN17-27      28.9     31.23      2.33         1.86        0.10   1.76      0.32       0.42      Oxide
     CN17-27      38.02    41.91      3.89         3.11        0.12   1.67      0.57       0.63      Oxide
     CN17-27      53.62    55.43      1.81         1.45        0.46   8.29      0.81       0.92      Oxide
     CN17-27      94.49    97.54      3.05         2.44        0.07   1.55      0.22       0.36      Oxide

    Zone 2000S is located 340 meters south of the proposed open pit and mineralized material crops out on
    surface. The mineralized zone tapers to the south and the north, but becomes wider with depth. It comprises
    oxide and sulphide copper mineralization hosted by a steeply east dipping tabular body of foliated
    amphibolite up to 50 meters wide. There is a significant oxide cap in Zone 2000S that extends to depths of
    up to 125 meters below surface with abundant malachite, azurite, chrysocolla and tenorite. The
    chalcopyrite-bornite-sulphide zone is open to depth.

1
                                                                                                                      
---> 2
The 2017 drilling has confirmed the high-grade tenor and excellent continuity of the zone. The increase in
drill hole density may lead to increases in the level of confidence of parts of the existing Mineral Resource
from Inferred to Indicated or Measured categories.

Dr. Harlan Meade, President and CEO commented "the value of Zone 2000S is that it represents an
opportunity to extend the proposed 7 `year mine life. None of the zone is currently included in the mine plan
or PEA. The 2017 drilling has focused on expanding and improving the confidence in the copper oxide
resources, demonstrating potential and scope for continued operation by exploring the highly prospective
ground that surrounds the identified zones on the property".

Results are pending for the remaining 2017 holes in Zone 13; assays are expected to be reported shortly.
Maps of the location of Zone 2000S and the drill holes are available on www.coppernorthmining.com.

QA/QC

Quality assurance and quality control procedures include the systematic insertion of duplicate and standard
samples in to the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and
were shipped straight to the preparatory laboratory of ALS Minerals in Whitehorse. All geochemical
analyses were performed by ALS Minerals in North Vancouver. Total copper assays were performed by
four-acid digestion with an AAS finish. Soluble copper assays were carried out by sulphuric acid digestion
with an AAS finish. Gold was analyzed by a 30 g charge fire assay with an AAS finish. Silver was analyzed
by four-acid digestion and ICP-AES finish.

True widths were determined by construction of geological cross sections along drill fences, interpretation
of the bounding surfaces of the mineralized zones, and the width of the mineralized zone was measured
perpendicular to the zone boundaries at the centre point of the intersection. The technical information in
this news release has been prepared, reviewed and approved by Dr. Harlan Meade, P.Geo, the President
and CEO of Copper North, a Qualified Person within the meaning of NI 43-101.

On behalf of the Board of Directors:

"Dr. Harlan Meade"
President, CEO and Director


About Copper North
Copper North is a Canadian mineral exploration and development company. Its assets include the
Carmacks Project located in the Yukon, the Redstone Property located in the Northwest Territories, and
the Thor Property in British Columbia. Copper North trades on the TSX Venture Exchange under the
symbol COL.
For Further Information
Dr. Harlan Meade
President and Chief Executive Officer
Tel: 604.398.3451
Email: info@coppernorthmining.com
Web: www.coppernorthmining.com


This news release includes certain forward-looking information or forward-looking statements for the purposes of
applicable securities laws. These statements include, among others, statements with respect to the use of proceeds
from the Private Placement; and proposed exploration and development activities and their timing. These statements
address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors,
which may cause the actual results, performance or achievements to differ materially from those anticipated in such
statements. Important factors that could cause actual results to differ materially from the Company's expectations
include, among others, the timeliness and success of regulatory approvals, the timing and success of future exploratio
--->n
and development activities, exploration and development risks, market prices, exploitation and exploration results,
availability of capital and financing, general economic, market or business conditions, uninsured risks, regulatory
 changes, defects in title, availability of personnel, materials and equipment, unanticipated environmental impacts on
operations and other exploration risks detailed herein and from time to time in the filings made by the Company with
securities regulators. In making the forward-looking statements, the Company has applied several material
assumptions including, but not limited to, the assumptions that the Private Placement will receive regulatory approval
--->,
the proposed exploration and development of the mineral projects will proceed as planned, market fundamentals will
result in sustained metals and mineral prices, and any additional financing needed will be available on reasonable
terms. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements
whether as a result of new information, future events or otherwise except as otherwise required by applicable securiti
--->es
legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
 


© 2024 Canjex Publishing Ltd. All rights reserved.