17:50:25 EDT Sat 27 Apr 2024
Enter Symbol
or Name
USA
CA



Advance Gold Corp (2)
Symbol AAX
Shares Issued 7,696,339
Close 2016-03-28 C$ 0.02
Market Cap C$ 153,927
Recent Sedar Documents

ORIGINAL: Advance Gold JV completes 85% earn-in on Kenyan permits

2016-04-18 14:31 ET - News Release

Received by email:

File: News Release - Acacia Earns 85%of Advance Gold's Kenya Projects (AAX 18Apr2016).docx

/

April 18, 2016           TSX-V: AAX

Acacia Mining plc Completes Earn-in at Advance Gold's West Kenya Properties
458 drill holes completed on Advance Gold's Licences

Advance Gold Corp. ("Advance Gold" or the "Company") is pleased to announce that Acacia Mining plc. (LON:ACA) ("Acacia
--->") through its subsidiary Acacia Exploration Kenya Ltd. has completed their earn-in on Advance Gold's three exploratio
--->n permits in Kenya, East Africa.  Acacia has spent in excess of the required $1.5M to earn 85% of Advance Gold's Speci
--->al License 265 (Bukura), Special License 266 (Sigalagala) and Special License 267 (Rosterman) that cover in total 40.4
--->km2.  

Acacia has spent, since November of 2012, a total of $18M on their West Kenya Project, which includes Advance Gold's t
--->hree exploration permits.  Exploration activities by Acacia incorporated geological mapping, extensive soil sampling, 
--->approximately 61,000m of Aircore drilling and over 35,000m of reverse circulation and diamond core drilling across the
--->ir entire project area.  The highest priority area for Acacia is within the Liranda Corridor where drilling has indica
--->ted a series of narrow vein, high grade zones within a 9km long structural corridor.  Advance Gold's Sigalagala and Bu
--->kura licences lie along this corridor.

Jim Gillis, President of Advance Gold comments, "It is good that we have Acacia as a partner on our Kenya exploration 
--->licences and to see their level of exploration commitment.  Their success in defining the very prospective Liranda Cor
--->ridor and their continued exploration in 2016 is a tribute the gold potential of this Lake Victoria Greenstone Belt."

Acacia's 2016 exploration budget for their West Kenya Project totals $8M with the majority of the exploration to be sp
--->ent on a high priority 4.5 km section of the Liranda Corridor.  Advance Gold's Sigalagala and Bukura licences bracket 
--->the high priority area.  Advance Gold has received a Q2 exploration budget and work program from Acacia that will see 
--->an airborne Vtem survey cover a portion of the Advance Gold ground. Advance Gold has elected not to participate in thi
--->s round of exploration and once the program has completed it will retain a 14.1% interest in the 3 permits.

Acacia's model for the Liranda Corridor is the Strzelecki & K2 Shear Zone with multiple shears/multiple shoots in Kund
--->ana, Australia, where Northern Star's Pegasus deposit has current total estimated resources of 3.0Mt at 11.6g/t Au for
---> 1.1 million ounces of gold (see NST news release dated 16 February 2015).  It is believed that the Liranda Corridor i
--->n Kenya is analogous to the high grade, steeply dipping and plunging oreshoots in Western Australia.  Advance Gold's S
--->igalagala Licence encompasses a 4km section of this gold mineralized Liranda Corridor.

Over the JV earn-in period, Acacia Exploration Kenya Limited has drilled a total of 458 holes; 11 as diamond core, 5 a
--->s reverse circulation and the remainder as Aircore.  A total of 6,672 samples were assayed from these drill holes.  
 

Table 1. Highlights of the drilling on Advance Gold's three Kenya Licences:

Hole ID
 Drill 
Type
 Azi degree
 Dip degree
 Length
(m)
 From
 (m)
 To
 (m)
 Interval
 (m)
 Au
 g/tonne
 
 LCD0013
 Diamond Core
 180
 -60
 200
 62.0
 65.0
 3.0
 8.74
 
 including
 
 
 
 
 62.0
 62.7
 0.7
 34.1
 
 and
 
 
 
 
 162.0
 163.0
 1.0
 3.50
 
 RODD001
 Diamond Core
 148
 -85
 507
 37.5
 38.1
 0.6
 16.20
 
 and
 
 
 
 
 266.0
 267.0
 1.0
 4.59
 
 and
 
 
 
 
 277.0
 277.5
 0.5
 2.89
 
 and
 
 
 
 
 281.88
 282.38
 0.5
 3.71
 
 and
 
 
 
 
 335.0
 338.0
 3.0
 3.51
 
 and
 
 
 
 
 446.5
 448.7
 2.2
 2.81
 
 ASRC036
 Reverse Circulation
 290
 -65
 131
 72.0
 86.0
 14.0
 1.17
 
 including
 
 
 
 
 80.0
 83.0
 3.0
 4.56
 
 KDAC0152*
 Air Core
 180
 -60
 35
 29.0
 35.0
 6.0
 30.90
 
 KDAC0135
 Air Core
 180
 -60
 10
 0.0
 10.0
 10.0
 1.75
 
 KDAC0161*
 Air Core
 180
 -60
 50.5
 41.0
 50.5
 9.5
 1.59
 
 including
 
 
 
 
 47.0
 50.5
 3.5
 4.20
 
 KDAC0558
 Air Core
 180
 -60
 35
 0.0
 3.0
 3.0
 3.08
 
 KDAC0617
 Air Core
 180
 -60
 41
 33.0
 39.0
 6.0
 7.70
 
 KDAC0180
 Air Core
 180
 -60
 80
 47.0
 80.0
 33.0
 0.38
 
 KDAC0125
 Air Core
 180
 -60
 42
 29.0
 35.0
 6.0
 1.69
 
 including
 
 
 
 
 29.0
 32.0
 3.0
 3.35
 
 KDAC0043
 Air Core
 180
 -60
 12
 0.0
 5.0
 5.0
 1.85
 
 KDAC0074
 Air Core
 180
 -60
 29
 5.0
 17.0
 12.0
 0.64
 
 KDAC0188
 Air Core
 180
 -60
 23
 0.0
 23.0
 23.0
 0.28
 
 including
 
 
 
 
 8.0
 14.0
 6.0
 0.89
 
 KDAC0041
 Air Core
 180
 -60
 20
 0.0
 2.0
 2.0
 2.83
 
 
The intervals do not necessarily indicate true width of mineralization, as its geometry is not known.
Average drilling depth from the Aircore drilling is relatively shallow at 30 metres.
* Hole ended in mineralisation.
Highlights of Acacia's latest results from the Liranda Corridor are shown in Figure 1.  The Acacia and Bushiangala sho
--->ots have been drilled and have targeted high grade mineralized intersections down to 500m below surface.  On both shoo
--->ts, multiple high grade mineralised structures are associated with significant sericite-carbonate+/-fuchsite-pyrite al
--->teration and moderate shearing.  Acacia has found that the high grade mineralization at depth has the potential to occ
--->ur "blind" or below weak near-surface anomalies.  Advance Gold considers the portion of the Liranda Corridor on the Si
--->galagala Licence to remain extremely prospective for deep gold mineralization.

/
Figure 1.  The highly prospective 9km long Liranda Corridor with Advance Gold's Bukura Licence (SL265) and Sigalagala 
--->Licence (SL266) shown. (Map courtesy of Acacia Mining plc.)

Maps also available at:   www.advancegold.ca

About Advance Gold Corp:  Advance Gold is focused on acquiring and developing gold and precious metal projects in stab
--->le jurisdictions with manageable risk.  The Company has and will continue to identify, acquire and add value to overlo
--->oked and undervalued assets.

About Acacia Mining plc:  Acacia is the largest gold producer in Tanzania. It has been operating in Tanzania for over 
--->a decade and during that time has produced nearly 8 million ounces of gold from a combination of open pit and undergro
--->und mines.  Acacia has three producing mines, all located in northwest Tanzania, together with several exploration pro
--->jects at various stages of development, including exploration land holdings in the highly prospective greenstone belts
---> in Western Kenya, Western Burkina Faso and Western Mali.
Acacia Mining plc is a UK public company with its headquarters in London. It is listed on the Main Market of the Londo
--->n Stock Exchange under the symbol ACA and it has a secondary listing on the Dar es Salaam Stock Exchange in Tanzania.

Qualified Person
Jeffrey Ackert, a director of the Company, is a Qualified Person as defined by National Instrument 43-101 and has revi
--->ewed and approved the exploration information and technical disclosure in this news release.  Mr. Ackert served as Vic
--->e-President, Exploration and Business Development of Advance Gold from June 9, 2008, until his resignation as a Vice-P
--->resident on September 24, 2015.

For further information, please contact:
Jim Gillis, President
Advance Gold Corp.
432 Royal Avenue
Kamloops, BC  V2B 3P7
Phone  1.250.574.5011
Fax  1.250.828.2269
www.advancegold.ca
This news release contains certain statements that may be deemed "forward-looking statements. Forward looking statemen
--->ts are statements that are not historical facts and are generally, but not always, identified by the words "expects", 
--->"plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that e
--->vents or conditions "will", "would", "may", "could" or "should" occur.  Although the Company believes the expectations
---> expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees 
--->of future performance and actual results may differ materially from those in forward looking statements. Forward looki
--->ng statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements 
--->are made. The Company undertakes no obligation to update these forward-looking statements in the event that management
--->'s beliefs, estimates or opinions, or other factors should change, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the 
--->TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.



File: News Release - Acacia Earns 85%of Advance Gold's Kenya Projects (AAX 18Apr2016).pdf

April 18, 2016                                                                             TSX-V: AAX

 Acacia Mining plc Completes Earn-in at Advance Gold's West Kenya Properties
                      458 drill holes completed on Advance Gold's Licences

Advance Gold Corp. ("Advance Gold" or the "Company") is pleased to announce that Acacia
Mining plc. (LON:ACA) ("Acacia") through its subsidiary Acacia Exploration Kenya Ltd. has
completed their earn-in on Advance Gold's three exploration permits in Kenya, East Africa. Acacia
has spent in excess of the required $1.5M to earn 85% of Advance Gold's Special License 265
(Bukura), Special License 266 (Sigalagala) and Special License 267 (Rosterman) that cover in total
40.4km2.

Acacia has spent, since November of 2012, a total of $18M on their West Kenya Project, which
includes Advance Gold's three exploration permits. Exploration activities by Acacia incorporated
geological mapping, extensive soil sampling, approximately 61,000m of Aircore drilling and over
35,000m of reverse circulation and diamond core drilling across their entire project area. The highest
priority area for Acacia is within the Liranda Corridor where drilling has indicated a series of narrow
vein, high grade zones within a 9km long structural corridor. Advance Gold's Sigalagala and Bukura
licences lie along this corridor.

        Jim Gillis, President of Advance Gold comments, "It is good that we have Acacia as a
        partner on our Kenya exploration licences and to see their level of exploration
        commitment. Their success in defining the very prospective Liranda Corridor and
        their continued exploration in 2016 is a tribute the gold potential of this Lake Victoria
        Greenstone Belt."

Acacia's 2016 exploration budget for their West Kenya Project totals $8M with the majority of the
exploration to be spent on a high priority 4.5 km section of the Liranda Corridor. Advance Gold's
Sigalagala and Bukura licences bracket the high priority area. Advance Gold has received a Q2
exploration budget and work program from Acacia that will see an airborne Vtem survey cover a
portion of the Advance Gold ground. Advance Gold has elected not to participate in this round of
exploration and once the program has completed it will retain a 14.1% interest in the 3 permits.

Acacia's model for the Liranda Corridor is the Strzelecki & K2 Shear Zone with multiple
shears/multiple shoots in Kundana, Australia, where Northern Star's Pegasus deposit has current
total estimated resources of 3.0Mt at 11.6g/t Au for 1.1 million ounces of gold (see NST news release
dated 16 February 2015). It is believed that the Liranda Corridor in Kenya is analogous to the high
grade, steeply dipping and plunging oreshoots in Western Australia. Advance Gold's Sigalagala
Licence encompasses a 4km section of this gold mineralized Liranda Corridor.

Over the JV earn-in period, Acacia Exploration Kenya Limited has drilled a total of 458 holes; 11 as
diamond core, 5 as reverse circulation and the remainder as Aircore. A total of 6,672 samples were
assayed from these drill holes.


                                                    1
 Table 1. Highlights of the drilling on Advance Gold's three Kenya Licences:

                      Drill                            Length        From            To        Interval       Au
      Hole ID                      Azi degree     Dip degree
                      Type                               (m)          (m)           (m)           (m)       g/tonne
                    Diamond
       LCD0013                     180        -60        200         62.0           65.0         3.0         8.74
                      Core
       including                                                     62.0           62.7         0.7         34.1
            and                                                      162.0         163.0         1.0         3.50
                    Diamond
      RODD001                      148        -85           507      37.5           38.1         0.6         16.20
                      Core
            and                                                      266.0         267.0         1.0         4.59
            and                                                      277.0         277.5         0.5         2.89
            and                                                     281.88        282.38         0.5         3.71
            and                                                      335.0         338.0         3.0         3.51
            and                                                      446.5         448.7         2.2         2.81
                    Reverse
      ASRC036                      290        -65        131         72.0           86.0         14.0        1.17
                   Circulation
       including                                                     80.0           83.0         3.0         4.56
    KDAC0152*       Air Core       180        -60         35         29.0           35.0         6.0         30.90
     KDAC0135       Air Core       180        -60         10          0.0           10.0         10.0        1.75
    KDAC0161*       Air Core       180        -60        50.5        41.0           50.5         9.5         1.59
       including                                                     47.0           50.5         3.5         4.20
     KDAC0558       Air Core       180        -60         35          0.0           3.0          3.0         3.08
     KDAC0617       Air Core       180        -60         41         33.0           39.0         6.0         7.70
     KDAC0180       Air Core       180        -60         80         47.0           80.0         33.0        0.38
     KDAC0125       Air Core       180        -60         42         29.0           35.0         6.0         1.69
       including                                                     29.0           32.0         3.0         3.35
     KDAC0043       Air Core       180        -60         12          0.0           5.0          5.0         1.85
     KDAC0074       Air Core       180        -60         29          5.0           17.0         12.0        0.64
     KDAC0188       Air Core       180        -60         23          0.0           23.0         23.0        0.28
       including                                                      8.0           14.0         6.0         0.89
     KDAC0041       Air Core       180        -60         20          0.0           2.0          2.0         2.83


          The intervals do not necessarily indicate true width of mineralization, as its geometry is not known.
                   Average drilling depth from the Aircore drilling is relatively shallow at 30 metres.
                                             * Hole ended in mineralisation.
Highlights of Acacia's latest results from the Liranda Corridor are shown in Figure 1. The Acacia and
Bushiangala shoots have been drilled and have targeted high grade mineralized intersections down
to 500m below surface. On both shoots, multiple high grade mineralised structures are associated
with significant sericite-carbonate+/-fuchsite-pyrite alteration and moderate shearing. Acacia has
found that the high grade mineralization at depth has the potential to occur "blind" or below weak

                                                            2
 near-surface anomalies. Advance Gold considers the portion of the Liranda Corridor on the
Sigalagala Licence to remain extremely prospective for deep gold mineralization.




                                                                                         Kenya




Figure 1. The highly prospective 9km long Liranda Corridor with Advance Gold's Bukura Licence
(SL265) and Sigalagala Licence (SL266) shown. (Map courtesy of Acacia Mining plc.)

Maps also available at: www.advancegold.ca

About Advance Gold Corp: Advance Gold is focused on acquiring and developing gold and
precious metal projects in stable jurisdictions with manageable risk. The Company has and will
continue to identify, acquire and add value to overlooked and undervalued assets.

About Acacia Mining plc: Acacia is the largest gold producer in Tanzania. It has been operating in
Tanzania for over a decade and during that time has produced nearly 8 million ounces of gold from a
combination of open pit and underground mines. Acacia has three producing mines, all located in
northwest Tanzania, together with several exploration projects at various stages of development,
including exploration land holdings in the highly prospective greenstone belts in Western
Kenya, Western Burkina Faso and Western Mali.
Acacia Mining plc is a UK public company with its headquarters in London. It is listed on the Main
Market of the London Stock Exchange under the symbol ACA and it has a secondary listing on the
Dar es Salaam Stock Exchange in Tanzania.
                                                 3
 Qualified Person
Jeffrey Ackert, a director of the Company, is a Qualified Person as defined by National Instrument 43-
101 and has reviewed and approved the exploration information and technical disclosure in this news
release. Mr. Ackert served as Vice-President, Exploration and Business Development of Advance
Gold from June 9, 2008, until his resignation as a Vice-President on September 24, 2015.


For further information, please contact:
Jim Gillis, President
Advance Gold Corp.
432 Royal Avenue
Kamloops, BC V2B 3P7
Phone 1.250.574.5011
Fax 1.250.828.2269
www.advancegold.ca
This news release contains certain statements that may be deemed "forward-looking statements. Forward
looking statements are statements that are not historical facts and are generally, but not always, identified by
the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar
expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the
Company believes the expectations expressed in such forward-looking statements are based on reasonable
assumptions, such statements are not guarantees of future performance and actual results may differ
materially from those in forward looking statements. Forward looking statements are based on the beliefs,
estimates and opinions of the Company's management on the date the statements are made. The Company
undertakes no obligation to update these forward-looking statements in the event that management's beliefs,
estimates or opinions, or other factors should change, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.




                                                         4
 


© 2024 Canjex Publishing Ltd. All rights reserved.