00:41:56 EDT Sun 12 May 2024
Enter Symbol
or Name
USA
CA



Allied Gold Corp
Symbol AAUC
Shares Issued 250,724,253
Close 2024-04-10 C$ 4.30
Market Cap C$ 1,078,114,288
Recent Sedar Documents

Allied Gold drills 4.5 m at 1.62 g/t Au at Kurmuk

2024-04-10 10:41 ET - News Release

An anonymous director reports

ALLIED GOLD ANNOUNCES POSITIVE EXPLORATION RESULTS AT KURMUK'S TSENGE GOLD PROSPECT AND NEW OXIDE DISCOVERIES AT SADIOLA, SUPPORTING THE COMPANY'S OBJECTIVES TO EXTEND MINE LIFE AND INCREASE PRODUCTION

Allied Gold Corp. has released positive exploration results from the Tsenge gold prospect, the most advanced of several high-quality exploration targets at the Kurmuk project. These results are part of a program that is expected to significantly increase the Mineral Resources and Mineral Reserves at Kurmuk, aligning with the company's goal of achieving a minimum of five million ounces of gold in mineral inventories at the project. Tsenge is strategically located along strike from the Ashashire deposit, which is planned as one of the initial two open pits for development at the project alongside the Dish Mountain deposit. Together, these initial planned pits contain 2.74 million ounces of gold in Proven and Probable Mineral Reserves and Kurmuk currently contains a total of 3.12 million ounces of gold in Measured and Indicated Resources and an additional 0.3 million ounces of gold in Inferred Resources. Significant increases to these figures are expected through further exploration at Tsenge and other near mine targets. The Kurmuk Project, currently in development and expected to enter production in the second quarter of 2026, is anticipated to have its mine life significantly extended by these multiple exploration targets, and in particular by the Tsenge gold prospect.

Additionally, the company is pleased to report positive exploration results at Sekekoto West (see Figures 2 and 3), which is one of the new significant targets at Sadiola and where ongoing exploration activities continue to successfully uncover additional near-surface oxide gold mineralization. These findings are set to enhance production at existing operations and supplement future ore feed to Sadiola.

These achievements highlight Allied's commitment to creating value through focused exploration, supported by this year's budget of $32 million. The aim of this investment is to extend mine life, improve production and margins, as the company focuses on enhancing efficiencies and profitability through the development of the Kurmuk Project, the Sadiola Expansion and the optimization initiatives at its producing assets.

Exploration Highlights:

Kurmuk Project, Tsenge Prospect:

Extended Mineralization at Tsenge Ridge: Ongoing exploration has revealed significant gold mineralization along a 9-kilometer strike length (see Figure 4), validated through soil sampling, geological mapping, and scout drilling. The Tsenge area (see Figure 5), one of four prioritized areas for Mineral Resource expansion, continues to demonstrate prolific geological potential.

High Economic Potential: Initial drill results and channel sampling have indicated economic thicknesses and grades of gold mineralization in hard rock both at the surface and at least up to 200 metres vertically below the outcrops.

Confirming High-Grade Sources: These findings verify that the gold-in-soil anomalies originate from significant gold grades exceeding 1.0 g/t Au in rock samples, aligning with the successful exploration outcomes at Dish Mountain and Ashashire-the two initial open pits that encompass all current Mineral Reserves. Exploration of high-priority targets has yielded exceptional results to date, including a 24-meter intercept with a grade of over 3 g/t Au near the surface in channel sample TSCH002.

Enhancement of Mineral Resource Base: These results mark a critical step toward defining a considerable orebody at Tsenge, supporting Allied Gold's strategy to significantly extend and improve Kurmuk's production profile and augment Mineral Resources. Allied is currently progressing the construction activities for the Project, anticipating commencement of production in mid-2026 after completing the planned $500 million capital investment. The current mineral inventory supports a production rate that in the first years is expected to exceed 290,000 ounces per year with a reserves-only mine life of approximately 10 years, which is now expected to be extended as the Tsenge gold prospect and other exploration projects continue to advance.

Long-Term Production Outlook: These exploration successes underpin the company's strategy to enhance Kurmuk's existing Mineral Reserves and Mineral Resources to support a strategic mine life of over 18 years, with annual gold production exceeding 250,000 ounces at an AISC(1) below $950/oz.

Robust Oxide Discovery at Sekekoto West in Support of Sadiola:

Established Resource Base: Since acquiring the Sadiola Project in 2021, Allied has identified over 15 million tonnes of economic oxide mineralization within the near-mine footprint, significantly bolstering the oxide resource base essential for the existing and planned processing infrastructure.

Continuous Exploration Efforts: Ongoing exploration activities, including at Diba, Sekekoto West, FE4, and Tambali South, are critical parts of Allied's strategy to leverage the existing resources and infrastructure to maximize production and cashflows in the short term.

New Near-Mine Oxide Discovery at Sekekoto West: Drilling at Sekekoto West has uncovered a new oxide deposit, set to contribute additional feed to the Sadiola plant. This deposit, located 2 km south of the Sadiola Processing Plant, underscores the ongoing potential for resource expansion within the mining license and covers a zone that has been historically underexplored, presenting significant new opportunities for resource growth over approximately 2 km of strike. Recent drilling has extended the known mineralization by an additional 100m to the north, with plans to test further northward extensions by another 300m in Q2, aiming to uncover potential linkages and oxide mineralization towards the FE3S rock storage facilities.

Strategic Corridor between Sekekoto and S12: The discovered corridor linking Sekekoto to the high-grade S12 prospect represents a promising target for further oxide ore discoveries. This corridor holds the potential to continue adding incremental higher-grade, lower-cost oxide ore feed to the Sadiola mill, ensuring enhanced throughput and efficiency, especially during Sadiola's expansion. Allied's current exploration model indicates the potential for uncovering significant mineralization between these two areas and in other prospective areas across the Sadiola land package. This model is actively being tested, and could substantially increase oxide gold ounces available for extraction. Exploration results to date continue to corroborate the company's exploration model for Sadiola.

Integrated Phased Expansion with Recovery Enhancement Strategy: Increasing the oxide mineral inventory allows Sadiola to continue producing at elevated levels while incurring lower near-term capital costs as it pursues an integrated expansion of its existing processing infrastructure. With the addition of Diba and other oxide ore sources, Allied expects to support production levels between 200,000 and 230,000 ounces per year over the next two years at an attractive AISC(1), resulting in robust cash flows as it completes the implementation the Phase 1 expansion by early 2026. Further additional oxide discoveries could enhance the production profile of the Phase 1 expansion through 2028 meaningfully impacting its cash flow and returns. Furthermore, the Phase 2 Expansion, which is planned as a new processing plant to be built starting in late 2026 and dedicated to processing fresh rock and oxides at a rate of up to 10 Mt per year and starting in 2029, is expected to increase production to an average of 400,000 ounces per year for the first four years and 300,000 ounces per year on average for the mine's 19-year life, with AISC(1) expected to be below $1,000 per gold ounce. The discovery of additional economic oxide mineralization has the potential to improve upon these targets leveraging the installed processing capacity at Sadiola. Concurrently, Allied is advancing metallurgical test work and studies aimed at improving metallurgical recoveries by over 10% through flotation and concentrate leaching techniques. This initiative is set to significantly enhance the financial performance of the Sadiola Project, reinforcing the company's focus on operational excellence and long-term value creation for stakeholders.

Tsenge Gold Prospect

The Tsenge gold prospect is located within the Proterozoic Kurmuk Greenstone Belt, part of the Western Ethiopian Greenstone Belt. Positioned along strike from the Ashashire Gold Deposit-which contains over 1.4 Moz of gold at a grade of 1.61 g/t within 27.8 Mt in Proven and Probable Mineral Reserves-the prospect is approximately 6 km southeast of the planned Kurmuk Project processing plant. Since 2022, Allied has undertaken extensive prospecting at Tsenge, involving soil sampling, geological mapping, and channel sampling, along with the initiation of scout diamond core drilling consisting of 104 diamond core holes spaced 200 metres apart to test the area thoroughly with the aim of extending mineralization, confirming high-grade sources of ore and ultimately the increased economic potential of the project. To date, 11 core holes have been completed, primarily focused on the Porcupine target in the north of the Southern Sector, south of Mestefinfin Hill, and at the Setota target in the far south of the Tsenge Ridge line, separated by some 2 km. These drillholes have the objective of testing the northern and southern extent of the alteration system in this area (see Figures 6-8). During the development of drill access roads, exposures of the mineralized shear zones were systematically sampled as a series of face channels, on a 1m basis, with DGPS survey pickup of the sample positions. To date, 6 channels from TSCH001 to TSCH006 at the Setota target have been completed for a total of 972m sampled, and assay results have been returned for TSCH001 and TSCH002 (see Table 1). TSCH001 returned a single intersection and was sampled predominantly in the hanging wall metavolcanics outside of the carbonate alteration zone. TSCH002 was sampled across the mineralization and produced significant intercepts which are presented in Table 2 below. The highest-grade intersections returned over 1m are 30.8 g/t Au, 27.5 g/t Au, 26.1 g/t Au and 12.5 g/t Au and correspond to zones of swarms of extensional veining, with the broader 1-2 g/t Au zones corresponding with a distinct chocolate brown oxidized zone after sulphide and carbonate alteration hosted highly strained metasediments.

At the end of March, the 11 completed core holes totaled over 3,308 metres in depth, with significant findings across multiple sections. Holes TSDD001-TSDD008, drilled across three section lines spaced at 200m, tested 600m of veining and carbonate alteration. Notably, drill hole TSDD001 yielded an intersection of 4.5 metres at 1.62 g/t of gold from 146.39 metres with true thickness estimated at 15% of the drill hole intersection, while hole TSDD002 on the same section intersected 3.51 metres at 0.51 g/t of gold from 159 metres (true thickness of 67% of the drill hole intersect), 13.57 metres at 1.14 g/t of gold from 204.43 metres (true thickness of 95% of the drill hole intersect), and 6.00 metres at 0.77 g/t of gold from 256 metres (true thickness of 95% of the drill hole intersect). Holes TSDD009-TSDD011 were drilled at the Setota target in the south of the prospect. Assays were received for TSDD009, and significant intersections made, intersecting multiple zones. Selected highlights are as follows; 4.36m at 0.72 g/t Au from 130.64m, 11.67m at 0.91 g/t Au from 139.47m, 3.66m at 0.85 g/t Au from 216.75m, 3.57m at 0.65 g/t Au from 216.75m, 3.57m at 0.65 g/t Au from 229.43m, and 3.53m at 0.77 g/t Au, 6m at 0.81 g/t Au from 271m, 5.82m at 0.62 g/t Au from 283.18m, and 3.5m at 0.91 g/t Au from 296.5m (true thickness 64% of drillhole intersect). Assays for subsequent holes are pending, promising further insights into this mineral-rich area.

Significance to Kurmuk: These initial results from channels and drillholes demonstrated broad gold mineralization with economic grades in hard rock at surface and at least up to 200m vertically below outcrop. These results confirm that the gold-in-soil anomalism of greater than 100ppb Au is derived from significant gold grades of greater than 1.0 g/t Au in rock, consistent with the company's experience at the Dish Mountain and Ashashire gold deposits. Furthermore, drilling to date has intersected multiple zones on individual section lines, with continuity to be tested by further drilling. Initial results and ongoing mapping from channel sampling show a 50-meter-wide gold bearing zone with multiple individual drillhole intersections of up to 12 meter true thickness near surface with grades over 1.0 g/t hereby confirming the robust exploration model and the prospectivity of Tsenge. This positive development, considering the scale of the anomaly defined on the Tsenge Ridge line-with the core anomaly covering a strike of 5.4 km-indicates a substantial mineralized zone which the company continues to advance.

These positive exploration results at Tsenge not only support the potential for expanding the mineral inventory at this target but also across the entire Kurmuk Project, where other similar targets and anomalies have been identified. Allied Gold is applying the same proven and efficient exploration model to these areas, to underpin an expanded, long-term production outlook based on an expanded mineral inventory. This strategy aims to enhance the overall asset base of Allied Gold, aligning closely with the strategic goal of creating long-lasting value for its stakeholders and advancing towards the company's target of achieving a minimum of five million ounces of gold in mineral inventories at the Kurmuk Project.

Sekekoto West prospect

The Sekekoto West prospect is located within the Sadiola permitted mining area, some 6 km south-east of the processing plant. Historical drilling identified weak oxide gold anomalism in reverse circulation drillholes which were drilled on wide spaced lines, located 500m west of the historically mined Sekekoto oxide gold deposit. Allied's exploration team followed this up with two initial heel to toe RC fence drill lines completed in early 2022, for 11 RC holes, with lines spaced at 200m (see Table 3). SARC562 intersected mineralization hosted in carbonate rock, and reported a significant intersection of 17m at 2.92 g/t Au from 46m (true thickness of 26% of the drill hole intersect). Representing a steep dipping zone of high-grade mineralization in fresh rock. This initial drillhole intersection was very encouraging and was followed up with 4 subsequent phases of RC drill programs during 2023 and continued in 2024. These programs extended the known strike of mineralization and infilled on oxide intersections to a 25m spacing.

The most recent phase of drilling was in progress at the end of Q1 and included core tails to define fresh rock mineralization that occurs within a tectonic fault breccia with interstitial carbonate and sulphide alteration. At end March, a total of 152 holes for 14,551m of RC and 1,816m of core drilling had been completed. This work has allowed for an Inferred Resource to be estimated within a US$1,800 resource pit optimisation to help guide further exploration work and planning. Assays are pending for holes drilled in Q1 2024.

Furthermore, recent drilling has extended the strike of known mineralization for a further 100m to the north, and a step out of a further 300m to the north has been designed for drilling in Q2. These results confirm the opportunity to explore the space between the S12 high grade oxide deposit and historically known mineralization that exists under the FE3S rock storage facility, to better understand any linkages that may exist, and the preservation of the oxide mineralization with respect to the transported laterite cap. This area covers approximately 2 km of strike that has been poorly tested by exploratory drilling to date and represents an opportunity to incrementally build mineral resources for the Project.

Significance to Sadiola: Having defined an initial Mineral Resource at Sekekoto West and possessing the prospect of extending new oxide mineralization towards S12 for an additional nearly 2 km of strike, Allied confirms the potential to continue adding incremental higher-grade, lower-cost oxide ore feed to the Sadiola mill. This addition is expected to enhance near-term cash flows, production, and reduce costs. Furthermore, other oxide targets remain on the Sadiola property, which the company is actively advancing in 2024 and 2025.

U pcoming Catalysts and Events

The company has a series of notable upcoming events.

Q1 2024 earnings - May 9, 2024

Annual General Meeting - May 10, 2024, at 11:00 a.m. EST

Exploration update - details on Oume exploration in Cote d'Ivoire coming in May

Further updates on the development of Kurmuk

Further updates on optimizations and improvements of existing operations

Allied Gold will release its first quarter 2024 operational and financial results after the market closes on Thursday, May 9, 2024, Eastern Standard Time ("EST"). The company will then host a conference call and webcast to review the results on Friday, May 10, 2024, at 8:30 a.m. EST.

First Quarter 2024 Conference Call

Toll-free dial-in number (Canada/US):   1-800-898-3989

Local dial-in number:  416-406-0743

Toll Free (UK):  00-80042228835

Participant passcode:  5324345 followed by the number sign

Webcast:  on the Allied Gold website

Conference Call Replay

Toll-free dial-in number (Canada/US):  1-800-408-3053

Local dial-in number:  905-694-9451

Passcode:  6354190 followed by the number sign

The conference call replay will be available from 12:00 p.m. EST on May 10, 2024, until 11:59 p.m. EST on June 9, 2024.

Qualified Persons

Except as otherwise disclosed, all scientific and technical information contained in this press release has been reviewed and approved by Sebastien Bernier, P.Geo (Vice President, Technical Performance and Compliance). Mr. Bernier is an employee of Allied and a "Qualified Person" as defined by Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Assurance and Quality Control

Allied Gold incorporates a Quality Assurance and Quality Control ("QA/QC") program for all of its mines and exploration projects which conforms to industry best practices.

Kurmuk - sample preparation is completed on site at the Exploration Camp sample preparation facility, which is maintained and protocols audited by Allied's laboratory consultant on a bi-annual basis.

Pulp samples are dispatched via secure courier from Asosa to Addis, received by the company, cleared with the ministry of mines for export, and exported with secure courier to ALS Geochemistry, Perth, Australia. Gold is analysed by fire assay with a 50 gram aliquot and AAS finish (lab code: Au-AA25). Au-AA25 is certified from 0.01 to 100 g/t gold. Rejects and remaining half-core stored on site for the period for archival purposes. Check samples are completed at Intertek Perth using a 50 gram fire assay method.

Mali, Sadiola - sample preparation is on site at the dedicated Exploration facility sample prep at Sadiola. The operation protocols are audited by Allied's laboratory consultant on a bi-annual basis.

Pulp samples are dispatched in secure boxes by plane to Bamako, and collected by the laboratory agent from the plane. Assays are completed at Bureau Veritas, Bamako Gold is analysed by fire assay with a 50 gram aliquot and AAS finish (lab code: FA50). FA50 is certified from 0.01 g/t to 10 g/t Au, over analyses are completed by gravimetric finish method (FA550). Rejects and remaining half-core stored on site. Check sample assays are completed at ALS Perth using a 50 gram fire assay method.

All exploration diamond drill cores are split in half by core sawing and sampled at appropriate intervals for assay. The remaining core, and pulps are stored on-site in a secure location. We disposed of the rejects at the lab after the QA/QC was complete.

Certified reference standards, blanks and duplicates (preparation and analytical) are routinely inserted into the sample stream as a control for assay accuracy, bias, precision and contamination. The results of these checks are tracked and failures are re-analyzed. This information also includes pulp checks carried out in the secondary lab.

About Allied Gold Corporation

Allied Gold is a Canadian-based gold producer with a significant growth profile and mineral endowment which operates a portfolio of three producing assets and development projects located in Cote d'Ivoire, Mali, and Ethiopia. Led by a team of mining executives with operational and development experience and proven success in creating value, Allied Gold aspires to become a mid-tier next generation gold producer in Africa and ultimately a leading senior global gold producer.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.