04:56:51 EST Sat 06 Dec 2025
Enter Symbol
or Name
USA
CA



Integra Gold Corp
Symbol ICG
Shares Issued 447,406,002
Close 2016-09-19 C$ 0.77
Market Cap C$ 344,502,622
Recent Sedar Documents

ORIGINAL: Integra Gold drills 12.7 m of 70.59 g/t Au at Lamaque

2016-09-19 10:45 ET - News Release

Received by email:

File: 2016-09-19 ICG Announces Eight Tranche of Triangle ResultsvFinal.pdf

                                                                                                  P.O Box 11144, Royal
---> Centre
                                                                                              #2270 -1055 West Georgia
---> Street
                                                                                               Vancouver, BC Canada, V
--->6E 3P3
                                                                                                 Email: chris@integrag
--->old.com




FOR IMMEDIATE RELEASE                                                               TSX-V: ICG; OTCQX: ICGQF
September 19, 2016                                                                     www.integragold.com


Integra Gold intersects 70.59 g/t gold over 12.7 m (includes 269.71 g/t over 1 m,
 197.66 g/t over 1 m and 227.83 g/t over 1 m) in shallow C2 structure infill hole
                              (all results uncapped)
Press Release Highlights:

        Other results include 54.43 g/t gold ("Au") over 3.6 metres ("m") in C5 step-out dril hole and
        68.97 g/t Au over 2.2 m in C4 structure infill drill hole (all results uncapped)

        Highest gold intercepts ever reported in C2 structure

        12.7 m (8.8 m estimated true thickness) intersection in drill hole TM-16-152 occurs 150 m below
        surface and is in close proximity to the planned route of the exploration decline now underway

        246 m of development completed in exploration decline as of Sept. 16, 2016

        5 drill rigs are currently active on the Lamaque Gold Project

VANCOUVER, BC: Integra Gold Corp. (TSX-V: ICG; OTCQX: ICGQF), ("Integra" or the "Company") is pleased
to announce additional assay results from its 2016 drill program on the Triangle deposit ("Triangle")
situated on the Lamaque South Gold Project ("Lamaque") in Val-d'Or, Quebec. Results continue to support
internal gold zone continuity and lateral expansion potential with infill and step out drill holes intersecting
significant high grade gold mineralization. Results announced today are from 16,950 m of drilling
conducted in 2016 and assays are currently pending from an additional 40,400 m (133 drill holes) of
diamond drilling at Triangle.

"We are excited to have one of the best intersections ever drilled at Triangle located near surface and in
an area of the deposit we will soon have access to via the exploration ramp now being constructed,"
commented Company President and CEO, Stephen de Jong. "In addition to the near surface success we
are encouraged by the impressive growth potential the C5 structure is now exhibiting with mineralization
over meaningful widths discovered in multiple drill holes beyond the limit of the previous resource
estimate."

Triangle Drill Results Summary

The following table highlights selected intercepts from this tranche of drill results. Detailed results are
presented in the link to the full assay results table below. Individual composites are disclosed as both
uncapped and capped (when applicable) with individual values capped at 34.3 g/t Au.
                                                                        -2-



                                                  From              To            Interval        Gold             Int
--->erpreted
                   Drill Hole Number
                                                   (m)             (m)             (m)(1)      Assay (g/t)(2)         
--->Zone
                      TM-16-117A                 530.00           531.30            1.30          22.81               
---> n/a
                                                 403.50           404.00            0.50          35.01               
---> n/a
                                                 Capped                                           34.30
                                                 610.00           614.50            3.60          54.43               
--->   C5
                       TM-16-118
                                                 Capped                                           11.05
                                                Includes                            0.60         294.54
                                                 631.50           632.00            0.50          24.67               
--->   n/a
                                                 284.00           288.40            4.40          10.10               
--->   C2
                                                 499.50           501.00            1.50           7.04               
--->   n/a
                    TM-16-119M01                 568.00           572.00            4.00          22.40               
--->   C4
                                                 Capped                                           16.59
                                                 742.00           746.00            4.00           8.42               
--->   C5
                                                 488.10           490.30            2.20          68.97               
--->   C4
                       TM-16-122
                                                 Capped                                           25.87
                   TM-16-125BM01                 280.80           284.10            3.30           9.18               
--->   C2
                     TM-16-129                   199.00           201.50            2.50           7.00               
--->   n/a
                                                 205.40           208.60            3.20          10.96               
--->   C2
                       TM-16-132                 238.00           238.50            0.50          52.89               
--->   n/a
                                                 Capped                                           34.30
                    TM-16-133A                   326.00           332.00            6.00           6.44               
--->  C2
                  TM-16-133AW01                  143.70           147.00            3.30          10.24               
--->  n/a
                TM-16-133AW01M01                 143.90           148.50            4.60           7.31               
--->  n/a
                     TM-16-135                   111.00           117.00            6.00           9.38               
---> C1-20
                                                 114.50           121.00            6.50           7.41               
---> C1-20
                    TM-16-135M01                 155.00           157.00            2.00           6.89               
--->  n/a
                                                 289.00           293.00            4.00           8.72               
--->  C2
                      TM-16-136                  203.20           204.60            1.40          12.38               
--->  n/a
                    TM-16-144M02                 178.50           179.50            1.00          23.18               
--->  n/a
                                                  48.50           51.50             3.00          12.01               
---> C1-20
                       TM-16-145
                                                 Capped                                            9.61
                                                 117.40           121.50            4.10           9.84               
--->   C2
                                                 126.50           128.80            2.30          35.31               
--->   n/a
                       TM-16-151
                                                 Capped                                           27.55
                                                 185.80           186.80            1.00          13.06               
--->   n/a
                                                 163.30           176.00           12.70          70.59               
--->   C2
                                                 Capped                                           19.36
                       TM-16-152                 Include                            1.00         269.71
                                                   and                              1.00         197.66
                                                   and                              1.00         227.83
                      n/a - no zone assigned yet

(1)   Downhole thickness; true width varies depending on drill hole dip; most drill holes are aimed at intersecting th
--->e vein structures close to
      perpendicular therefore true width are close to downhole width (approximately 85% conversion ratio); true width 
--->of C structures intercepts
      are presented on longitudinal sections.
(2)   For known mineralized zones, intervals are based on geological observation, i.e. on the amount of quartz veining
--->, a 1.00 g/t gold cut-off for
      compositing in intervals outside mineralized zones; individual composites are presented uncap and cap (when appl
--->icable) with individual
      values capped at 34.3 g/t Au; no minimum thickness considered.
                                                      -3-




The following table provides individual sample results for the high grade intersection in drill hole TM-16-
152:

                                                       Downhole
                                 From          To                      Gold
                                                        Interval
                                  (m)         (m)                   Assay (g/t)
                                                          (m)
                                163.30      163.90         0.60        0.63
                                163.90      164.50         0.60        20.78
                                164.50      165.50         1.00       269.71
                                165.50      166.50         1.00        74.65
                                166.50      167.00         0.50        24.56
                                167.00      168.00         1.00       197.66
                                168.00      169.00         1.00       227.83
                                169.00      170.00         1.00        0.49
                                170.00      171.00         1.00        0.06
                                171.00      172.00         1.00        6.79
                                172.00      173.00         1.00        39.19
                                173.00      174.00         1.00        0.69
                                174.00      174.70         0.70        0.29
                                174.70      175.50         0.80        32.56
                                175.50      176.00         0.50        56.12

Click on the following link to view a complete table of available composited results for the 2016 drilling at
Triangle (drill holes disclosed today are identified in red font).

http://www.integragold.com/i/pdf/2016-09-16-nrt-2w7yuf.pdf

Infill Drilling on the C2 Structure Highlights Excellent Internal Zone Continuity with Significant High
Grade Gold Mineralization

The C1 and C2 structures host the majority of the gold mineralization in the upper portion of Triangle and
are the focus of an extensive infill drilling program conducted at roughly 25 m centers with the objective
of proving internal continuity of gold mineralization while, at the same time, being used as a guide for the
underground exploration ramp that was initiated in July of this year. Today's results are some of the best
to ever be reported at Triangle, in particular for drill hole TM-16-152 reporting significant high grade gold
mineralization: 70.59 g/t Au over 12.7 m (19.36 g/t Au when capped at 34.3 g/t Au, downhole width, 8.8
m in true thickness, 150 m from surface). Of particular note is that numerous, at times consecutive, 1 m
intervals grading above 34.3 g/t Au are reported in this drill hole demonstrating that high grade
mineralization is widespread throughout the entire interval, a characteristic that appears to apply to the
C type structures.

Other significant intervals reported from the C2 structure include:

        10.10 g/t Au over 4.4 m;
        9.19 g/t Au over 3.3 m;
        10.96 g/t Au over 3.2 m;
                                                     -4-


        8.72 g/t Au over 4.0 m, and;
        9.84 g/t Au over 4.1 m.

All of the above results contribute to demonstrating the lateral continuity of gold mineralization in the C2
structure.

As illustrated in the longitudinal sections for C2 (see link below), results from numerous intercepts in that
structure are still pending. Note that true thickness of intervals are indicated on all longitudinal sections
and will differ from downhole lengths reported in the drill table.

http://www.integragold.com/i/maps/2016-09-16-nrm-c2-ls-2w7yuf.pdf

To view a cross section of Triangle and No. 4 Plug Deposits please click on the following link:

http://www.integragold.com/i/maps/2016-09-16-nrm-lsi-2w7yuf.pdf

Infill Drilling at C4 Showing Mineralization Continuity

Infill drilling at C4 also continues to successfully demonstrate mineralization continuity. The results
disclosed today report several high grade intercepts demonstrating the potential for the C4 structure to
continue to deliver resource potential in deeper parts of the Triangle Deposit (below 450m vertical). To
date, C4 is the largest and most continuous of the high-angle C-type structures at Triangle.

Results from this zone reported today include: 22.40 g/t Au over 4.0 m (TM-16-119M01, 16.59 g/t Au
when capped at 34.3 g/t Au, downhole width) and 68.97 g/t Au over 2.2 m (TM-16-122, 25.87 g/t Au
when capped at 34.3 g/t Au, downhole width) which are respectively located in the center and on the
eastern upper end of C4.

As illustrated in the attached vertical longitudinal section of the C4 structure (see link below), additional
results are pending from multiple infill and extensional drill holes at various depths ranging from 325 m
to 825 m vertical.

http://www.integragold.com/i/maps/2016-09-16-nrm-c4-ls-2w7yuf.pdf

The C5 Structure Continues to Expand

New results from extensional drilling of the C5 structure continue to show potential for lateral extension
of the structure. At C5, gold mineralization appears to commence at approximately 500 m vertical and
extend to at least 800 m vertical. Today's reported intercepts include 54.43 g/t Au over 3.6 m (TM-16-
118, 11.05 g/t Au when capped at 34.3 g/t Au, downhole width) and 8.42 g/t Au over 4.0 m (TM-16-
119M01, downhole width). These additional high grade gold intersects indicate substantial resource
potential upside with C5 currently accounting for only a small portion (<10%) of the resource at the
Triangle deposit.

The C5 structure, which has had materially less drilling completed on it compared to the C4 structure, is
viewed as a potential area of accelerated growth and will continue to be tested from surface and later
from underground utilizing the exploration decline at Triangle.
                                                     -5-


Please review the attached vertical longitudinal section of the C5 structure by clicking on the link provided
below.

http://www.integragold.com/i/maps/2016-09-16-nrm-c5-ls-2w7yuf.pdf

High Grade Mineralization Identified in between C-Type Structures

In addition to the mineralization identified in the primary C structures, high grade gold bearing intercepts
continue to be identified in between the well-defined structures, demonstrating the possibility for
additional mineralized structures to occur in between the main zones identified. These new mineralized
zones represent additional resource upside that will be evaluated during future resource modelling and
estimation and through close spaced underground drilling once underground access is granted.

Some the significant results include (all results uncapped):

            22.81 g/t Au over 1.3 m (TM-16-117A);
            35.01 g/t Au over 0.5 m (TM-16-118);
            52.89 g/t Au over 0.5 m (TM-16-132);
            10.24 g/t Au over 3.3 m (TM-16-133AW01);
            23.18 g/t Au over 1.0 m (TM-16-144M02);
            35.31 g/t Au over 2.3 m and 13.06 g/t Au over 1.0 m (TM-16-151).

Lamaque Project Exploration Program Summary

In 2016 a total of 95,400 m in 261 drill holes have thus far been completed at Lamaque South, of which
81,750 m in 232 holes were completed on Triangle. Drilling is ongoing with 5 drill rigs currently in
operation. The results announced today are from 42 drill holes (including 19 partial reports) representing
16,950 m. As of September 19, 2016, drill results are still pending from an additional 150 drill holes at
Lamaque representing 45,975 m. At Triangle alone there are pending results for 133 drill holes
representing 40,400 m. Results will continue to be disclosed regularly as they become available.

Triangle Deposit Summary

The Triangle zone consists of a series of high grade, parallel, steeply to moderately dipping mineralized
shear zones ("C" structures) structurally spaced at 125 to 150 m intervals, hosting gold-bearing quartz-
carbonate-tourmaline veins, which host the majority of the deposit's gold resources. The C1 and C2
structures occur from surface to a depth of 300 m and 475 m vertical respectively, the C4, C5, C6 structures
occur between 320m and 875m vertical, and the recently identified C7 structure is presently known to
extend from at least 975 m to 1,150 m vertical. The lateral and down-dip limits of gold mineralization for
the deeper C structures (C5, C6 and C7) have yet to be identified and are open for expansion.

Drilling conducted since mid-2015 at Triangle has focused on infill and step-out/extensional drilling within
select areas of the C1, C2, C4, C5 and C6 structures, and on deep testing of Triangle below 1,000 m vertical.
Characteristic geological host units, structural deformation in the form of shearing and alteration
assemblages associated with gold bearing veins are present within the structures observed to date in most
drill holes at Triangle. Ongoing results continue to demonstrate the validity of the predictive nature of the
geological model and associated high grade gold bearing vein structures.
                                                                       -6-




Project and Company Profile

Integra Gold is a junior gold exploration company advancing projects in Val-d'Or, Quebec, one of the top
mining jurisdictions in the world. The Company's primary focus is its high grade Lamaque South project.
In 2014, Integra completed the accretive acquisition of the Sigma Mill and Mine Complex, a fully permitted
2,200 ton per day mill and tailings facility. With major federal and provincial permits in place, existing
infrastructure and exploration potential, this acquisition removed major costs and shortened timelines
typically associated with mine projects. With a current market capitalization of approximately $350
million, Integra has raised over $100 million since 2013, at successively higher share prices, despite
depressed gold prices. In August 2015, Eldorado Gold Corporation completed a strategic investment in
Integra, acquiring 15% of the outstanding common shares. Integra was recently named to the TSX Venture
top 50 performers in 2015 and the OTCQX Best 50 award for 2015.

Qualified Person

The Lamaque project is under the direct supervision of Herve Thiboutot, Eng., Senior Vice-President of the
Company, and Jacques Simoneau, P. Geo., Exploration Manager of the Company. Mr. Thiboutot and Mr.
Simoneau are Qualified Persons ("QPs") as defined by the National Instrument 43-101. The Company's
QPs have reviewed the technical content of this release.

Quality Assurance - Quality Control ("QA/QC")

Thorough QA/QC protocols are followed on the project including insertion of duplicate, blank and
standard samples in all drill holes. The core samples are submitted directly to the Bourlamaque and ALS
Laboratories in Val-d'Or for preparation and analysis. Analysis is conducted on 1 assay-ton
aliquots. Analysis of Au is performed using fire assay method with atomic absorption (AA) finish, with a
gravimetric finish completed for samples exceeding 5 g/t Au. Results published are from the gravimetric
finish if above 5 g/t and from the AA finish if lower than 5 g/t.

ON BEHALF OF THE BOARD OF DIRECTORS

Stephen de Jong
CEO & President

CONTACT INFORMATION
Corporate Inquiries:                                    Chris Gordon: chris@integragold.com
                                                        Or visit the company website: www.integragold.com

Follow Integra Gold On:
     Twitter: http://twitter.com/integragoldcorp

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the 
--->TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Statements: Certain disclosures in this release constitute forward-looking s
--->tatements, including
timing of completion of an updated resource estimate, timing of completion of an updated PEA and completion of the Sig
--->ma-Lamaque transaction.
In making the forward-looking statements in this release, the Company has applied certain factors and assumptions that
---> are based on the
Company's current beliefs as well as assumptions made by and information currently available to the Company, including
---> that the Company is
                                                                       -7-


able to obtain any government or other regulatory approvals, that the Company is able to procure personnel, equipment 
--->and supplies required for
its exploration and development activities in sufficient quantities and on a timely basis and that actual results are 
--->consistent with management's
expectations. Although the Company considers these assumptions to be reasonable based on information currently availab
--->le to it, they may prove
to be incorrect, and the forward-looking statements in this release are subject to numerous risks, uncertainties and o
--->ther factors that may cause
future results to differ materially from those expressed or implied in such forward-looking statements. Such risk fact
--->ors include, among others,
those matters identified in its continuous disclosure filings, including its most recently filed MD&A. Readers are cau
--->tioned not to place undue
reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligati
--->on to, update or revise
any forward-looking statements whether as a result of new information, future events or otherwise, except as required 
--->by law.
 


© 2025 Canjex Publishing Ltd. All rights reserved.