15:19:06 EST Mon 23 Nov 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Pure Gold Mining Inc
Symbol PGM
Shares Issued 404,405,033
Close 2020-12-04 C$ 2.57
Market Cap C$ 1,039,320,935
Recent Sedar+ Documents

Pure Gold drills 2.9 m of 23.4 g/t Au at Pure Gold

2020-12-07 06:58 ET - News Release

Mr. Darin Labrenz reports

UNDERGROUND DRILLING INTERSECTS 23.4 G/T GOLD OVER 2.9 METRES, INCLUDING 50.1 G/T GOLD OVER 1.0 METRE AT THE PUREGOLD MINE

Pure Gold Mining Inc.'s underground exploration drilling has intersected high-grade gold mineralization near the existing main ramp access. Drilling has successfully extended gold mineralization out from planned stopes, discovered new gold zones that are being integrated into the mine plan and has confirmed stopes scheduled for near-term production.

Drilling results highlights:

  • 23.4 grams per tonne gold over 2.9 metres from drill hole PGU-0143, including 50.1 g/t gold over 1.0 metre;
  • 10.3 g/t gold over 6.0 metres from drill hole PGU-0150, including 27.7 g/t gold over 1.0 metre;
  • 13.7 g/t gold over 2.2 metres and 13.9 g/t gold over 1.0 metre from drill hole PGU-0144;
  • 14.3 g/t gold over 1.5 metres from drill hole PGB-0179;
  • 11.6 g/t gold over 1.9 metres from drill hole PGB-0183.

"These latest high-grade gold intercepts continue to bolster our belief that continued high-grade growth will add to the mine plan as we open up new zones. Our continued underground drilling success in concert with our ongoing surface exploration program forms the foundation of our near-term and extended growth plan for the Pure Gold mine," stated Darin Labrenz, president and chief executive officer of Pure Gold. "The Pure Gold mine will be one of the highest-grade gold mines globally, and newly discovered gold zones show potential to add near-term tonnes to our mine plan, with expected lower development costs owing to close proximity to existing development. In addition to ongoing underground drilling, we are actively drilling from surface on several new discovery targets across our seven-kilometre gold corridor. With initial gold production imminent, we will continue to deliver exploration success, demonstrate the scalability of our Pure Gold mine, and deliver on our objective of building a multigenerational mine in Red Lake, Canada."

Diamond drilling continues to identify extensions to design stopes, providing opportunity for further high-grade tonnes from existing or planned development. Drill holes PGU-0143, PGU-0144 and PGU-0145 have identified a potential new stope accessible from the existing 1300 access drift and adjacent to the main ramp between the 4 and 5 levels. This area will be targeted by further test holes to refine stope design. PGU-0150 was drilled between a high-grade intercept from surface hole PG16-191 and planned ore development, successfully intersecting a broad zone of high-grade gold mineralization identifying the potential for additional ore volumes in this area. PGU-0159 has identified an extension of the MV-1225-4080 stope and PGB-0182 and PGB-0183 have resulted in the identification of new mineralization in the footwall to the MV-1355-4055 stope, which will be followed up with further drilling.

Drill results summary

        NEW ASSAY RESULTS FROM SELECT DRILL HOLES

Hole ID            From           To       Length        Gold
                    (m)          (m)          (m)       (g/t)

PGU-0143            9.3         12.2          2.9        23.4
incl.              11.2         12.2          1.0        50.1
                   62.9         64.6          1.7         7.2
PGU-0144            7.4          9.5          2.2        13.7
                   16.1         17.1          1.0        13.9
PGU-0145           24.0         26.1          2.1         6.5
incl.              25.0         26.1          1.1         9.4
PGU-0150          133.5        152.0         18.6         5.2
incl.             138.5        139.5          1.0        15.3
and incl.         143.0        149.0          6.0        10.3
incl.             147.0        148.0          1.0        27.7
PGU-0159          101.7        102.7          1.0        15.2
PGB-0179            0.0          2.9          2.9         7.3
including           0.8          2.3          1.5        14.3
PGB-0182            8.0          8.6          0.6        15.7
PGB-0183           26.1         28.0          1.9        11.6

* Assay composites were calculated using uncut assays and 
true widths are interpreted to vary from 70 to 90 per cent 
(80 per cent, on average) of reported core lengths.

About Pure Gold Mining Inc.

The Pure Gold mine, located in the heart of Red Lake, is Canada's next gold mine. Fully financed, the project is on track to deliver near-term gold production into a rising Canadian gold price environment, with first gold pour scheduled for late 2020. The orebody is situated within a seven-kilometre-long gold system that is wide open for expansion at depth and along strike, and multiple discoveries by the company suggest potential opportunities for near-term growth.

Quality assurance/quality control and core sampling protocols

Drill core and test hole samples are submitted to SGS Minerals in Red Lake, Ont., and drill core samples to ALS Minerals in Thunder Bay, Ont. Surface exploration core samples are sawn with a diamond-bladed saw and half-core retained for further study. Underground core samples are whole core sampled after being detail logged and photographed. Samples processed at SGS include NQ- and EW-size whole core samples and test hole sludge samples and are prepared by drying and crushing to 75 per cent less than two mm, a riffle split of 250 g, and pulverization of the split to better than 85 per cent passing 106 microns. Gold analysis is completed in the SGS Red Lake lab with a 30 g fire assay and AAS (atomic absorption spectroscopy) finish (code GO-FAA30V10 for mine samples and GE-FAA30V5 for exploration samples). Mine samples returning greater than 100 g/t Au and exploration samples returning greater than five g/t Au are reassayed with a gravimetric finish (code GO-FAG30V). Mineralized zones with visible gold are also analyzed by a 500 g screen fire assay with screening to 106 microns (code GO-FAS30M). Duplicate 30 g fire assays are conducted on the screen undersize and combined with an assay of the entire oversize fraction.

NQ drill core samples processed at ALS include sample preparation by crushing to 70 per cent less than two mm, a rotary split of one kilogram and pulverization of the split to better than 8 per cent passing 75 microns. Sample pulps are shipped to the ALS assay laboratory in North Vancouver, B.C., for gold analysis with a 30 g fire assay and AAS finish (code Au-AA23). Samples returning greater than five g/t Au are reassayed with a gravimetric finish (code GRA21). Mineralized zones with visible gold and shoulder samples are also analyzed by a one kg screen fire assay with screening to 100 microns.

A duplicate 30 g fire assay is conducted on the screen undersize with assaying of the entire oversize fraction (code Au-SCR21).

Control samples (certified standards and uncertified blanks), along with field, prep and pulp duplicates, are inserted on a regular basis. Results are assessed for accuracy, precision and contamination on a continuing basis.

Qualified persons and 43-101 disclosure

Phil Smerchanski, PGeo, vice-president, exploration, for the company, is the designated qualified person for this news release within the meaning of National Instrument 43-101 and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.