19:12:06 EST Mon 23 Nov 2026
Enter Symbol
or Name
USA
CA



Tsodilo Resources Ltd
Symbol TSD
Shares Issued 66,678,963
Close 2026-11-23 C$ 0.08
Market Cap C$ 5,334,317
Recent Sedar+ Documents

Tsodilo Resources renews Gcwihaba prospecting licences

2026-11-23 18:36 ET - News Release

Mr. James Bruchs reports

TSODILO RESOURCES LTD GCWIHABA PROSPECTING LICENSES UPDATE

The Ministry of Minerals and Energy of Botswana has renewed all five of Tsodilo Resources Ltd.'s Gcwihaba prospecting licences (PL020/2018 to PL024/2018) for a further two-year term (second renewal), effective Jan. 1, 2027.

The renewal secures tenure over the C26/C27 polymetallic rare earth skarn discovery, which contains all 15 rare earth elements on the U.S. Geological Survey's 2025 list of critical minerals, together with copper, cobalt, nickel, vanadium and silver, and over the Xaudum iron formation (XIF), which hosts a 441-million-tonne inferred mineral resource in block 1.

Rare earth elements

About the skarn rare earth project:

  • The rare earth elements are an abundant group of seventeen elements composed of scandium, yttrium and the lanthanides. The elements range in crustal abundance from cerium, the 25th most abundant element of the 78 common elements in the earth's crust at 60 parts per million, to thulium and lutetium, the least abundant rare-earth elements at about 0.5 part per million. The elemental forms of rare earth are iron gray to silvery lustrous metals that are typically soft, malleable, and ductile and usually reactive, especially at elevated temperatures or when finely divided.
  • The rare earth elements unique properties are used in a wide variety of applications. (source: USGS National Minerals Information Center). NdFeB magnets are the most widely used, driving demand for four key REEs (rare earth elements): neodymium and praseodymium as core inputs, and dysprosium and terbium as essential additives for thermal stability (source: African Development Bank, Critical Mineral Insights 9 -- Rare Earth Elements, Nov. 24, 2025). In 2024, the United States imported 80 per cent of the rare earth elements it used. (source: USGS news release, Interior Department releases final 2025 List of Critical Minerals, Nov. 14, 2025).
  • The C26 and C27 targets were initially identified as geophysical anomalies through ground magnetic and gravity surveys. Diamond core drilling of these anomalies confirmed skarn-hosted REE mineralization 20 to 50 metres below surface. The skarns and other project area proximate targets contain a polymetallic assemblage including all 15 rare earth elements on the USGS 2025 list of critical minerals, together with the critical minerals copper, cobalt, nickel, vanadium and silver (see the news release dated Jan. 13, 2026, on the company's website).
  • Assays from completed drilling to date show neodymium and praseodymium oxides (NdPr) making up approximately 15 per cent of total rare earth oxides (TREO) at C26 and C27. That proportion is similar to the 15.7 per cent reported for MP Materials' Mountain Pass deposit. NdPr is essential for high performance permanent magnet applications in electric vehicles, wind turbines and defence systems.
  • A 15,000-metre (m) drill program will commence in Q2 (second quarter) 2027 with the objective of supporting a maiden National Instrument 43-101 mineral resource estimate.
  • Additional information on the rare earth project can be found on the company's website.

Xaudum iron formation (XIF)

About the XIF project:

  • The project is located in the northwest district of Botswana and extends for a known length of approximately 40 kilometres.
  • The XIF is proximate to the Namibian border and lies 22 miles from the town of Divundu in Namibia. The Walvis Bay-Ndola-Lubumbashi development corridor (previously known as the Trans-Caprivi) line linking Zambia and Namibia is planned to pass through Divundu, providing access to Walvis Bay, Namibia's deepsea port. The project is also located within 43 miles of the proposed Mucusso line to Angola's Namibe port.
  • Preliminary work on the XIF project has defined a CIM-compliant inferred mineral resource estimate of 441 million tonnes (t) with an average grade of 29.4 per cent iron (Fe), 41.0 per cent SiO2 (silicon dioxide), 6.1 per cent Al2O3 (aluminum oxide) and 0.3 per cent phosphorous (P) for the block 1 magnetite XIF.
  • Block 1 is a fraction of the potential XIF magnetite resource. An extrapolated exploration target has defined the XIF to be in the order of five billion to seven billion tonnes at 15 to 40 per cent Fe. This exploration target was generated by inversion modelling of ground magnetic geophysical data, which were compared and moderated to volumes from drilling data within block 1, and its potential quantity and grade are conceptual in nature. To date, there has been insufficient exploration to define a mineral resource other than in block 1 and it is uncertain if further exploration will result in the target being delineated as a mineral resource. See the news release dated June 2, 2014, on the company's website for further details.
  • Metallurgical magnetic separation results (Davis Tube Recovery) show that an average concentrate of 67.2 per cent Fe, 4.2 per cent SiO2, 0.5 per cent Al2O3 and 0.07 per cent P is obtained at P80 grind size of 80 microns, although higher grades are possible at finer P80s. See the news release dated Dec. 17, 2013, on the company's website.
  • Further exploration will focus on block 2a, where the company expects an increase in the resource.
  • Additional informational of the project can be found on the company's website and further technical information can be found in a report prepared by SRK Consulting (U.K.) Ltd. for Gcwihaba Resources Pty. Ltd., titled "Mineral Resource Estimate for the Xaudum Iron Project (Block 1), Republic of Botswana," with an effective date of Aug. 29, 2014, and filed on SEDAR+ under the company's profile.
  • Environment and green steel: Tsodilo adopted the International Finance Corp.'s (IFC) environmental, health and safety guidelines for mining when IFC became a shareholder more than a decade ago and the company has worked diligently to advance the XIF project within those guidelines. Further to this, Tsodilo became a member of the ResponsibleSteel organization, as building a sustainable steel industry requires co-operation and mutual commitment from companies at all levels of the steel supply chain, representatives of civil society, and other stakeholders and ResponsibleSteel provides the forum for this multistakeholder approach. Members include some of the leading players in the industry working together to minimize the impact of steel manufacturing on people and the planet. Working closely with government ministries and ResponsibleSteel furthers Tsodilo's goal of becoming the supplier of an ultrahigh-grade plus-67 per cent Fe product to the industry and doing what the company can to reduce greenhouse gas emissions (GHG) by becoming part of the green steel movement.

About Tsodilo Resources Ltd.

Tsodilo Resources is an international mineral resource exploration company engaged in the search for economic metal deposits at its Gcwihaba projects in Botswana. The company has a 100-per-cent stake in its Gcwihaba project area consisting of five metal (base and precious, platinum group, and rare earth) prospecting licences, all located in the northwest district of Botswana.

QP (qualified person) disclosure

Overall supervision of the company's exploration program is the responsibility of Asele Maboshe, PrSciNat, qualified person, as such term is defined in National Instrument 43-101, who has reviewed and approved the technical information in this news release, and is not independent of the company.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.