11:23:21 EDT Thu 16 May 2024
Enter Symbol
or Name
USA
CA



Ameriwest Lithium Inc
Symbol AWLI
Shares Issued 72,427,146
Close 2023-05-18 C$ 0.265
Market Cap C$ 19,193,194
Recent Sedar Documents

Ameriwest Lithium files NI 43-101 report for Thompson

2023-05-19 15:12 ET - News Release

Mr. David Watkinson reports

AMERIWEST LITHIUM FILES TECHNICAL REPORT ON THE THOMPSON VALLEY PROPERTY, ARIZONA, AND MOVES FORWARD WITH PERMITTING

Ameriwest Lithium Inc. has filed a technical report on its Thompson Valley lithium property located in west-central Arizona. The report, prepared under the requirements of National Instrument 43-101 and standards of the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), summarizes geological test work completed by the company in 2022, including geologic mapping, surface sampling and geophysics. It identifies six lithium exploration targets with potential to host 200 million to 400 million tonnes (220 million to 440 million tons) of deposits, with expected average grade of these deposits ranging from 114 to 842 parts per million Li. It recommends the company proceed with two phases of exploration as the next steps for the property. Phase 1 would consist of additional geophysics and permitting. Phase 2 would consist of drilling and sample analysis to begin the process of defining the deposit and its potential tonnage and grade. No mineral resources or reserves have yet been delineated on the property.

Ameriwest chief executive officer David Watkinson commented: "Our team was greatly encouraged by the outcome of our soil sampling conducted in 2022 at the Thompson Valley project. It is not exactly everyday occurrence to retrieve samples of over 1,000 ppm of lithium and as such we are excited to further our exploration plans. Producing a technical report is an essential milestone, enabling us to precisely document our findings and establish exploration targets for future programs."

About Thompson Valley project and technical report highlights

The property is located in a rural area in west-central Arizona, United States, in Yavapai county along the Kirkland Creek drainage between the towns of Kirkland to the southeast and Hillside to the southwest along County Road 15. Mineral rights consist of a combination of State of Arizona and U.S. federal mineral rights totalling 6,881 acres (2,785 hectares). Part of the land, 91 per cent or 6,263 acres (2,534.46 hectares), are state trust lands where the surface and minerals are owned by the state. Mineral rights for the balance of the property, 9 per cent or 618.47 acres (250.29 hectares), are owned by the U.S. fovernment under the jurisdiction of the Department of the Interior and managed by the Bureau of Land Management (BLM). Although the mineral rights on these federal lands are controlled by the U.S. government, they are of split estate, meaning the surface is private and held separately from the minerals. Development of the mineral rights has priority over the surface grazing rights.

A deposit of white clay was first discovered in Thompson Valley by Joseph Lyles in the mid-1950s. The State of Arizona identified the deposit as the White Hills lithium prospect in 1957. Shallow sampling of the area was conducted by the USGS in 1960 and it was determined that the clay is a lithium-bearing bentonite clay known as hectorite. Lithium contents of the samples were reported by the USGS in 1965, which included two locations on the mineral rights area.

Thompson Valley hosts Quaternary-Tertiary sediments covering the valley floor, with large basalt flows of the same age to the north and south. Precambrian granites and schists are exposed to the west and east. The valley floor sediments are volcanic ashes, tuffs and decomposed basalt, and granitic sediments which have been hydrothermally altered in part. There is evidence that the Thompson Valley deposit might have been a highly mineralized lake. The lake might have been fed by a mineralized hot spring and, as it cooled, various minerals like lithium precipitated out as carbonates. The lake deposits also included ash and tuff, which were altered to clay. There appears to be two forms of lithium in the Thompson Valley area: 1) the hectorite-like white, waxy, translucent clay with an elevated lithium content, and 2) the multicoloured clay-like sediment that is typically not white, waxy nor translucent, and has a high carbonate content and little actual clay content.

Exploration conducted by Ameriwest on the property began in 2022 and consisted of description of surface features and mapping the property, analyzing surface samples acquired from the area, and commissioning a satellite geophysical survey. A total of 205 samples were acquired and analyzed. Surface samples analyzed across the project area have lithium contents ranging from two to 1,295 ppm Li. Of these, 36 per cent had lithium contents greater than 200 ppm, 14 per cent were greater than 500 ppm and 3 per cent were greater than 1,000 ppm, with a mean of 227 ppm Li and standard deviation of 269 ppm Li. Most of the lithium-bearing samples are high in carbonate and reactive to acid (see press release dated Dec. 13, 2022, for details and information on quality assurance/quality control procedures).

From these samples, six main exploration target areas have been defined for follow-up exploration, covering an area of approximately 1,108 acres. Potential tonnage of these targets has been estimated to be 207 million to 414 million tonnes, based on estimated depths ranging from 75 to 150 feet (23 metres to 46 metres). Surface sample analyses within the six exploration targets range from 12 to 1,295 ppm Li. From the 123 samples within the combined target areas, 47 per cent had lithium contents greater than 200 ppm, 19 per cent had lithium contents greater than 500 ppm and 4 per cent were greater than 1,000 ppm, with a mean of 286 ppm Li and standard deviation of 287 ppm Li. Note that surface sampling does not necessarily correlate to grades that might be found in drilling but shows the potential for lithium to be found at depth through drilling below the surface sampling anomalies.

From the above analysis, detailed in the report, Ameriwest believes selected exploration targets at Thompson Valley show the potential for the property to host a deposit (or series of deposits) in the range of 200 million to 400 million tonnes (220 million to 440 million tons) in size with expected average grade ranging from 114 to 842 ppm Li. This will have to be confirmed with drilling, assaying and modelling.

The report recommends a phase 1 exploration program consisting of geophysics and permitting. Geophysics would consist of an REG satellite magnetic resonance survey. Permitting would consist of obtaining a right of way (ROW) to access the property, development of a drill plan (location of roads and drill pads), an archeological study of areas to be disturbed, a native plant survey of areas to be disturbed and completion of a geological field operations (GFOP) with the State of Arizona.

The report further recommends that after obtaining the necessary approvals, the company proceed with a phase 2 exploration program with an initial core drilling and sampling program. This would include approximately 11 drill holes totalling 3,300 ft (1,005 m) of drilling, project supervision, core logging and laboratory analysis. Mineralogical studies would also be completed, as well as an updated technical report. Note that phase 2 work is subject to permitting and other factors and the scope of work may be adjusted as required.

The report, entitled "Qualified Persons Technical Report on the Thompson Valley Lithium Project Exploration Target, Yavapai County, Arizona," was prepared on behalf of Ameriwest Lithium by Gregory J. Bell, MS, PE, of Senergy Engineering, and Brian A. Beck, MS, PGeo, CPG, of Brian Beck Consulting LLC, and has a report date of Jan. 31, 2023, and effective date of Jan. 17, 2023. Both authors are consultants working for Ameriwest and are considered non-independent qualified persons under National Instrument NI 43-101. The report can be found under the company's corporate filings on SEDAR.

Mr. Watkinson, PEng, a non-independent qualified person under NI 43-101, has reviewed and approved the technical content of this release. Mr. Watkinson is president and CEO of Ameriwest.

About Ameriwest Lithium Inc.

Ameriwest Lithium is a Canadian-based exploration company with a focus on identifying strategic lithium mineral resource projects for exploration and development. The company is currently focused on exploring its Thompson Valley lithium property located in Yavapai county, Arizona. Ameriwest owns 100 per cent of the property which covers 6,881 acres. As stated in the company's news release dated Jan. 31, 2023, the company entered into an option agreement with Nova Lithium Corp. whereby Nova can earn a 51-per-cent interest in the Edwards Creek Valley project encompassing 22,210 acres. Ameriwest Lithium also owns 100 per cent of 5,640-acre Little Smoky Valley property, 13,580-acre Railroad Valley property and its 7,600-acre Deer Musk East property in Nevada.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.