23:29:04 EDT Wed 13 May 2026
Enter Symbol
or Name
USA
CA



International Tower Hill Mines Ltd
Symbol ITH
Shares Issued 261,637,473
Close 2026-05-13 C$ 3.81
Market Cap C$ 996,838,772
Recent Sedar+ Documents

International Tower hires contractors for Livengood FS

2026-05-13 20:20 ET - News Release

Mr. Karl Hanneman reports

INTERNATIONAL TOWER HILL MINES ANNOUNCES APPOINTMENT OF FEASIBILITY STUDY TEAM AND LAUNCH OF FEASIBILITY STUDY DRILLING PROGRAM

International Tower Hill Mines Ltd. has awarded Livengood gold project feasibility study phase 1 contracts to a consortium comprising BBA Consultants USA LP, Hatch Ltd., Newfields Mining Design and Technical Services LLC, Resource Development Associates Inc. (RDA), and JDS Energy and Mining Inc.

The company is also pleased to announce that core drilling to support the feasibility study has commenced.

Alloy Drilling Inc., an Alaska-based drilling contractor with operations throughout the Western United States, has mobilized two rigs to Livengood and has begun drilling its initial large-diameter PQ core holes within the 13.6 million ounce measured and indicated resource, which includes the 9.0-million-ounce proven and probably gold reserve. The drilling program is designed to provide representative fresh ore samples for advanced metallurgical testing and process optimization work.

The metallurgical testwork on this fresh core will focus on evaluating opportunities to enhance gold recoveries and overall project economics in the context of a substantially higher gold price than the $1,680 per ounce assumption utilized in the company's prior study. The prior study selected gravity/CIL as the preferred processing option at the time but previous screening testwork has demonstrated the potential for significant recovery improvements from some Livengood ore through the application of pressure oxidation (POX). With current gold prices significantly above prior study assumptions, the company believes a comprehensive evaluation of alternative processing technologies and associated trade-off studies are warranted to determine whether additional value can be unlocked from the project.

Phase 1 of the feasibility study will: (1) ensure that the planned metallurgical testwork provides the detail necessary to support the upcoming trade-off studies and detailed engineering; (2) review and validate existing technical data, including the detailed geotechnical and hydrogeological site work completed in support of the 2013 feasibility study, and identify any material data gaps; and (3) develop a comprehensive execution plan and budget for completion of the feasibility study (FS), and begin detailed engineering in support of permitting.

BBA, Newfields, JDS and RDA each bring industry leading expertise and Livengood gold project experience as co-authors of the company's 2017 and 2023 prefeasibility studies. Hatch has been added to the team to provide additional expertise in POX processing, metallurgical optimization and trade-off studies. The parties will collaborate across technical disciplines where appropriate, with BBA leading overall integration and coordination of the FS deliverables.

About International Tower Hill Mines Ltd.

International Tower Hill Mines has a 100-per-cent interest in its Livengood gold project, located along the paved Elliott Highway, 70 miles north of Fairbanks, Alaska.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.