11:56:34 EDT Tue 02 Jun 2026
Enter Symbol
or Name
USA
CA



Nuvau Minerals Inc.
Symbol NMC
Shares Issued 87,343,174
Close 2026-06-01 C$ 0.81
Market Cap C$ 70,747,971
Recent Sedar+ Documents

ORIGINAL: Nuvau Minerals commences PEA study to advance Matagami restart strategy, which includes a fully permitted critical metals mine

Study to outline the restart pathway for a historic mining camp by integrating updated mineral resource estimates, mine design, and infrastructure development roadmap

2026-06-02 07:01 ET - News Release

Toronto, Ontario--(Newsfile Corp. - June 2, 2026) - Nuvau Minerals Inc. (TSXV: NMC) ("Nuvau") has taken another major step toward re-establishing its flagship Matagami Mining Camp as a renewed critical minerals company. Nuvau has commenced a new Preliminary Economic Assessment (PEA) study, which will consider the potential integration of the fully permitted1 Bracemac-McLeod Mine, for its 100% owned Matagami property in Northern Québec. This marks an important milestone in Nuvau's vision to progressively unlock the value of the historic district through a phased redevelopment strategy that leverages existing infrastructure, updated engineering methodologies, and district-scale exploration potential.

HIGHLIGHTS AND TARGETS FOR UPCOMING PEA

The new PEA study is expected to include:

  • Updates to the Mineral Resources to extend beyond the current 10-year equivalent of production already included in the July 2023 PEA. This will include the addition of the McLeod Deep extension discovered by Nuvau.
  • Revision to the mine plan to include the restart of the Bracemac-McLeod Mine, a fully permitted mine with key infrastructure in place.
  • Increased overall Life of Mine operations with the inclusion of additional resources.
  • Improved economics due to adjustments reflecting current consensus metal prices-the July 2023 PEA used lower metal prices of $3.74/lbs copper and $1.30/lbs zinc.

"We believe production at Matagami did not end because the district ran out of mineralization and there remains significant mineralization at the Matagami mining camp," commented Christina McCarthy, CEO of Nuvau. "Now that Nuvau has 100% ownership of the camp, we have the opportunity to re-evaluate the district-scale opportunity that Matagami presents. Our upcoming PEA will include the Caber Complex and the McLeod Deep extension, incorporating both assets into a future mine plan. Since acquiring the project, Nuvau's drilling identified additional mineralization beneath the historic mine workings at Bracemac-McLeod, further unlocking potential value that was never captured in previous plans."

"We believe Matagami represents a rare, low-capital opportunity to restart a past-producing camp with existing infrastructure, meaningful resource growth potential, and a clear pathway toward becoming a long-life critical metals producer once again," Ms. McCarthy continued.

About the Bracemac-McLeod Mine

  • Fully permitted mine with past production
    • Developed mine infrastructure to a depth of 1,400m
    • Surface infrastructure remains in place, which is expected to reduce the timeline to a production decision and capital expenditure
  • The mine was in operation until Glencore ceased operations in June 2022. Current metal prices have resulted in the re-evaluation of mineralization near existing operations and mineral resources
  • McLeod Deep resource remains open at depth in multiple directions
  • Past production of 8.1 Mt at 6.1% Zn, 0.9% Cu, 24 g/t Ag, and 0.5 g/t Au2

"This PEA is focused on identifying the most efficient path to restarting Matagami by leveraging existing infrastructure, integrating potential additional mineral resources, and optimizing the development sequence of the district's deposits," said Bastien Fresia, Director of Technical Services at Nuvau. "Our objective is to improve upon the foundation established in the 2023 study by incorporating Bracemac-McLeod, extending overall mine life, and reducing initial capital requirements where possible. We believe these factors have the potential to enhance project economics while establishing a scalable platform for future growth across the district."

The study will evaluate a potential restart scenario centred around the Matagami Lake processing infrastructure and supported by the Bracemac-McLeod Mine and the Caber Complex zinc-copper deposits. It will integrate updated mining, metallurgical, infrastructure, environmental, closure, and economic parameters through a collaborative effort between Nuvau and a group of industry-respected technical partners, including BBA Consultants, Base Metallurgical Laboratories Ltd., and Stantec Inc. It is expected to support a phased development approach aligned with current technical and environmental standards and is targeted for completion in Q4 2026.

In parallel, as part of its district-scale development strategy, Nuvau continues to evaluate several opportunities to support future Mineral Resource growth beyond the deposits expected to be included in the PEA mine plan. These include the deposit and surrounding area of Daniel-25 zinc-copper VMS and the Perseverance historic mine mineralization extension, both of which represent logical targets for the next stage of resource definition and development studies. Ongoing exploration activities across the Matagami District are intended to further assess these opportunities and other priority targets, to support future Mineral Resource Estimate updates and support the long-term development potential of the district.

Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by Bastien Fresia, P. Geo. (Qc), Director of Technical Services and a "qualified person" for the purposes National Instrument 43-101.

For further information, please contact:
Christina McCarthy
Chief Executive Officer, Nuvau Minerals Inc.
Telephone: 416-712-6151
Email: cmccarthy@nuvauminerals.com

Cautionary Statements
This news release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable securities laws. Any statements that are contained in this news release that are not statements of historical fact may be deemed to be forward-looking statements. Forward-looking statements are often identified by terms such as "may", "should", "anticipate", "will", "estimates", "believes", "intends", "expects" and similar expressions which are intended to identify forward-looking statements. More particularly and without limitation, this news release contains forward-looking statements concerning: the timing and ability of the Company to advance the Matagami Property to a production decision; the results of and the timing for completion of the new PEA; the expected highlights and targets for the new PEA including updating the Mineral Resources to extend beyond the current 10-year equivalent of production, the restart of the Bracemac-McLeod Mine, the increased overall Life of Mine operations and improved economics due to adjustments reflecting current consensus metal prices; and the likelihood of future opportunities and ability to realize on such opportunities to support Mineral Resource growth beyond the deposits expected to be currently included in the PEA mine plan. Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management, in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances. Readers are cautioned that assumptions used in the preparation of any forward-looking statements may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted as a result of numerous known and unknown risks, uncertainties and other factors, many of which are beyond the control of the Company. Factors that could cause actual results to differ materially from such forward-looking statements are set out in the Company's public disclosure record available on SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. Readers are further cautioned not to place undue reliance on any forward-looking statements, as such information, although considered reasonable by the management of the Company at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated.

The forward-looking statements contained in this news release are made as of the date of this news release, and are expressly qualified by the foregoing cautionary statement. Except as expressly required by securities law, the Company does not undertake any obligation to update publicly or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.


1 Historic mining rights are still granted under BM 1023 and 1024, valid until April 18th, 2033 (SIGEOM). The closure plan was approved in 2022 and granted to Glencore. It is currently being updated for transfer under Nuvau management.

2 Glencore internal sources. Reported in Nuvau "NI 43-101 Technical Report Matagami Mining Camp, Québec, Canada", November 2024

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/299724

© 2026 Canjex Publishing Ltd. All rights reserved.