06:16:22 EDT Sun 05 May 2024
Enter Symbol
or Name
USA
CA



Metanor Resources Inc (2)
Symbol MTO
Shares Issued 84,977,654
Close 2018-02-26 C$ 0.63
Market Cap C$ 53,535,922
Recent Sedar Documents

ORIGINAL: Step Out Drilling Extends Main Zone at Depth and Intercepts 21.2 g/t Au over 1.7 metres at Barry Project

2018-02-27 08:37 ET - News Release

Step Out Drilling Extends Main Zone at Depth and Intercepts 21.2 g/t Au over 1.7 metres at Barry Project

VAL-D'OR, QUEBEC--(Marketwired - Feb. 27, 2018) - Metanor Resources Inc. ("Metanor") (TSX VENTURE:MTO) is pleased to announce new high-grade results of 21.2 g/t Au over 1.7 metres, 31.5 g/t Au over 1.1 meters and 24.7 g/t Au over 1.5 metres at the Barry project. Metanor has also extended the main shear zone at depth with grades of 6.4 g/t Au over 5.1 metres and 3.9 g/t Au over 12.0 metres.

Metanor continues to advance the exploration of the Barry project by expanding known shear zones at depth and along strike through its surface drilling campaign. The program has a total of 3 diamond drill rigs, 2 drilling on the Barry project and 1 drill rig exploring other targets in the camp. 

The gold mineralization at the Barry project is structurally controlled and is hosted in a sheared basalt containing quartz-carbonate-albite veins with pyrite. Metanor has identified three main sub-vertical shear zones and approximately ten secondary lower dipping shear zones. These structures are open in all directions.

Highlights of drill intercepts in high-grade shear zones include:

• MB-17-142 from 184.9 m. to 186.6 m.21.2 g/t Au over 1.7 m.
 Strong shear zone in altered basalt along felsic intrusive contact. Numerous quartz veinlets with ~10% pyrite.
• MB-17-143from 180.1 m. to 181.6 m.24.7 g/t Au over 1.5 m.
 Sheared and altered basalt with ~15% pyrite, pyrrhotite and folded quartz veining with VG.
• MB-17-52 extfrom 163.0 m. to 164.1 m.31.5 g/t Au over 1.1 m.
 Altered and sheared basalt containing numerous quartz veinlets and ~5% fine pyrite.
• MB-18-152from 257.0 m. to 262.1 m.6.4 g/t Au over 5.1 m.
 Silicified sheared basalt with VG and ~6% fine pyrite - pyrrhotite.

Highlights of the last 12 drill holes intercepting multiple shears are as follows.

# HoleFrom (m)To (m)Length (m)Grade Au(g/t)
MB-17-141198.0199.01.016.9
 209.0212.03.04.5
 478.0479.41.45.0
MB-17-142142.0143.01.08.0
 184.9186.61.721.2
MB-17-143180.1181.61.524.7
 226.5227.51.04.4
MB-17-144148.0149.01.07.2
MB-17-145146.0147.01.012.7
MB-17-14656.057.01.06.5
 63.564.51.05.4
 387.0389.32.33.1
MB-18-148459.0471.012.03.9
MB-18-149337.2338.91.76.3
MB-18-150650.4650.90.517.8
MB-18-151137.7138.20.58.8
MB-18-152257.0262.15.16.4
MB-17-52 ext142.0142.50.516.9
 163.0164.11.131.5

Hole location:

Hole NumberAzimuthDipLength (m)UTM EastUTM NorthElevation
MB-17-141335-664864439565426321400
MB-17-142330-494534437755426201400
MB-17-143330-434294438105426195395
MB-17-144330-463244440445426450395
MB-17-145330-654234439955426306400
MB-17-146330-524624438095426295400
MB-18-148330-5510024443635426065400
MB-18-149330-554774445505426172400
MB-18-150330-5511004445505426172400
MB-18-151330-56.55104441405426419395
MB-18-152330-574754441885426336395
MB-17-52 ext330-454004439815426403394

Plan view of the Barry project is available at http://media3.marketwire.com/docs/BarryGold.jpg

Quality Control and Reporting Protocols

Metanor estimates that the actual thicknesses of the mineralized intersections are between 70% and 95% of the core lengths. No capping grade is used at this stage. The Company uses a rigorous QA-QC analytical program according to industry standards. The analytical results were done by pyroanalysis (A.A.) at the mine laboratory. Blanks, duplicates and certified reference standards are inserted into the sample stream to monitor laboratory performance. The company QA-QC analytical verification program requires that a minimum of 5% of the samples be audited at an independent laboratory. Theses audit assays were sent to ALS laboratory located in Val-d'Or, Quebec. The results of the audits are consistent with those obtained.

The Barry Project

The Barry project is located in the Urban-Barry mining camp, 110 km east from the city of Lebel-sur-Quévillon, and 110 km south of the Bachelor mill. 624,414 tonnes of ore grading 2.2 g/t for 43,970 ounces were extracted from three small pits between 2008 and 2010. A drilling campaign is underway at the Barry property to increase mineral resources below the pits in multiple high-grade shear zones and proceeding with an underground bulk sample program.

Lastly, the Corporation wishes to add to the press release issued December 28, 2017 regarding the completed private placement. In addition to the insider participation described, three insiders of Metanor participated in the non-brokered private placement for aggregate proceeds of $40,800. 

Qualified Persons

Pascal Hamelin, P. Eng., President and COO, is the Qualified Person under NI 43-101, responsible for reviewing and approving the technical information contained in this news release.

Cautionary and Forward-Looking Statements

This press release includes certain statements that may be deemed "forward-looking statements".

The potential quantity and grade is conceptual in nature as there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. All statements in this discussion, other than those of historical fact, that address future exploration drilling, exploration activities and projected exploration, including costs and other estimates upon which such projections are based, and events or developments that the company expects, are considered forward-looking statements. Although the Company believes the expectations expressed in these forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those forward-looking statements.

Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Metanor Resources Inc.
Pascal Hamelin
President & COO
819-825-8678
phamelin@metanor.ca

© 2024 Canjex Publishing Ltd. All rights reserved.