15:55:55 EDT Thu 02 May 2024
Enter Symbol
or Name
USA
CA



Asante Gold Corp
Symbol ASE
Shares Issued 444,914,986
Close 2023-11-03 C$ 1.41
Market Cap C$ 627,330,130
Recent Sedar Documents

Asante Gold's Grasshopper at 56,500 oz Au indicated

2023-11-06 11:10 ET - News Release

Mr. Dave Anthony reports

ASANTE ANNOUNCES MINERAL RESOURCE EXTENSION FOR THE GRASSHOPPER STARTER PIT DEVELOPMENT FOR BIBIANI GOLD MINE

Asante Gold Corp. has extended the Grasshopper pit mineral resource estimate. The Grasshopper pit is within the Bibiani mining lease and located less than two kilometres north of the Bibiani processing plant. Asante commenced mining at the Grasshopper pit in Q2 2023.

Highlights:

  • Resource definition drilling results confirm consistency of low-grade, high-tonnage mineralization mainly within the oxide transition material, representing immediately accessible mineralized material with high recovery rates:
    • Constrained indicated resources of 1.88 million tonnes 1.04 grams per tonne for 56,500 ounces of contained gold within an optimal pit shell of $1,850 (U.S.) per ounce gold price;
    • The MRE for Grasshopper is supported by approximately 10,000 metres of historical drilling and 8,800 metres of recent drilling;
    • Multiple shoots of mineralization are open along strike and down plunge beyond the $1,850 (U.S.) pit shell;
    • Further drilling is planned with potential to grow the mineral resource beyond the current pit shell;
  • Majority of mineralized material from the Grasshopper pit is within the oxide transition zone and expected to yield gold recovery above 90 per cent.
  • Starter pit development and mining commenced in Q2 2023.
  • Gold mineralization is associated with the sheared metasedimentary sequence bounded by well-defined footwall and hangingwall structures.

Dave Anthony, president and chief executive officer of Asante, stated: "I am pleased to announce this resource extension and development of the Grasshopper starter pit. This reflects our commitment to maximizing the full potential of our land position and mining operations. The results from our accelerated resource definition drilling are highly encouraging and underscore the remarkable consistency of the high-tonnage mineralization within the oxide transition material. With a constrained indicated resource of 56,500 ounces of gold at 1.04 grams per tonne within an optimized pit shell, we are poised to unlock substantial value from the Grasshopper pit.

"Notably, the majority of the mineralized material in the Grasshopper pit lies within the oxide transition zone with anticipated gold recovery exceeding 90 per cent and haulage distance of less than two kilometres to the process plant. Moreover, the presence of multiple shoots of mineralization along strike and down plunge beyond the existing pit shell highlights the promising opportunities for sustained expansion and underscores our long-term commitment to maximizing the value of this asset.

"With successful commencement of the starter pit and mining activities in Q2 2023, we look forward to further strengthening our position in the market and delivering exceptional value for our shareholders and stakeholders. Our ongoing commitment to responsible and sustainable mining practices remains unwavering as we continue to drive growth and create lasting value for all stakeholders."

Grasshopper estimation approach and parameters

The effective date of the MRE for Grasshopper is Nov. 25, 2022. The model was undertaken by the technical team of Mensin Gold Bibiani Ltd. and was reviewed by Kwamina Ackun-Wood, the former exploration manager and qualified person as defined by National Instrument 43-101.

Quality assurance/quality control

Asante employs a QA/QC program consistent with NI 43-101 and industry best practices. Surface drilling was conducted by GTS Drilling Services and Toomahit Drill Ltd. and was supervised by the Asante exploration teams. Selected drill core intervals were sawn in half with a diamond blade saw. Half of the sampled core was left in the core box and the remaining half was bagged and sealed. Asante utilizes accredited laboratories, and the samples were transported to either ALS Kumasi, SGS or the Intertek laboratory in Tarkwa, Ghana. Gold was analyzed by 50-gram fire assay with atomic absorption finish. Certified reference material (CRM) standards and coarse blank material are inserted every 20 samples. Drill intercepts cited do not necessarily represent true widths, unless otherwise noted.

Qualified person statement

Scientific and technical information contained in this news release was reviewed and approved by Kwamina Ackun-Wood, a member of the Australasian Institute of Mining and Metallurgy, and the former exploration manager for Mensin Gold Bibiani Ltd., a wholly owned subsidiary of Asante, a qualified person under NI 43-101.

About Asante Gold Corp.

Asante is a gold exploration, development and operating company with a high-quality portfolio of projects and mines in Ghana. Asante is currently operating the Bibiani and Chirano gold mines and continues with detailed technical studies at its Kubi gold development project. All mines and exploration projects are located on the prolific Bibiani and Ashanti gold belts. Asante has an experienced and skilled team of mine finders, builders and operators, with extensive experience in Ghana. The company is listed on the Canadian Securities Exchange, the Ghana Stock Exchange and the Frankfurt Stock Exchange. Asante is also exploring its Keyhole, Fahiakoba and Betenase projects for new discoveries, all adjoining or along strike of major gold mines near the centre of Ghana's Golden Triangle. Additional information is available on the company's website.

About the Bibiani gold mine

Bibiani is an operating open-pit gold mine situated in the Western North region of Ghana, with previous gold production of more than 4.5 million ounces. It is fully permitted with available mining and processing infrastructure on-site consisting of a newly refurbished three-million-tonne-per-annum process plant and existing mining infrastructure. Asante commenced mining in late February, 2022, with the first gold pour announced on July 7, 2022. Commercial production was announced Nov. 10, 2022.

For additional information relating to the mineral resource and mineral reserve estimates for the Bibiani gold mine, please refer to Asante's press releases dated July 18, 2022, and Sept. 1, 2022, and the technical report filed on its SEDAR+ profile on Sept. 1, 2022.

About the Chirano gold mine

Chirano is an operating open-pit and underground mine located in the western region of Ghana, immediately south of the company's Bibiani gold mine. Chirano was first explored and developed in 1996 and began production in October, 2005. The mine comprises the Akwaaba, Suraw, Akoti South, Akoti North, Akoti Extended, Paboase, Tano, Obra South, Obra, Sariehu and Mamnao open pits and the Akwaaba and Paboase underground mines.

For additional information relating to the mineral resource and mineral reserve estimates for the Chirano gold mine, please refer to Asante's press releases dated Oct. 15, 2022, and May 15, 2023, and the technical report filed on its SEDAR+ profile.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.