06:44:35 EDT Sun 19 May 2024
Enter Symbol
or Name
USA
CA



P2 Gold Inc
Symbol PGLD
Shares Issued 118,353,782
Close 2024-04-26 C$ 0.125
Market Cap C$ 14,794,223
Recent Sedar Documents

P2 Gold's Gabbs at 49.8 Mt of 0.45 g/t Au indicated

2024-04-29 11:31 ET - News Release

Mr. Joseph Ovsenek reports

P2 GOLD INCREASES INFERRED RESOURCES AT GABBS BY 69%

P2 Gold Inc. has completed the April, 2024, updated mineral resource estimate for its wholly owned Gabbs project located on the Walker Lane trend in Nevada. The 2024 MRE was prepared by P&E Mining Consultants Inc. ("P&E") in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101").

"As part of the 2024 Preliminary Economic Assessment underway for the Gabbs Project, we have updated the operating costs for both heap leach and mill processing," commented Joe Ovsenek, President and CEO of P2. "These operating costs have been used to update the pit-constrained Mineral Resource for the Gabbs Project. We now have substantially more mineralized material above the cut-off grades for the heap leach and mill. The known zones of mineralization at Gabbs all outcrop and remain open along strike and at depth, with excellent potential for non-outcropping zones of mineralization."

Gabbs Project 2024 Mineral Resource Estimate

The 2024 MRE was prepared by P&E based on four diamond drill holes and 27 reverse circulation drill holes completed by the Company in 2021 and 2022 and 494 drill holes completed by prior Gabbs Project operators between 1970 and 2011.

The main difference between the 2024 MRE and the June 2023 Mineral Resource Estimate (see news release dated September 11, 2023) is the decrease in the oxide cut-off grade to 0.27 g/t gold equivalent from 0.28 g/t gold equivalent and a decrease in the sulphide cut-off grade to 0.36 g/t gold equivalent from 0.44 g/t gold equivalent. As a result, both oxide and sulphide Mineral Resources have increased.

Oxide Mineral Resources at Gabbs consist of Indicated Mineral Resources of 760,000 ounces of gold equivalent (33.7 million tonnes grading 0.46 g/t gold, 1.43 g/t silver and 0.26% copper) and Inferred Mineral Resources of 1,040,000 ounces of gold equivalent (52.0 million tonnes grading 0.39 g/t gold, 0.81 g/t silver and 0.21% copper). See Table 2 below for a breakdown of the oxide and sulphide Mineral Resources.

Qualified persons

The 2024 MRE was prepared under the supervision of Eugene Puritch, P.Eng., FEC, CET of P&E Mining Consultants Inc., who is an Independent Qualified Person, as defined by NI 43-101. Mr. Puritch has reviewed and approved the technical contents of this news release relating to the 2024 MRE.

Ken McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, P2 Gold, is the Qualified Person, as defined by NI 43-101, responsible for the Gabbs Project. Mr. McNaughton has reviewed, verified, and approved the scientific and technical information in this news release.

About P2 Gold Inc.

P2 Gold is a mineral exploration and development company focused on advancing precious metals and copper discoveries and acquisitions in the western United States and British Columbia.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.