22:44:15 EDT Sat 27 Apr 2024
Enter Symbol
or Name
USA
CA



Noram Ventures Inc
Symbol NRM
Shares Issued 137,030,333
Close 2016-11-03 C$ 0.065
Market Cap C$ 8,906,972
Recent Sedar Documents

Noram files NI 43-101 Clayton Valley technical report

2016-11-03 07:36 ET - News Release

Mr. Mark Ireton reports

NORAM FILES TECHNICAL REPORT ON ITS LITHIUM BRINE/CLAY PROJECT IN CLAYTON VALLEY, NEVADA

Bradley Peek, MSc, certified professional geologist, has completed an initial National Instrument 43-101 technical report on Noram Ventures Inc.'s 100-per-cent-owned Clayton Valley lithium brine/clay project. The technical report includes a detailed review of the exploration work completed to date, interpretations and conclusions, and recommendations for the next phases of work.

Project overview

Noram's land position in Nevada's Clayton Valley consists of 888 placer claims covering 17,738 acres (7,178 hectares) in two non-contiguous claim blocks. The perimeter of Noram's claims is located within one mile (1.6 kilometres) of Albemarle Corp.'s lithium brine operations. Albemarle produces lithium at its plant from deep wells that pump lithium-rich brines from the basin beneath the Clayton Valley playa. The Albermarle plant is the only lithium producer in the United States and has been producing lithium at this location continuously since 1967.

While lithium brines may also exist beneath Noram's claims, the company has chosen to focus its initial efforts on the lithium-rich sediments (claystones).

In three phases of surface sampling Noram has established that lithium-rich sediments occur at surface over a large portion of its claims. This includes an area greater than one square mile (2.6 square kilometres) on the Zeus claim block where sample assay values ranged from a maximum of 1,670 parts per million Li to a minimum of 74.2 ppm Li and averaged 620.6 ppm lithium over the 77 samples tested.

In some areas the lithium-rich sediments are at least 100 feet (30 metres) thick and the base of these sediments has not been found in surface showings. Other sampling farther southwest on Noram's South block has discovered isolated areas of what appear to be the same sediments with similar anomalous lithium assays. This extension covers an area with a strike length of more than six miles (10 kilometres). However, it is yet to be determined if the sedimentary units are continuous over this entire length.

One of the keys to Noram's project is to determine if lithium can be economically extracted directly from the sediments. To this end, Noram commissioned Membrane Development Specialists LLC to investigate the amenability of the sediments to lithium extraction using new, environmentally friendly membrane processes. Its findings, although preliminary in nature, have shown that the bulk sample sediments tested were amenable to an acid leach, ultrafiltration and nanofiltration process to separate the lithium from the sediments and remove a large portion of the magnesium and calcium with no rejection of lithium.

Based on the interpretations and conclusions from exploration work and testing to date, it is recommended that Noram:

  1. Begin to quantify the mineralization through a drilling program (plus or minus 55 core holes ranging from 60 to 80 feet (18 to 24 metres) in depth) and at the same time continue to explore extraction methods to recover lithium from the sediments;
  2. Conduct a gravity survey over both of its claim blocks on a 250 m by 250 m grid to define basement topography in preparation for a deep drill hole to test for aquifers which may contain lithium salts.

The complete NI 43-101 technical report is available on SEDAR and the company's website.

The technical information contained in this news release has been reviewed and approved by Mr. Peek, who is a qualified person with respect to Noram's Clayton Valley lithium project as defined under National Instrument 43-101.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.