TSX: GPD
www.goldenpredator.com
VANCOUVER, July 5, 2011 /PRNewswire/ - Golden Predator Corp. (TSX: GPD) (the "Company") is pleased to announce results from the
final five core holes from its winter 2011 drill program at the Carlos
Zone, Grew Creek Project, Yukon. Four of the five holes have
intersected significant mineralization including 92.0 m of 2.02 g/t
Gold beginning at a depth of 60 m in core hole GC11-281, 104.2 m of
1.68 g/t Gold from a depth of 42.7 m in core hole GC11-283 and 104.0m
of 1.33 g/t Gold from a depth of 130.9 m in core hole GC11-279.
The Company has now released all results from its winter 2011 core
drilling campaign at Grew Creek, which totalled 4,317 m in 20 holes in
the Carlos Zone. These holes complete a drill pattern with an average
spacing of 25 m, to support a recently commissioned NI 43-101
compliant resource calculation. Results also support the current
interpretation of structural controls on gold mineralization. These
data extend known mineralized trends down dip, along both strike
directions, and through areas where prior drilling was sparse. The
deposit remains open at depth but appears to be cut off along strike.
The Company has commenced its next phase of exploration on the Grew
Creek Project, will include property-wide geological mapping,
geophysical surveys, and reverse-circulation drilling of known altered
areas on strike with the Carlos Zone as well as projected structural
offsets.
The Grew Creek Project is located 32 km southwest of Faro, Yukon. The
property's 72 km2 encompasses 363 quartz claims, extending along both sides of the Robert
Campbell Highway for approximately 27 km with power lines traversing
the Project area.
Final Winter 2011 Diamond Drill Holes at Grew Creek, YT Significant Intercepts (1),(2) |
Drill Hole | From (m) | To (m) | Interval (m) | Gold (g/t) |
GC11-279
|
56.39
|
72.39
|
16.00
|
0.59
|
and | 130.87 | 234.87 | 104.00 | 1.33 |
including | 164.87 | 182.87 | 18.00 | 3.12 |
|
|
|
|
|
GC11-280 | No significant results |
|
|
|
|
|
GC11-281 | 60.05 | 152.05 | 92.00 | 2.02 |
including | 90.05 | 134.05 | 44.00 | 3.09 |
|
|
|
|
|
GC11-282
|
61.15
|
201.16
|
140.01
|
0.93
|
including | 155.15 | 189.15 | 34.00 | 1.68 |
|
|
|
|
|
GC11-283 | 42.67 | 146.83 | 104.16 | 1.68 |
including
|
50.67
|
63.01
|
12.34
|
5.25
|
|
|
|
|
|
(1) Results where g/t x m is less than 2.5 are not reported in this table,
unless the individual grade was ≥ 1g/t gold over a minimum of 2.0
metres. Other intervals require ≥0.5 g/t gold to be included.
(2) Grams per tonne (g/t) to troy ounces per short ton: g/t divided by
34.2857 or multiply by .0292. Meters to feet: 1 m equals 3.28084 ft.
The complete results of the Grew Creek 2011 winter drill program, with
accompanying maps, are available at:http://www.goldenpredator.com/documents/GPDNR11-25-GC-Results.pdf
Sampling Methodology, Quality Control and Assurance
Samples were fire assayed by ALS Chemex in Vancouver. Refer to the
Company's news release dated May 26, 2011 for a complete discussion of
sampling methods, quality control and assurance.
The technical content of this news release has been reviewed and
approved by Bruce R. Otto, MSc, PGeo, CPG, the Company's Senior
Structural Geologist and a Qualified Person as defined by National
Instrument 43-101.
About Golden Predator Corp.
Golden Predator Corp., a well-funded exploration and development
company, has a mandate to be the leading gold property explorer and
developer in Yukon, Canada. Golden Predator has a vast Yukon property
position with three advanced gold projects, 6 pipeline prospects as
well as exploration landholdings comprising over 2,300 km2. Drilling continues at the Company's flagship Brewery Creek Project,
exploration, geochemical, geophysical and reverse circulation drilling
activities are underway at Grew Creek, and diamond drilling has begun
at Clear Creek. In 2011 Golden Predator will work towards completing
initial resource estimates for Grew Creek and Clear Creek and updating
the existing resource estimate for Brewery Creek, in addition to
conducting initial drilling at the recently acquired Harlan project.
No stock exchange, securities commission or other regulatory authority
has approved or disapproved the information contained herein. This
press release contains projections and forward-looking information that
involve various risks and uncertainties regarding future events. Such
forward-looking information can include without limitation statements
based on current expectations involving a number of risks and
uncertainties and are not guarantees of future performance. There are
numerous risks and uncertainties that could cause actual results and
Golden Predator's plans and objectives to differ materially from those
expressed in the forward-looking information. Actual results and future
events could differ materially from those anticipated in such
information. These and all subsequent written and oral forward-looking
information are based on estimates and opinions of management on the
dates they are made and are expressly qualified in their entirety by
this notice. Except as required by law, Golden Predator assumes no
obligation to update forward-looking information should circumstances
or management's estimates or opinions change.
SOURCE Golden Predator Corp.