16:04:10 EDT Sun 05 May 2024
Enter Symbol
or Name
USA
CA



Greenfields Petroleum Corp
Symbol GNF
Shares Issued 22,105,438
Close 2015-08-25 C$ 0.34
Market Cap C$ 7,515,849
Recent Sedar Documents

Greenfields loses $2.99-million (U.S.) in Q2

2015-08-27 17:16 ET - News Release

Subject: Greenfields Petroleum Corporation Announces Financial Results for the Three and Six Months Ended June 30, 2015 and Operations Update Greenfields Petroleum Corporation Announces Financial Results for the Three and Six Months Ended June 30, 2015 and Operations Update
Marketwired
 
 
Greenfields Petroleum Corporation
TSX VENTURE:GNF
TSX VENTURE:GNF.DB
Other Recent News | Printer Friendly Version

August 27, 2015
Greenfields Petroleum Corporation Announces Financial Results for the Three and Six Months Ended June 30, 2015 and Operations Update
HOUSTON, TEXAS--(Marketwired - Aug. 27, 2015) -

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAWS.

Greenfields Petroleum Corporation (the "Company" or "Greenfields") (TSX VENTURE:GNF)(TSX VENTURE:GNF.DB), an independent exploration and production company with producing assets in Azerbaijan, announces its financial results and operating highlights for the second quarter and year-to-date of 2015. Except as otherwise indicated, all dollar amounts referenced herein are expressed in United States dollars.

Second Quarter and Year-to-Date 2015 Financial Results and Operating Highlights


--  Subsequent to Bahar Energy Operating Company Limited ("BEOC"), being the
    operating company with respect to the Gum Deniz Oil Field and Bahar Gas
    Field, receiving confirmation from SOCAR that the TPR1(1) contractual
    obligations under the ERDPSA have been fulfilled, Bahar Energy Limited
    ("Bahar Energy") paid the required $2.0 million bonus to the State Oil
    Fund of the Republic of Azerbaijan. This payment secured Bahar Energy's
    rights to the full twenty-five (25) year development and production
    term, through September 30, 2035, for the Contract Rehabilitation Area
    (as defined in the ERDPSA). At SOCAR's request, the bonus payment had
    been withheld until issuance of SOCAR's official confirmation letter
    which was received by BEOC in May 2015. 

--  The Company's 33.33% share of Bahar Energy entitlement sales volumes
    averaged 347 bbl/d and 4,793 mcf/d or 1,145 boe/d in the second quarter
    2015, and 311 bbl/d and 4,796 mcf/d or 1,110 boe/d year-to-date 2015. In
    comparison to the average volumes for the same quarter in 2014, bbl/d,
    mcf/d and boe/d volumes increased 8% for oil and decreased 31% for gas,
    and decreased 23% for boe/d, respectively. Year-to-date 2015 average
    volumes decreased for oil, gas and boe/d by 18%, 40% and 35%,
    respectively, when compared with same period in 2014.  

--  For the second quarter and year-to-date 2015, the Company, through its
    interest in Bahar Energy, realized an average oil price of $53.58 and
    $50.31 per barrel, respectively. This price decreased in comparison with
    an average of $99.47 and $100.04 per barrel realized for the same
    periods in 2014. The Company realized an average natural gas price of
    $3.96 per mcf for the same periods, which is a contractually constant
    fixed price. 

--  For the second quarter and year-to-date 2015, the Company's 33.33% share
    of Bahar Energy financial results represented net income of $0.5 million
    and $0.7 million, respectively. These results compare to a net loss of
    $0.2 million and net income of $3.0 million for the same periods in
    2014. 

--  For the second quarter and year-to date 2015, the Company realized net
    losses of $3.0 million and $4.3 million, respectively, which represents
    a loss per share (basic and diluted) of $0.14 and $0.21. In comparison
    with the same periods in 2014, the Company realized net losses of $4.9
    million and $3.8 million with losses per share of $0.24 and $0.20. 

--  On June 30, 2015, the Company secured temporary relief from its June 1,
    2015 interest payment of $0.9 million by way of a waiver from the
    holders of more than 50% of the principal amount of the convertible
    debentures ("Debentures"). The Company failed to make the interest
    payment due within 30 days of June 1, 2015, and such failure potentially
    became an Event of Default (as defined in the indenture governing the
    Debentures (the "Indenture"). On June 30, 2015, a majority of the
    holders of Debentures instructed the trustee under the Indenture to
    waive the Event of Default. Pursuant to the waiver, the June 1, 2015
    interest payment has been deferred until the earlier of: (i) December
    30, 2015; and (ii) 15 business days after the receipt of payment from
    Bahar Energy of at least $9.0 million towards the balance of default
    amounts due from Bahar Energy (as described below). 

--  On May 27, 2015, the Company's senior loan agreement dated November 25,
    2013 was amended (the "Amendment") to allow for an increase to the
    existing credit facilities made available to the Company. Pursuant to
    the Amendment, the Company secured an additional $2.0 million (the "New
    Tranche"). The funds available under the New Tranche are intended to
    finance the Company's ongoing development operations in Azerbaijan as it
    relates to the Gum Deniz Oil Field and Bahar Gas Field. The terms of the
    Amendment also allowed for the deferral until December 31, 2015 of $1.1
    million in interest payment due on July 1, 2015. 

--  On January 22, 2015, the Company completed a non-brokered private
    placement of 2,000,000 common shares of the Company at a price of
    CAD$1.11 per share (USD$0.90) for aggregate gross proceeds of $1.8
    million. The common shares were subject to a four-month hold period that
    expired on May 23, 2015. 

--  Pursuant to shareholders agreement of Bahar Energy ("BSA"), as at June
    30, 2015, Greenfields Petroleum International Company Ltd. ("GPIC"), a
    wholly-owned subsidiary of the Company, had funded by way of loans to
    Bahar Energy, a total of $22.1 million and accrued $3.2 million of
    interest and financing costs in connection with the loans, for an
    aggregated loan balance of $25.3 million at June 30, 2015. The funding
    is to cover defaulted obligations (the "Default Amount") of Baghlan, the
    other shareholder of Bahar Energy. The Default Amount includes $3.7
    million funded year-to-date through June 2015.
    
    Baghlan has failed to fund its share of the costs of Bahar Energy in
    accordance with the BSA and its loan funding obligation to Bahar Energy
    since January 2014. The BSA provides that in the event of a default by a
    shareholder in a funding obligation, the other shareholder is required,
    by additional loan, to provide such funds to Bahar Energy. To the extent
    that Baghlan defaults on its future funding obligations, Greenfields
    anticipates that it may also fund such amounts by further loans to Bahar
    Energy.
    
    As a result of the loan by GPIC of the Default Amount to Bahar Energy,
    the BSA stipulates that:
    
    
    --  all of Baghlan's loans to Bahar Energy have become "last in" loans
        and will not be repaid by Bahar Energy until all amounts outstanding
        under all of GPIC's loans to Bahar Energy, including the payment of
        the Default Amount, have been paid by Bahar Energy to GPIC in full,
        regardless of when such loans were made by Baghlan; 
        
    --  Baghlan is deemed to have assigned to GPIC a share of its dividends
        equal to the sum of: (i) the Default Amount; (ii) Greenfields' Cost
        of Funding (as defined in the BSA) of such Default Amount; and (iii)
        a default rate of 4% on such Default Amount computed from and
        including the date on which the Default Amount has been funded by
        GPIC to, but excluding, the date Baghlan remedies the default (the
        "Default Interest"); and 
        
    --  the right of any directors appointed by Baghlan to Bahar Energy to
        vote at a meeting of the board of directors of Bahar Energy is
        suspended until the Default Amount has been paid in full, together
        with the Default Interest.
        

--  The Company continues to support the ongoing efforts of the Trustee and
    Receivers to effect the sale of Baghlan's interest in Bahar Energy to a
    qualified third party. The Company remains optimistic that the purchaser
    will pay the Default Amount and related interest and costs as owed by
    Baghlan. The potential transfer of interest will require the approval of
    SOCAR. The Company is looking forward to the future participation of a
    well-funded partner to work with Greenfields and SOCAR to resume the
    redevelopment of the Bahar Gas Fields and the Gum Deniz Oil Field and
    realize the full exploitation potential of the remaining areas of the
    offshore block. 

--  TPR2(2) was met on March 31, 2014, thus obligating SOCAR to begin
    funding SOA's twenty percent (20%) share of BEOC cash calls beginning in
    April 2014. SOCAR, however, has not funded their share and have advised
    that they are waiting to understand the future partnership relationship
    within Bahar Energy before funding SOA's obligations. At December 31,
    2014, Bahar Energy had funded approximately $12.8 million of the cash
    calls on behalf of SOA. Although the Bahar project created positive cash
    flows for Bahar Energy during 2014, all surplus cash was used to fund
    the unfunded cash calls of SOA. At June 30, 2015, Bahar Energy has
    funded its 80% share of BEOC cash calls from entitlement revenues for
    2014 and SOA's 2015 cash calls in the amount of $5.8 million have
    continued to go unfunded and are past due to BEOC. We are expecting the
    repayment of SOA's unfunded 2014 balance paid by Bahar Energy and the
    funding of SOA's past due 2015 cash calls owed to BEOC to begin soon
    after the sale of the Baghlan interest in Bahar Energy is completed.  

                                                                            
     (1)  TPR1 refers to Target Production Rate 1 under the ERDPSA whereby  
          BEOC must maintain a daily production rate for 90 consecutive days
          equal to 1.5 times the average 2008 production rate, that rate    
          being 6,944 boe/d.                                                
                                                                            
     (2)  TPR2 refers to Target Production Rate 2 under the ERDPSA whereby  
          BEOC must maintain a daily production rate for 30 consecutive days
          equal to 2.0 times the average 2008 production rate, that rate    
          being 9,258 boe/d.
 
Operating Highlights and Plans


--  Due to the October 1, 2015 expiration of the agreement for sale and
    purchase of natural gas from the Bahar Field between BEOC and SOCAR, an
    amendment has been submitted to SOCAR for approval.  

--  The Absheron Operating Company ("AOC") has advised BEOC that they will
    not pay outstanding obligations of about $2.5 million ($0.7 million for
    the Company's share) for services provided by BEOC under the facilities
    sharing agreement between the two entities. As a consequence of AOC's
    failure to pay, BEOC has terminated the agreement and requested approval
    of BEOC's Management Committee (formed by representatives of Bahar
    Energy and SOCAR) to take legal action against AOC.  

--  Gum Deniz oil production in second quarter 2015 averaged 1,353 bbl/d, an
    increase of 250 bbl/d from first quarter 2015. This production was below
    budget by 400 bbl/d due to BEOC's limited access to suitable marine
    vessels necessary to move rigs for workovers. During the quarter, a
    total of 10 recompletions and service workovers were conducted in Gum
    Deniz Oil Field. 

--  Bahar gas production averaged 18,318 mcf/d in second quarter 2015,
    approximately 1,242 mcf/d below first quarter 2015 and about 2,038 mcf/d
    below the proposed budget. Production declines have been affected by
    liquid loading. The Bahar workover program has been delayed due to the
    limited access to heavy crane vessels to move workover rigs. 

--  BEOC continued progress on several construction projects. The
    refurbishment of Bahar platform 48 (Phase 1) was completed while work is
    now underway on platforms 77 and 136. Also, a project to strengthen the
    Gum Deniz causeway continues as well as fire and safety upgrades on
    platforms 9, 450 and 209. A project design has been completed for a new
    gas lift line, an oil export line, and other infrastructural support. 

--  SOCAR will begin the removal of their derricks and platforms that pose a
    risk to BEOC safety and operations. 

--  The Pre-Stack Time Migration ("PSTM") processing of the 3-D data for Gum
    Deniz commenced in late May 2015 by PGS-Almaty in Kazakhstan after
    export of the data to the processor was approved by the Azerbaijan
    government authorities. The processing time is scheduled to take five
    months. A joint contractor/client meeting was held in Almaty in June to
    finalize the processing sequences and choices. The work is estimated to
    be completed in early Q4 2015. 

--  Initial processing of the Gum Deniz 3-D data was conducted on an
    expedited basis (Fast Track Volume) and provided to BEOC in early May
    2015. Interpretation commenced and is ongoing. This preliminary volume
    will aid in providing support for initial 2016 drilling plans and 2015
    workovers, while awaiting the completion of the PSTM processed data. 

--  The Bahar Field Reservoir Study awarded to ERA Consultants in February
    2015 for the preparation of a detailed reservoir model to be used in
    selecting re-development opportunities, both workovers and drilling in
    the Bahar Gas Field, was completed in draft form with an initial report
    provided for review May 2015. The integration of report data with the
    recently acquired 50 line kilometers of 2-D seismic was completed in
    June 2015 and reviewed with BEOC and the Company's technical teams. A
    list of both workovers and new wells was proposed in the report as a
    result of the revised reservoir model. The proposed workover and
    drilling locations and targets are under review by BEOC for
    incorporation into the work program for year end 2015 and the work
    programs for 2016 and beyond. 

--  The tender for the integrated geological, geophysical, and reservoir
    engineering interpretation and reservoir model for the Gum Deniz field
    was awarded to ERA consulting by BEOC at the end of second quarter 2015.
    The goal of the study is to determine the flow units in the field, their
    extent, and hydrocarbon volumes, both initial and present, and prepare a
    revised development plan for their effective exploitation.
 
Selected Information

The selected information below is from the Greenfields' Management Discussion & Analysis for the three and six months ended June 30, 2015. The Company's complete financial statements as of and for the three and six months ended June 30, 2015 and 2014 with the notes thereto and the related Management's Discussion & Analysis can be found on Greenfields' website at www.Greenfields-Petroleum.com and on SEDAR at www.sedar.com. All amounts below are in thousands of US dollars unless otherwise noted.

Greenfields Petroleum Corporation


----------------------------------------------------------------------------
                                     Three months ended    Six months ended 
(US$000's, except as noted)                     June 30             June 30 
                                    ----------------------------------------
                                         2015      2014      2015      2014 
Financial                                                                   
----------------------------------------------------------------------------
                                                                            
Revenues                                  470       469       807       896 
Net (loss) income                      (2,995)   (4,900)   (4,346)   (3,799)
Per share, basic and diluted         $  (0.14) $  (0.24) $  (0.21) $  (0.20)
                                                                            
Capital Items                                                               
----------------------------------------------------------------------------
                                                                            
Cash and cash equivalents                                     710     4,910 
Total Assets                                               87,683    65,772 
Working capital                                            (2,016)    4,865 
Convertible debt and Shareholders'                                          
 equity                                                    58,488    63,802 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
 
Bahar Energy Limited (a Joint Venture) (2)


----------------------------------------------------------------------------
                                   Total Joint Venture      Company's share 
                                  ------------------------------------------
(US$000's, except as noted)               Three months ended June 30        
                                  ------------------------------------------
                                        2015      2014       2015      2014 
----------------------------------------------------------------------------
Financial                                                                   
                                                                            
Revenues                              10,756    17,453      5,817     5,817 
Net (loss) income                      1,440      (588)       481      (186)
----------------------------------------------------------------------------
Operating                                                                   
----------------------------------------------------------------------------
                                                                            
Average Entitlement Sales Volumes                                           
 (1)                                                                        
Oil and condensate (bbl/d)               964       964        321       321 
Natural gas (mcf/d)                   20,952    20,952      6,983     6,983 
Barrel oil equivalent (boe/d)          4,456     4,456      1,485     1,485 
                                                                            
Average Oil Price                                                           
Oil price ($/bbl)                  $  101.83 $  101.83  $  101.83 $  101.83 
Net realization price ($/bbl)      $   99.47 $   99.47  $   99.47 $   99.47 
Brent oil price ($/bbl)            $  109.69 $  109.69  $  109.69 $  109.69 
                                                                            
Natural gas price ($/mcf)          $    3.96 $    3.96  $    3.96 $    3.96 
                                                                            
Capital Items                                                               
----------------------------------------------------------------------------
                                                                            
Total Assets                         203,072   199,292     67,684    66,424 
Total Liabilities                     41,018    42,175     13,671    14,058 
----------------------------------------------------------------------------
Net Assets                           162,054   157,114     54,013    52,366 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                                   Total Joint Venture       Company's share
                                --------------------------------------------
(US$000's, except as noted)               Six months ended June 30          
                                --------------------------------------------
                                       2015       2014       2015       2014
----------------------------------------------------------------------------
Financial                                                                   
                                                                            
Revenues                             20,186     40,351      6,728     13,449
Net (loss) income                     2,187      9,099        729      3,032
                                                                            
----------------------------------------------------------------------------
Operating                                                                   
----------------------------------------------------------------------------
                                                                            
Average Entitlement Sales                                                   
 Volumes(1)                                                                 
Oil and condensate (bbl/d)              933      1,133        311        378
Natural gas (mcf/d)                  14,391     23,941      4,796      7,980
Barrel oil equivalent (boe/d)         3,332      5,123      1,110      1,708
                                                                            
Average Oil Price                                                           
Oil price ($/bbl)                 $   51.67  $  102.13  $   51.67  $  102.13
Net realization price ($/bbl)     $   50.31  $  100.04  $   50.31  $  100.04
Brent oil price ($/bbl)           $   58.08  $  108.93  $   58.08  $  108.93
                                                                            
Natural gas price ($/mcf)         $    3.96  $    3.96  $    3.96  $    3.96
                                                                            
Capital Items                                                               
----------------------------------------------------------------------------
                                                                            
Total Assets                        203,072    199,292     67,684     66,424
Total Liabilities                    41,018     42,175     13,671     14,058
----------------------------------------------------------------------------
Net Assets                          162,054    157,114     54,013     52,366
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                                            
(1)  Daily volumes represent the Company's share of the Contractor Parties  
     entitlement volumes net of compensatory petroleum and the government's 
     share of profit petroleum. Effective October 1, 2013, the compensatory 
     petroleum increased from 5% to 10% where it will remain until specific 
     cumulative oil and gas production milestones are attained.             
(2)  The Company's 33.33% interest in Bahar Energy Limited is disclosed in  
     the Unaudited Condensed Consolidated Financial Statements as a Joint   
     Venture and accounted for using the equity method.
 
About Greenfields Petroleum Corporation

Greenfields is a junior oil and natural gas company focused on the development and production of proven oil and gas reserves principally in the Republic of Azerbaijan. The Company plans to expand its oil and gas assets through further farm-ins, and acquisitions of Production Sharing Agreements from foreign governments containing previously discovered but under-developed international oil and gas fields, also known as "greenfields". More information about the Company may be obtained on the Greenfields website at www.greenfields-petroleum.com.

Forward-Looking Statements

This press release contains forward-looking statements. More particularly, this press release may include, but is not limited to, statements concerning: production, drilling and completion plans and the expected timing thereof, PSTM processing, the sale of Baghlan Group Limited's interest in Bahar Energy, expectations regarding the repayment of SOA's unfunded 2014 balance paid by Bahar Energy and the funding of SOA's past due 2015 cash calls owed to BEOC, and operating plans. In addition, the use of any of the words "initial, "scheduled", "can", "will", "prior to", "estimate", "anticipate", "believe", "should", "forecast", "future", "continue", "may", "expect", and similar expressions are intended to identify forward-looking statements. The forward-looking statements contained herein are based on certain key expectations and assumptions made by the Company, including, but not limited to, expectations and assumptions concerning the success of optimization and efficiency improvement projects, the availability of capital, current legislation, receipt of required regulatory approval, the success of future drilling and development activities, the performance of existing wells, the performance of new wells, general economic conditions, availability of required equipment and services, weather conditions and prevailing commodity prices. Although the Company believes that the expectations and assumptions on which the forward-looking statements are based are reasonable, undue reliance should not be placed on the forward-looking statements because the Company can give no assurance that they will prove to be correct.

Since forward-looking statements address future events and conditions, by their very nature they involve inherent risks and uncertainties most of which are beyond the control of Greenfields. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results, performance or achievements could vary materially from those expressed or implied by the forward-looking information. These risks include, but are not limited to, risks associated with the oil and gas industry in general (e.g., operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections relating to production, costs and expenses, and health, safety, political and environmental risks), commodity price and exchange rate fluctuations, changes in legislation affecting the oil and gas industry and uncertainties resulting from potential delays or changes in plans with respect to exploration or development projects or capital expenditures. Additional risk factors can be found under the heading "Risk Factors" in Greenfields' Annual Information Form and similar headings in Greenfields' Management's Discussion & Analysis which may be viewed on www.sedar.com.

The forward-looking statements contained in this press release are made as of the date hereof and Greenfields undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws. The Company's forward-looking information is expressly qualified in its entirety by this cautionary statement.

Notes to Oil and Gas Disclosures

Barrels Oil Equivalent or "boe" may be misleading, particularly if used in isolation. All volumes disclosed in this press release use a 6mcf: 1boe, as such is typically used in oil and gas reporting and is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead. The Company uses a 6mcf: 1boe ratio to calculate its share of entitlement sales from the Bahar Project for its financial reporting and reserves disclosure.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:
Greenfields Petroleum Corporation
John W. Harkins
Chief Executive Officer
(832) 234-0800

or

Greenfields Petroleum Corporation
A. Wayne Curzadd
Chief Financial Officer
(832) 234-0800
info@greenfieldspetroleum.com
www.greenfields-petroleum.com
INDUSTRY: Energy and Utilities - Oil and Gas

Suite 900, 25 York Street, Toronto, ON M5J 2V5 | Toll Free:888-299-0338 | Phone: 416-362-0885 | info@marketwired.com


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click here. .

© 2024 Canjex Publishing Ltd. All rights reserved.