18:52:32 EDT Fri 09 Oct 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Pure Gold Mining Inc
Symbol PGM
Shares Issued 236,211,050
Close 2018-09-25 C$ 0.53
Market Cap C$ 125,191,857
Recent Sedar+ Documents

Pure Gold test mines average of 9.2 g/t Au at Madsen

2018-09-25 07:27 ET - News Release

Mr. Darin Labrenz reports

PURE GOLD TEST MINING DELIVERS AVERAGE GRADE OF 9.2 G/T GOLD OVER REALIZED MINING WIDTH OF 3.8 METRES

Pure Gold Mining Inc. is providing an update on continuing underground test mining, where results continue to exceed expectations with an average grade of 9.2 grams per tonne gold returned from 1,084 muck samples collected to date. The average grade of 9.2 g/t gold is a diluted mined grade, which comprises all muck samples from 46 rounds of freshly blasted rock, each of which averaged above a cut-off of 4.0 g/t gold.

The company has completed 100 metres of lateral development in the two stopes targeted for bulk sampling, representing approximately 3,100 tonnes of material above a 4.0 g/t gold cut-off. The average realized mining width of stope material has been 3.8 metres with excellent geotechnical rock conditions. Importantly, underground development continues to support Pure Gold's geologic model, match or exceed predicted grades and widths, and highlight the strong visual nature of mineralization.

As mining advances through each blasted round the drift walls are tested with a core drill, and this has been highly effective in identifying parallel gold structures that lie outside of the resource but in close proximity to new development. These parallel zones provide an exciting opportunity to mine additional gold-bearing rock at a lower cost in areas where predevelopment is substantially completed.

Underground drilling highlights include:

  • 31.3 g/t gold over 2.8 metres from drill hole PGB-001;
  • 57.4 g/t gold over 1.3 metres from drill hole PGB-007;
  • 11.9 g/t gold over 8.1 metres, including 67.7 g/t gold over 1.0 metre, from drill hole PGB-0062;
  • 101.6 g/t gold over 1.5 metres from drill hole PGB-0120;
  • 46.8 g/t gold over 2.0 metres, including 80.3 g/t gold over 1.0 metre, from drill hole PGB-0122.

Darin Labrenz, president and chief executive officer of Pure Gold, commented: "Over the last 18 months we have aggressively advanced Madsen along the development path. Concurrently, we have turned exploration success into an expanded mineral resource and demonstrated clear project growth and scalability through our new geologic framework for the Madsen mineral system. We have installed new services to the underground, deepened the Madsen ramp to provide access to early-stage stopes and are wrapping up a definitive feasibility study. Today we are mining high-grade gold mineralization as a bulk sample and drilling continues to identify new opportunities for growth. We look forward to the fourth quarter as we complete several important milestones with the goal of building a modern, scalable mining operation at Madsen."

Madsen bulk sample update

In late May, the company initiated a bulk sample program designed to partially test two proposed stopes from the McVeigh zone, with an estimated resource grade of 8.1 g/t gold. Initial ramp development was completed in June and the company has been mining high-grade gold over the past 12 weeks with approximately 100 metres of new mine development completed near the base of the two proposed stopes at a depth of approximately 160 metres below surface.

Importantly, mineralized zones are obvious, with the distinctive veining, intense alteration and visible gold characteristic of orebodies throughout the Red Lake district. Geotechnical conditions have been excellent and actual stope grades have reconciled positively with the resource model. Muck samples are collected in a regular pattern with five individual muck samples taken from every second scoop bucket, resulting in one muck sample for every three tonnes of mining. Each blast typically has an average of about 25 muck samples collected, and all the samples from each round are averaged to determine if a particular round exceeds the 4.0 g/t gold cut-off. The average mining width over these 46 mining faces is 3.8 metres and, locally, the mineralized structure exceeds 12 metres in true width.

As part of an extensive sampling program to characterize the mineralization during test mining and in addition to the muck samples, chip samples are collected across two sampling lines from each mining face, and test sludge holes are drilled into the walls approximately one metre back from the face. In addition, the company is testing the walls on a minimum of three-metre spacing with a core drill to identify potential for additional mineralization. The core drill holes are being drilled with a Bazooka air drill with horizontal holes typically 10 to 20 metres in length, which return EW size (25.4 millimetres or one inch) core samples which are logged and photographed prior to whole core sampling. Thus far, the underground drill program has been highly successful, identifying additional mineralized structures outside of, but in close proximity to, new mine development. Several of these structures demonstrate continuity of higher-grade mineralization and have been incorporated into the test mining plan. A summary of drill results, outlined in the table, demonstrates the high-grade nature of these parallel gold structures.

The company anticipates completing its bulk sample and test mining by early November.

Underground drill results summary

New assay results from select drill holes are outlined in the table.

Hole ID          From (m)         To (m)     Length (m)     Gold (g/t)

PGB-0001             2.5            5.3            2.8           31.3
PGB-0006             4.8           10.0            5.2            4.8
Incl.                4.8            5.9            1.1           13.9
Incl.                5.3            5.9            0.6           24.0
PGB-0007             0.8            2.0            1.3           57.4
PGB-0009             2.5            3.6            1.1           18.0
Incl.                3.0            3.6            0.6           31.7
PGB-0010             2.0            6.1            4.1            7.1
Incl.                2.0            4.0            2.0           11.2
PGB-0013             0.6            3.1            2.6            7.3
Incl.                2.7            3.1            0.5           27.1
PGB-0017             8.7            9.8            1.2            8.0
PGB-0019            10.1           18.1            8.0            7.0
Incl.               13.2           15.2            2.0           24.8
PGB-0036             0.0            0.8            0.8           10.7
                     6.3            8.3            2.0           13.3
PGB-0039            24.2           26.2            2.0           14.4
PGB-0058             3.0            9.0            6.0            4.8
Incl.                5.2            7.3            2.1            9.9
PGB-0060             5.0            7.0            2.0            8.3
PGB-0062             1.0            9.1            8.1           11.9
Incl.                3.8            9.1            5.3           17.6
Incl.                8.1            9.1            1.0           67.7
PGB-0063             5.0           10.1            5.1            7.4
Incl.                7.7            9.3            1.6           18.9
PGB-0064             3.3            9.3            6.0            9.4
Incl.                6.0            9.3            3.3           16.1
Incl.                7.0            9.3            2.3           21.2
PGB-0066             2.4            8.8            6.4           17.8
Incl.                5.8            8.8            3.0           31.4
PGB-0068             5.9            7.9            2.0            9.7
PGB-0077             0.0            1.0            1.0            9.3
PGB-0092             5.3            8.5            3.2            7.2
PGB-0095             2.0            3.0            1.0           10.1
PGB-0109             0.0            7.5            7.5            8.0
Incl.                4.5            6.5            2.0           23.6
PGB-0116             6.0            8.5            2.5           17.9
Incl.                6.0            8.0            2.0           21.8
PGB-0118             4.7            8.0            3.3            8.7
Incl.                6.0            8.0            2.0           13.4
PGB-0119             2.0            4.0            2.0            7.2
PGB-0120            14.3           15.8            1.5          101.6
PGB-0121             3.6            4.2            0.6           37.5
PGB-0122             0.0            2.0            2.0           46.8
Incl.                0.0            1.0            1.0           80.3
PGB-0124             8.0           10.0            2.0           10.1
PGB-0129             6.0            8.0            2.0           17.1

* Assay composites were calculated using uncut assays and true widths 
are interpreted to vary from 90 to 100 per cent (95 per cent, on 
average) of reported core lengths above.

In addition to continuing drilling underground, the company continues to drill from surface, with approximately 10,000 metres of drilling planned for the balance of the calendar year using two drill rigs. Results from this drilling will be reported as available. Additionally, results from all drilling in 2018 completed prior to Sept. 1 from Wedge, Russet South, Fork and Madsen will be incorporated into an updated resource estimate, on track for Q4 2018. Preliminary engineering studies are also in progress to evaluate the Russet South, Fork, Wedge satellite deposits and their ability to influence scalability of the Madsen operation.

About Madsen

The Madsen gold project has historic production of 2.5 million ounces of gold and a current indicated resource of 1,744,000 ounces gold at 8.7 g/t gold (in 6.2 million tonnes) and an inferred resource of 296,000 ounces gold at 7.9 g/t gold (in 1.2 million tonnes), the project benefits from existing infrastructure including a mill and tailings facility, paved highway access, and access to power, water and experienced labour. A feasibility study is under way with results expected in the fourth quarter of 2018 and the Madsen gold project is firmly on the path to becoming Ontario's next gold mine.

See the National Instrument 43-101 technical report entitled "Technical Report for the Madsen Gold Project - Restated Preliminary Economic Assessment and Initial Satellite Deposit Mineral Resource Estimates" with an effective date of Dec. 14, 2017, for complete details, available on the company's website or SEDAR.

Quality assurance/quality control and core sampling protocols

All underground samples and drill core samples are bagged and sealed and submitted to SGS in Red Lake, Ont., for sample preparation by crushing to 75 per cent less than two millimetres, a riffle split of one kilogram and pulverization of the split to better than 85 per cent passing 75 microns. Gold analysis is completed in the SGS Red Lake lab with a 30 g fire assay and AAS finish (code GO-FAA303). Samples returning greater than 100 g/t Au are reassayed with a gravimetric finish (code GO-FAG303). Control samples (accredited standards, duplicates and non-accredited blanks) were inserted on a regular basis. Results are assessed for accuracy, precision and contamination on a continuing basis.

Qualified persons and National Instrument 43-101 disclosure

Phil Smerchanski, PGeo, vice-president, exploration, for the company, is the designated qualified person for this news release within the meaning of National Instrument 43-101 and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.