Mr. Scott Trebilcock reports
KORE MINING ANNOUNCES FILING OF THE POSITIVE LONG VALLEY PEA TECHNICAL REPORT WITH AFTER-TAX US$ 273M NPV5% AND 48% IRR AT US $1,600 GOLD
Kore Mining Ltd. has filed the National Instrument 43-101 technical report entitled "Preliminary Economic Assessment -- Technical Report for the Long Valley Gold Project, California, USA," for the previously announced positive preliminary economic assessment for the company's 100-per-cent-owned Long Valley gold deposit, located in California. The results of the PEA were reported in the company's press release dated
Sept. 15, 2020. In finalizing the report, minor revisions to several estimates increased the after-tax net present value 5 per cent by $10-million (U.S.) to $273-million (U.S.) from the results of the previous press release. The effective date of the PEA is Sept. 21, 2020, and the technical report was filed on Oct. 27, 2020.
Final Long Valley project PEA highlights:
-
$273-million (U.S.) NPV 5 per cent posttax with internal rate of return of 48 per cent at $1,600 (U.S.) per ounce gold;
- Significant leverage to gold: $395-million (U.S.) NPV 5 per cent at recent spot $1,900 (U.S.) per ounce gold;
- 102,000 ounces gold per year over seven years at all-in sustaining cost* of $773 (U.S.) per ounce;
- Technically simple: shallow open pit, heap leach with nearby infrastructure;
- Unmodelled silver potential from metallurgical test work;
- Shallow oxide and sulphide feeder exploration potential to further enhance project.
Opportunities:
The PEA outlined a number of initiatives that may enhance the project including:
- Assaying silver in all future drill programs to add silver into the resources;
- Conducting metallurgical tests to establish optimal crush size and cement addition;
- Performing test work on very low-grade samples to determine viability of run-of-mine leaching;
- Reviewing contract mining to reduce initial capital;
- Drilling for more oxide resources and deep sulphides to look for high-grade feeder zones.
Kore's chief executive officer, Scott Trebilcock, stated: "Kore has the unique advantage of having two simple, low-cost heap leach projects in one company. At $1,900 (U.S.) per ounce gold, the after-tax NPV 5 per cent for Long Valley and Imperial is $395-million (U.S.) and $660-million (U.S.), respectively, or, at current exchange rates, $530-million and $880-million Canadian dollars. That is a lot of potential value to deliver to Kore shareholders through development that we believe is to be unlocked as we continue to advance the exploration and development of these assets."
Mr. Trebilcock continued: "In addition to development, Kore has an array of exploration opportunities to grow ounces in the ground and make new discoveries. Kore is currently permitting drill programs at both Long Valley and Imperial while completing our recently extended drilling campaign at our FG gold project in British Columbia."
The Long Valley PEA demonstrates strong economic returns while being in full compliance with California's stringent operating and reclamation standards. Long Valley has clear upside potential from drill targets on strike and lateral to the current modelled oxide mineralization, and Kore intends to aggressively explore this untapped potential.
The full 43-101 PEA technical report is available on the company's website and has been filed on SEDAR under the company's issuer profile.
The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
PEA summary
The PEA was prepared in accordance with National Instrument 43-101 by Global Resource Engineering (Denver) (GRE) -- Terre Lane, RMSME MMSAQP, Todd Harvey, PhD, RMSME, in conjunction with a resource estimate prepared by Mine Development Associates (MDA) and written by Neil Prenn, PE, and recent site geological studies by Steven Weiss, PhD, CPD, also of MDA. The team was led by Marc Leduc, PEng, the chief operating officer of Kore Mining.
Unless otherwise stated, all dollar figures are in United States dollars and masses are in short tons.
Economics Pretax Posttax
Net present value (NPV5%) at 0.75C$/U.S.$ $ millions (Canadian) $463 $364
Net present value (NPV5%) $ millions $347 $273
Internal rate of return % 57% 48%
Payback (undiscounted) Years 1.6 1.8
LOM average annual cash flow after tax and capital $ millions $96 $83
LOM cumulative cash flow (undiscounted) $ millions $475 $385
Gold price assumption $ per ounce $1,600
Mine life Years 7
Average annual mining rate Million tons/year 18.5
Average annual gold production Thousand ounces/year 102
Total LOM recovered gold Thousand ounces 717
Initial capital costs $ millions $161
Life-of-mine calculation and mine life is defined as the duration of mining operations, seven years. There are additional years of site work for residual leaching, washing, back filling and reclamation modelled.
Several minor revisions to estimates from the original
Sept. 15, 2020,
news release were made including but not limited to recovery kinetics, operating costs, corporate taxes and property taxes. The net effect of the revisions was an increase of $10-million in after-tax NPV 5 per cent.
Gold price sensitivities
The gold prices table demonstrates the posttax sensitivities of NPV and IRR to gold price per ounce. The base case, highlighted in the table, assumes $1,600 per ounce of gold.
ECONOMIC SENSITIVITIES TO GOLD PRICES
(POSTTAX)
Per ounce of gold (NPV5%) millions IRR%
$1,200 $97 25%
$1,400 $187 38%
$1,600 $273 48%
$1,800 $352 58%
$1,900 $395 63%
$2,000 $438 67%
$2,200 $524 76%
Next steps
This PEA demonstrates the robust nature of the current Long Valley mineralization. However, there is a clear opportunity to grow shallow oxide mineralization as the mineralization remains open in all directions and on a separate parallel structure. Additional mineralization could extend mine life, reduce capital intensity and generate higher project economic returns.
Additionally, as a fully intact epithermal deposit with a large at surface footprint, Long Valley has the potential for high-grade sulphides in the underlying feeder structures. Discovering high-grade sulphides would open up additional development pathways for the project, such as underground mining and milling of mineralization.
Kore plans to drill test the highest-priority oxide and sulphide targets. Kore is currently permitting drill pads with its regulator, the U.S. Forest Service (USFS). Drilling is planned for H1 2021, subject to USFS permitting timelines. Details of the Long Valley exploration targets are in Kore news releases dated
Jan. 30, 2020,
and
March 24, 2020.
Final Long Valley
PEA details
GRE notes that the Long Valley project has an abundance of drill data as a result of the exploration completed in the 1980s and 1990s. The project also has metallurgical sampling and testing from previous owners, reviewed by GRE, to support the initial engineering design. These data will act as an important background and aid in the design of future work on the project.
Mining and processing
The PEA presents an open-pit, heap leach scenario where oxide, transition and sulphide ore is stacked on the leach pads by conveyors after two stages of crushing and agglomeration. The conveyor system is also used at the end of the mine life to backfill the final pits and reclaim the site to California's stringent standards. In the design process, the engineering team also looked at several other scenarios:
- Silver production: A Merrill-Crowe precious metal recovery circuit is included in the project design to recover both gold and silver. Silver is not quantified in the resource or PEA as it was not assayed regularly in historic drilling but was seen in all of the previous metallurgical test work.
- Smaller, oxide-only mine plan that had lower stripping ratio, lower capital and operating costs but yielded less ounces. Kore ultimately selected the mine plan with the most ounces recovered as those ounces would likely be mined at current metal prices.
MINING PLAN AND PROCESSING SUMMARY
Mine life years 7
Mining rate average tons per day 50,600
Strip ratio waste: mineralization 1.4
Total tonnage mined million tons 130.7
Total mineralized material mined million tons 54.2
Heap leach stacking rate average tons per day 21,100
Average LOM grade gram per metric tonne 0.671
Average LOM recovery % 68%
A detailed mine plan by year is included in the "Detailed Long Valley PEA
mine plan" table.
Operating costs
Mining costs for owner-operated mining, processing and other costs were developed from a mix of first-principle engineering and benchmarked to the many ROM heap leach operations in California and nearby Nevada. The Long Valley project is located near a large skilled labour pool and has local access to road and power infrastructure. The project has several options for water locally with potential surface and groundwater sources.
OPERATING COSTS (LOM AVERAGE) (1)
Mining costs (per ton mined) $/st mined $1.88
Mining costs $/st processed $4.54
Processing costs $/st processed $2.64
G&A costs $/st processed $0.89
Total site operating costs $/st processed $8.07
Cash costs*
Cash costs (LOM)* $/oz $646
(1) Not including postproduction reclamation and
backfilling. See LOM description.
The assumed truck diesel fuel price in the PEA is $2 per U.S. gallon. About 11 per cent of the mining cost is fuel so lower fuel prices would decrease mining costs moderately.
Initial preproduction and sustaining capital costs
Initial capital costs in the PEA are $161-million including a 25-per-cent contingency. Infrastructure costs are low due to the proximity of road, water and power infrastructure. Initial capital also assumes Kore is the owner-operator of all equipment. Further enhancements may be possible with contract mining. Sustaining capital is mainly for heap leach pad expansion and additional mining equipment.
PREPRODUCTION AND SUSTAINING CAPITAL
COSTS ($ MILLIONS)
Mining and mine infrastructure $40.6
Heap leach pads and plant $55.5
Infrastructure and G&A $18.5
Working capital $4.6
Contingency (25%) $27.9
Preproduction mining $13.9
Total preproduction cost $160.9
LOM sustaining capital $18.2
Closure including backfill (1) $72.4
(1) Closure cost includes final
backfilling of the open pit and site
reclamation to California's stringent
standards. The cost includes
$38.7-million in mining cost,
$14.5-million in site operating G&A
during backfilling of the final pit,
in addition to $19.1-million in other
site closure costs. Backfill will
return the site to plus 25 feet of
original topography while
re-establishing drainages. The balance
of the closure cost is for normal
non-backfill site closure costs to
remediate disturbances and remove
structures.
All-in sustaining cost*
AISC is competitive with peer projects and in the second quartile when compared with the World Gold Council AISC cost metric.
AISC* per ounce ($ millions)
Operating cost (1) $614
Royalties (2) $32
Sustaining capital $25
Closure $101
Total AISC* $773
(1) Operating costs include
$5 per ounce offsite refining.
(2) Royalties consist of:
(a) 1-per-cent NSR royalty to
Royal Gold;
(b) 1-per-cent NSR royalty to
Vista Gold.
Mineral resource estimate
The mineral resource estimate is unchanged from the
Sept. 15, 2020,
news release.
Qualified persons/quality assurance
The preliminary economic assessment was prepared by GRE with Terre Lane, PE, being the qualified person in charge of its preparation and who is independent of Kore. The mineral resource portion of the PEA was prepared by Neil Prenn, PE, of Mine Development Associates, and who is independent of Kore. With regard to technical matters in this press release Mr. Leduc, PEng, is the qualified person within the meaning of NI 43-101 and has reviewed and validated that the information in this press release is consistent with that provided by the qualified persons responsible for the PEA.
Further information about the PEA referenced in this news release, including information in respect of data verification, key assumptions, parameters, risks and other factors, can be found in the NI 43-101 technical report for the Long Valley gold deposit that the company has filed on SEDAR under Kore's profile and on the company's website.
About the Long Valley gold deposit
Long Valley is a 100-per-cent-owned epithermal gold project located in Mono county, California. The Long Valley deposit is an intact epithermal gold deposit with a large 2.5-by-two-kilometre oxide gold footprint.
The Long Valley deposit is an intact low sulphidation epithermal gold/silver deposit, hosted within a melange of fine to coarse volcanogenic sedimentary lithologies. Mineralization at Long Valley has developed due to a combination of deep-rooted fault structures and a resurgence of rhyolite within an active caldera. The Hilton Creek fault structure transects and served as a fluid conduit for interaction with the underlying hydrothermal system, while the rhyolite resurgence caused brittle fracturing of sediments and created voids or traps for mineralization and gold deposition. The combination of these factors yields strongly altered kaolin and quartz-hematite zones that are the primary host for gold mineralization.
The Hilton Creek fault remains underexplored on strike north and south and several parallel structures have been defined using geophysics, the eastern one hosting some of the current mineral resource and the western one being unexplored. Long Valley is therefore open to new oxide discoveries in all directions. More details on the deposit geology and exploration potential can be found in Kore's Jan. 30, 2020, and March 24, 2020, news releases.
About Kore Mining Ltd.
Kore is 100-per-cent owner of a portfolio of advanced gold exploration and development assets in California and British Columbia. Kore is supported by strategic investor Eric Sprott who recently invested $7.0-million, bringing his total ownership to 26 per cent. Kore management and board are aligned with shareholders, owning an additional 38 per cent of the basic shares outstanding. Kore is actively developing its Imperial gold project and is aggressively exploring across its portfolio of assets.
DETAILED LONG VALLEY PEA MINE PLAN
Years
LOM total -1 1 2 3 4 5 6 7
Ore (ton) 54,155,978 118,479 6,380,750 8,030,000 8,042,969 8,030,000 8,028,378 8,108,024 7,417,377
Waste tons (ton) 76,500,818 1,168,143 11,596,382 5,561,176 11,838,715 7,236,130 14,762,720 14,052,046 10,285,506
Stripping ratio 1.4 - 1.8 0.7 1.5 0.9 1.8 1.7 1.4
Mined ore grade (g/t) 0.671 0.60 0.66 0.67 0.67 0.66 0.71 0.81 0.50
Contained gold (troy oz) 1,059,850 2,070 122,226 156,679 157,822 154,993 167,045 191,328 107,688
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.