04:55:19 EDT Wed 08 Apr 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Marathon Gold Corp
Symbol MOZ
Shares Issued 212,234,586
Close 2021-02-02 C$ 2.71
Market Cap C$ 575,155,728
Recent Sedar+ Documents

Marathon Gold drills six m of 19.85 g/t Au at Valentine

2021-02-02 07:41 ET - News Release

Mr. Matt Manson reports

MARATHON GOLD REPORTS FINAL 2020 DRILL RESULTS ANDA 2021 EXPLORATION PROGRAM

Marathon Gold Corp. has released fire assay data from the final 15 drill holes completed as part of the 2020 exploration program at the Valentine gold project, central Newfoundland. These latest results are all derived from within the 1.5-kilometre-long Berry zone. Highlights include:

  • VL-20-942 intersected 19.85 grams per tonne gold over six metres, including 111.62 g/t Au over one metre and 2.56 g/t Au over 20 metres, including 17.54 g/t Au over one metre and 20.00 g/t Au over two metres.
  • VL-20-946 intersected 9.37 g/t Au over six metres including 52.02 g/t Au over one metre and 10.76 g/t Au over two metres, including 16.64 g/t Au over one metre and 6.75 g/t Au over two metres, including 11.65 g/t Au over one metre.
  • VL-20-947 intersected 1.47 g/t Au over 18 metres, including 11.20 g/t Au over one metre and 0.88 g/t Au over 22 metres and 1.06 g/t Au over nine metres and 0.74 g/t Au over 10 metres.
  • VL-20-945 intersected 1.61 g/t Au over 26 metres.
  • VL-20-944 intersected 3.21 g/t Au over 10 metres, including 22.82 g/t Au over one metre and 2.71 g/t Au over six metres including 11.85 g/t over one metre.
  • VL-20-950 intersected 2.87 g/t Au over 12 metres, including 12.88 g/t Au over one metre.

All quoted intersections comprise uncut gold assays in core lengths. All significant assay intervals are reported in the associated table.

With these final 2020 results, a total of 42,000 metres of drilling in 212 holes are now available for use in the maiden mineral resource estimation for Berry. Consistent with previous practice, the Berry mineral resource estimate will be based on the results of metallic screening samples that have been submitted for all one m core intervals grading above the mineral resource cut-off of 0.3 g/t Au after fire assay. The Berry mineral resource estimate is expected to be completed prior to the end of the first quarter of this year.

In addition to today's drill results, Marathon reports that the company's board of directors has approved a 2021 exploration program comprising 52,000 metres of drilling at a budget of $10.5-million. These expenditures will be fully financed from existing cash resources. The 2021 exploration program will include:

  • Up to 30,000 metres at the Berry zone designed to increase drill density over the full 1.5 kilometres of mineralization delineated in 2020;
  • Up to 8,000 metres at both the Sprite and Victory deposits, with a view to potential resource expansion at each of these areas of historical exploration;
  • Up to 6,000 metres dedicated to grassroots projects focused on new discovery.

The 2021 exploration program will be managed and operated by Marathon's team of exploration staff and contractors, all of whom are resident within Newfoundland and Labrador.

Matt Manson, president and chief executive officer, commented: "Today's results represent the final batch of drill holes completed prior to our seasonal shutdown at the end of November. Our 2020 exploration program, including the Berry infill drill program added midyear, has been successful in delineating an important new area of gold mineralization at the Valentine gold project. The first mineral resource estimate for Berry based on this initial round of drilling is expected by the end of this quarter. Whereas our 2020 exploration work was discovery oriented, our 2021 exploration program is designed to add ounces, with up to 30,000 metres of additional infill drilling planned for the Berry zone over its full 1.5-kilometre length. We also plan to return to the Victory and Sprite deposits, with up to 8,000 metres of drilling in each area. Modest quantities of mineral resources have been previously estimated at each of Victory and Sprite based on limited drilling completed prior to 2015. The new drill program will be designed to test for the tightly concentrated Main zone-type mineralization located immediately proximal to the Valentine Lake shear zone in the style seen at the Leprechaun deposit, and now also at Berry, and which may have been missed by previous drilling patterns. Neither Victory nor Sprite are included in the current Valentine gold project mine planning. Finally, up to 6,000 metres of drilling will be reserved for greenfield initiatives within the 20 kilometres of shear zone geology contained within the Valentine Lake property. All of this exploration activity will proceed in parallel with our ongoing environmental assessment and engineering activities. Drilling with three rigs at site has already commenced."

Gold mineralization at the Valentine gold project is contained predominantly within shallowly southwest-dipping, en echelon stacked quartz-tourmaline-pyrite-gold (QTP-Au) veins. At the Leprechaun and Marathon deposits, as well as at the new Berry zone, these QTP-Au veins form densely stacked and northwest-plunging Main zone envelopes within intrusive host rocks on the hangingwall (northwest) side of the Valentine Lake shear zone. The extent of mineralization appears related to the size and frequency of sheared mafic dikes, which extend northeast-southwest within the hangingwall, parallel to the shear zone. Exploration drilling is generally undertaken in two orientations: down steeply toward the northwest at a high angle to the individual veins and down plunge of the Main zone stacking, or obliquely toward the southeast subparallel to the individual veins and across the strike of Main zone mineralization.

The results released today are derived from nine drill holes located within or adjacent to the Berry infill drilling area between sections 13540E and 13860E, and an additional six drill holes in the Frozen Ear Pond Road area between sections 14650E and 14800E.

Seven of the 15 holes were oriented steeply down to the northwest testing for Main zone-type stacked QTP-Au mineralization close to the Valentine Lake shear zone (VL-20-942, 945, 947, 948, 949, 950 and 951). Six holes were oriented steeply down to the northwest within hangingwall rocks but at a greater distance from the shear zone contact (VL-20-938, 939, 940, 944, 946 and 952). Two holes were oriented to the southeast from the hangingwall toward the footwall contact (VL-20-941 and 943).

Thirteen of the 15 drill holes returned significant drill intercepts of greater than 0.7 g/t Au, and each drill hole returned additional intercepts with gold grades above the 0.3 g/t Au cut-off used in the January, 2020, mineral resource estimate for the project.

            SIGNIFICANT ASSAY INTERVALS, BERRY ZONE, VALENTINE GOLD PROJECT

DDH             From         To      Core length    True thickness        Gold     Gold (cut)
                 (m)        (m)              (m)               (m)       (g/t)          (g/t)

VL-20-938         19         25                6              5.40        2.07
                  37         38                1              0.90        0.99
                  66         67                1              0.90        2.13
                  81         82                1              0.90        3.87
VL-20-939          9         11                2              1.80        2.05
                  19         20                1              0.90        1.19
                  26         28                2              1.80        0.77
                  42         43                1              0.90        2.84
                 138        139                1              0.90        1.10
VL-20-940         13         14                1              0.90        2.63
                  32         34                2              1.80        1.78
                  78         80                2              1.80        2.96
                  84         86                2              1.80        0.77
                  94         95                1              0.90        1.43
                 105        106                1              0.90        4.23
VL-20-942          7          9                2              1.80        2.43
                  26         46               20             18.00        2.56
including         26         27                1              0.90       17.54
                  75         76                1              0.90        0.79
                  87         89                2              1.80       20.00          16.86
                 130        132                2              1.80        2.44
                 140        146                6              5.40       19.85           6.25
including        142        143                1              0.90      111.62             30
                 179        180                1              0.90        0.89
VL-20-943          7         16                9               6.3        1.98
                  14         15                1               0.7       11.71
VL-20-944         15         16                1               0.9        2.70
                  26         32                6               5.4        2.71
including         29         30                1               0.9       11.85
                  46         47                1               0.9        0.91
                  60         61                1               0.9        2.70
                  68         78               10                 9        3.21
including         77         78                1               0.9       22.82
                 116        117                1               0.9        0.78
                 127        128                1               0.9        2.98
                 137        139                2               1.8        1.86
                 184        187                3               2.7        1.65
VL-20-945        6.8        333            26.17             23.55        1.61
                 102        103                1               0.9        4.07
                 114        120                6               5.4        2.51
                 129        130                1               0.9        7.23
                 135        136                1               0.9        1.98
VL-20-946        6.3        1 7             0.69             0.621        0.73
                   9         10                1               0.9        2.39
                  13         15                2               1.8        1.45
                  32         35                3               2.7        2.67
                  42         44                2               1.8       10.76
including         42         43                1               0.9       16.64
                  57         63                6               5.4        9.37           5.70
including         57         58                1               0.9       52.02             30
                  74         76                2               1.8        6.75
including         75         76                1               0.9       11.65
                 103        104                1               0.9        3.26
                 115        116                1               0.9        0.91
                 135        136                1               0.9        0.75
                 169        171                2               1.8        4.07
VL-20-947         45         48                3              2.85        1.26
                  79         97               18              17.1        1.47
                  88         89                1              0.95       11.20
                 108        109                1              0.95        1.48
                 112        113                1              0.95        0.83
                 120        129                9              8.55        1.06
                 175        185               10               9.5        0.74
                 188        190                2               1.9        0.77
                 192        195                3              2.85        0.84
                 198        201                3              2.85        0.82
                 210        211                1              0.95        2.57
                 215        237               22              20.9        0.88
                 247        248                1              0.95        1.06
                 261        262                1              0.95        0.89
                 274        275                1              0.95        0.95
                 298        299                1              0.95        1.45
                 315        316                1              0.95        0.83
VL-20-948        7.2          8              0.8              0.72        3.03
                  96        110               14              12.6        0.74
                 123        124                1               0.9        1.50
                 139        140                1               0.9        1.06
                 168        170                2               1.8        1.61
VL-20-949        110        111                1               0.9        0.83
                 131        133                2               1.8        1.35
                 151        158                7               6.3        2.40
                 166        167                1               0.9        3.57
                 174        179                5               4.5        0.83
VL-20-950         83         85                2               1.6        2.35
                  90         91                1               0.8        1.57
                  95         96                1               0.8        0.82
                 117        129               12               9.6        2.87
                 124        125                1               0.8       12.88
VL-20-952         36         40                4               3.6        0.11
                  56         61                5               4.5        0.08
                  64         65                1               0.9        1.13
                  76         77                1               0.9        3.04
                 100        101                1               0.9        0.09
                 108        110                2               1.8        0.19
                 119        120                1               0.9        5.00
                 142        162               20                18        0.80
                 239        240                1               0.9        0.09

Notes on the calculation of assay intervals:
(1) Significant assay intervals are defined as one m core length or more of 
mineralization with an average fire assay result of greater than 0.7 g/t Au, 
representing the bottom cut-off for high-grade mill feed in the Marathon 
April, 2020, prefeasibility study mine plan (see technical report dated April 
21, 2020). Assay intervals with an average fire assay result of between 0.3 
g/t Au and 0.7 g/t Au are above the cut-off used in the January, 2020, 
mineral resource estimate for the project but are not considered significant 
for the purposes of this news release.
(2) Cut gold grades are calculated at 30 g/t Au.
(3) No significant assays were returned in drill holes VL-20-941 and 951.

Qualified person

Disclosure of a scientific or technical nature in this news release was prepared under the supervision of Nicholas Capps, PGeo (Newfoundland), project manager for exploration at the Valentine gold project. Exploration data quality assurance and control for Marathon are under the supervision of Jessica Borysenko, PGeo (Newfoundland), GIS manager for Marathon Gold. Both Mr. Capps and Ms. Borysenko are qualified persons under National Instrument 43-101.

Quality assurance/quality control (QA/QC)

QA/QC protocols followed at the Valentine gold project include the insertion of blanks and standards at regular intervals in each sample batch. Drill core is cut in half with one-half retained at site, the other half tagged and sent to Eastern Analytical Ltd. in Springdale, Nfld. All reported core samples are analyzed for Au by fire assay (30 grams) with AA finish. All samples above 0.30 g/t Au in economically interesting intervals are further assayed using metallic screen to mitigate the presence of coarse gold. Significant mineralized intervals are reported in the attached table as core lengths and estimated true thickness (70 to 95 per cent of core length), and reported with and without a top-cut of 30 g/t Au applied.

Acknowledgments

Marathon acknowledges the financial support of the junior exploration assistance program, Department of Natural Resources, government of Newfoundland and Labrador.

About Marathon Gold Corp.

Marathon is a Toronto-based gold company advancing its 100-per-cent-owned Valentine gold project located in the central region of Newfoundland and Labrador, one of the top mining jurisdictions in the world. The project comprises a series of four mineralized deposits along a 20-kilometre system. An April, 2020, prefeasibility study outlined an open-pit mining and conventional milling operation over a 12-year mine life with a 36-per-cent after-tax rate of return. The project has estimated proven mineral reserves of 1.3 million ounces (26.3 million tonnes at 1.52 g/t) and probable mineral reserves of 600,000 oz (14.8 million t at 1.23 g/t). Total measured mineral resources (inclusive of the mineral reserves) comprise 1.9 million oz (31.7 million t at 1.86 g/t) with indicated mineral resources (inclusive of the mineral reserves) of 1.19 million oz (23.2 million t at 1.60 g/t). Additional inferred mineral resources are 960,000 oz (16.77 million t at 1.78 g/t Au). Please see the technical report dated April 21, 2020, for further details and assumptions relating to the Valentine gold project.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.