Orezone produces 35,482 oz Au at Bombore in Q2 2023

2023-07-12 09:36 ET - News Release

Mr. Patrick Downey reports

OREZONE REPORTS Q2-2023 GOLD PRODUCTION

Orezone Gold Corp. has provided Q2 2023 production results from its Bombore gold mine.

Q2 2023 highlights:

  • Gold production of 35,482 ounces, totalling 76,783 oz for H1 2023;
  • Gold sales of 33,608 oz at an average realized price of $1,970 (U.S.)/oz resulting in sales of $66.2-million (U.S.);
  • Senior loan principal repayments of $19.1-million (U.S.) and $28.8-million (U.S.) for Q2 2023 and H1 2023, respectively. Senior loan of $66.4-million (U.S.) remains outstanding;
  • Cash position of $32.3-million (U.S.) as at June 30, 2023.

Patrick Downey, president and chief executive officer, stated: "Q2 marked another solid quarter at Bombore, with ore processed continuing to achieve rates beyond nameplate design. Overall mill throughput for the quarter was slightly below that of Q1 due to lower-than-planned plant availability from routine maintenance for the installation of newly designed mill liners and the replacement of worn shafts in the front-end mineral sizer. All major planned maintenance for the year is now complete and the company expects quarterly throughput in the second half of 2023 to reach record levels.

"Gold production benefited from the reclaim of higher-grade stockpiles in the first half of the year with head grades expected to continue to moderate in the second half. The company reaffirms its 2023 annual production guidance of 140,000 to 155,000 ounces.

"Work on the phase II hard-rock expansion feasibility study continued during Q2, with mine design and scheduling now under way. Project costing is well advanced with initial reviews of detailed quotes for long-lead items ongoing. The expansion study remains on track for completion at the end of Q3 2023.

"Significant progress was also made on the Bombore grid power connection, with right-of-way clearing complete and tower installations commencing. Energization of the grid connection is slated for late 2023 which will see current power costs dramatically reduced."

About Orezone Gold Corp.

Orezone Gold is a Canadian mining company operating the open-pit Bombore gold mine in Burkina Faso.

Orezone is focusing on mining and processing the phase I near-surface free-dig oxides at a planned annual throughput of 5.7 million tonnes. The company believes that Bombore has a significant underlying hard-rock resource to support a substantially larger phase II expansion. The company has recently completed a resource definition drill program, and plans to issue an updated mineral resource, reserve and life-of-mine plan, as part of this phase II expansion. It is expected that the pending study will be completed in Q3 2023 to be followed by a production decision.

Orezone is led by an experienced team focused on social responsibility and sustainability with a proven record in project construction and operations, financings, capital markets, and mergers and acquisitions.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.