ORIGINAL: Rizal's T'boli plant produces 18 oz Au by end of Q1

2017-05-30 13:17 ET - News Release

Received by email:

File: 2012-05-30-RZL-NR-Q1.pdf

NEWS RELEASE                                                                   Symbol: RZL-TSX.V

                              Quarterly Activities Report to 31st March 2017

May 30, 2017 - Vancouver, British Columbia: Rizal Resources Corporation (TSXV: RZL) ("Rizal" or the
"Company") issues the following release to update shareholders on its March Quarter 2017 results.

During the first 3 months of 2017 the team has been pushing hard to realise the projects production
plan, whilst continuing efforts to raise the remaining capital needed to fund the project through its
commissioning and ramp-up phase.
Since the beginning of 2017, Rizal has managed with a lower cashflow position than budgeted which
consequentially slowed the advance of the project. Despite this, Rizal has managed to advance the
project towards production. Some key events and achievements are;

         On May 9, 2017, President Rodrigo Duterte appointed Mr Roy A. Cimatu to replace Ms Gina
         Lopez as the Secretary of the DENR. This action followed Ms Lopez's appointment being
         rejected by the Congressional Commission of Appointments on May 4, 2017.
         During January 2017, the company engaged Australian mining consultant Premium Mining
         Personnel (PMP) to provide advice and training to the local contractors on mine development
         and production. The main objective for hiring PMP was to lift the production rates and improve
         the safety and operating standards in the mine.
         At the end of the March quarter 2017, development of the new "Minion" decline has achieved
         a total driven distance of 1,045 metres. This includes total decline, cross cuts and drive
         development of 437 metres, 180 metres and 250 metres, respectively. Total decline depth to
         date is 50 metres below the access portal entrance.
         In the process of development to date in FY2017, a total of 6,367 tonnes of mineralized
         material from drive development and stoping has been brought to surface and delivered to the
         mill. This is the primary source material being treated during the mill commissioning phase.
         The T'boli plant was recommissioned in February 2017 and a total of 3,587 tonnes of
         mineralized material was treated during the March quarter. The rate of commissioning was
         slowed due to some mechanical issues in the crushing and grinding circuit. By the end of the
         March quarter, most of those issues had been resolved. As of the end of March 2017 quarter
         gold produced was 18.16 oz, by the end of April the plant had produced a total of 182 ozs.
         Plant maintenance was planned for May to replace ball mill liners and the install a new primary
         crusher. The planned maintenance was completed successfully and production re-started on
         21st May.
         Ongoing slow rates of advance from contractors continues to be an issue, however, there has
         been some improvement since appointment of PMP mining consultants.
         The key focus in the short term is to access remnant material in the upper level of the mine had
         left behind by previous small-scale miners, with the objective of increasing gold production.




4337111.tdr186
          The plan for the remainder of May and the month of June, is to operate the plant at its design
         rate of 200 tpd (70,000 tpa). However, grade estimation is difficult at this stage du to unknown
         quantity of higher grade material that may have been previously mined.
          Rizal is currently preparing a Preliminary Economic Assessment (PEA) for the T'Boli mine.
         A detailed budget and schedule is being prepared for the PEA and we will announce the study
         program and timing as soon as possible.
         The Company also announces that pursuant to the its Stock Option Plan it has granted
         5,750,000 stock options at a price of $0.05 per common share to directors and officers of the
         Company. The option grants will vest immediately and per the Company's Stock Option Plan,
         the options granted are exercisable until May 25, 2022. Grant of the options is subject to the
         approval of the TSX Venture Exchange.


On Behalf of the Board,

Peter Main
President and CEO
pmain@rizalresources.com

For further information please visit                     our    website      at    www.rizalresources.com,           e
--->mail     us    at
info@rizalresources.com
Phone: 778-370-1372 Fax: 604-608-5442


   Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the T
--->SX
                 Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward Looking Statements

This news release contains certain "forward-looking statements". All statements, other than statements of historical f
--->act that address
activities, events or developments that the Corporation believes, expects or anticipates will or may occur in the futu
--->re are forward
looking statements. These forward-looking statements reflect the current expectations or beliefs of the Corporation ba
--->sed on information
currently available to the Corporation.

Forward looking statements are subject to significant risks and uncertainties and other factors that could cause the a
--->ctual results to
differ materially from those discussed in the forward-looking statements, and even if such actual results are realized
---> or substantially
realized, there can be no assurance that they will have the expected consequences to, or effects on the Corporation. A
--->ny forward-looking
statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws,
---> the Corporation
disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, fu
--->ture events or
results or otherwise. Although the Corporation believes that the assumptions inherent in the forward-looking statement
--->s are reasonable,
forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put o
--->n such
statements due to the inherent uncertainty therein. The reader is referred to the Company's most recent annual and int
--->erim
Management's Discussion and Analysis for a more complete discussion of such risk factors and their potential effects, 
--->copies of which
may be accessed SEDAR at http://www.sedar.com.




4337111.tdr186
 


© 2024 Canjex Publishing Ltd. All rights reserved.