Mr. Tero Kosonen reports
FINEX METALS GRANTED EXPLORATION LICENSE FOR KERO PROJECT IN FINLAND, ADDING DISTRICT-SCALE GOLD UPSIDE NEAR KITTILA AND IKKARI DEPOSITS
Finex Metals Ltd. has been granted the Kero mineral exploration licence by the Finnish Mining Authority (TUKES). The 100-per-cent-owned Kero gold project
is located in
the Central Lapland greenstone belt (CLGB) of northern Finland, approximately 15 kilometres southeast of Agnico Eagle's Kittila gold mine, Europe's largest primary gold operation and approximately 20 km northwest of
Rupert Resources' multimillion-ounce Ikkari discovery.
Highlights:
-
Strategic location:
Kero is a 100-per-cent-owned, royalty-free orogenic gold prospect
within the Paleoproterozoic CLGB, the same belt that hosts Agnico Eagle's Kittila gold mine and Rupert Resources' Ikkari discovery, two of Europe's most significant gold deposits.
-
Gold endowment:
Historical drilling and trenching completed by the Geological Survey of Finland (GTK) outlined multiple gold-bearing zones, including drill intercepts up to
9.05 metres grading 1.95 grams per tonne Au
(gold) (including 12.6 g/t Au over 1.05 m) and 2.3 g/t Au over 3.3 m and 1.1 g/t Au plus 1.34 g/t Pd (palladium) plus 0.37 g/t Pt (platinum) over one m. Continuous
channel sampling returned
6.2 m grading 7.5
g/t Au, including one m grading 16.4 g/t Au and one m grading 25.6 g/t Au.
-
District-scale gold system:
Gold-bearing trends extend for more than one km along strike, with multiple high-grade surface targets untested by drilling and gold mineralization associated with shear and fault zones, hydrothermal alteration (carbonate, sericite, chlorite and albite) and iron-formation host rocks, features generally consistent with orogenic gold systems.
-
Drill-ready with
modern exploration upside:
Historical work has defined multiple areas for drill testing and highlighted the potential for structural and geophysical reinterpretation with a clear path for drilling in the second half of 2026.
Tero Kosonen, president and chief executive officer, states:
"The Kero licence grant is an important step as we continue building a strategic portfolio of 100-per-cent-owned, royalty-free gold projects in northern Finland. Kero adds an additional highly prospective gold system in the Central Lapland greenstone belt, with gold mineralization confirmed in drilling and channel sampling. Our priority is reinterpretation, target ranking and a disciplined, phased exploration program to unlock the project's potential."
Kero exploration licence
The Kero exploration licence provides Finex with the right to advance a highly prospective, undertested orogenic gold system. The project benefits from extensive historical work completed by the GTK, including geophysical surveys (magnetics, EM, IP, SP, gravity, VLF-R and AMT), till and bedrock geochemical sampling, trenching, heavy mineral studies, and approximately eight kilometres of diamond drilling. Despite this foundation, Kero has not been systematically advanced by a modern exploration company with a gold-focused discovery strategy. Finex is in the process of compiling and verifying the historical GTK data sets as a basis for planning modern, gold-focused exploration programs at Kero.
Project overview
The Kero project is located within the CLGB
and lies along the northern continuation of the Porkonen iron formation, within a structurally complex corridor characterized by folding, shearing and multiple deformation events.
Kero is underlain by Paleoproterozoic volcanic and sedimentary rocks, including mafic volcanics, graphite-bearing tuffs, cherts and iron formation-related lithologies. Host rocks at Kero are comparable with those at the Kittila mine, while the structural setting shows similarities to the deformation and fluid pathways interpreted at Ikkari. The Kero project benefits from strong geological and structural analogues within some of Europe's major gold discoveries.
The area was studied by the GTK
between 2002 and 2009 when it
conducted geophysical surveys, till and bedrock sampling, heavy mineral surveys, trenching, and shallow drilling with the goal of encouraging exploration and development in the region. Exploration results from the Kero gold project area demonstrate a broad and relatively coherent gold anomaly identified both at surface and at depth. Heavy mineral sampling identified abundant locally derived gold grains and elevated gold values consistent with a proximal bedrock source. Gold mineralization is
reportedly hosted by quartz-carbonate veins associated with chert layers interbedded with metavolcanic rocks and graphitic tuffs which have undergone extensive carbonate, potassic and albite alteration. The GTK identified an intermittent 1.2-kilometre-long gold mineralized zone, the best intercept from historical drilling being 9.05 m grading 1.95 g/t Au from 142.5 m down hole (including 1.05 m grading 12.6 g/t Au). Drilling and channel sampling (best interval: 6.2 m grading 7.5 g/t Au, including one m grading 16.4 g/t Au and one m grading 25.6 g/t Au) suggest that Kero has potential for high-grade gold lodes. Gold is consistently associated with key pathfinder elements including arsenic, bismuth and tellurium, highlighting the fertility of the system. Historical drilling has only tested very shallow depths (average depth of holes being 80 m). The hole with the reported highest grade gold intercept is from one of the deepest holes adjacent to a VTEM geophysical anomaly with deep roots, providing support to Finex's thesis that higher-grade gold lodes can potentially be identified at depth.
Historical exploration demonstrates that Kero hosts extensive hydrothermal alteration and multielement geochemical anomalies (Au, As, Sb, Te, Zn, Mn) (gold, arsenic, antimony, tellurium, zinc, manganese), coincident with interpreted structural zones and gold mineralization. These features are considered highly favourable for the concentration of gold in structurally-controlled systems.
Exploration potential and next steps
Historical reports note that gold
is associated with sulphide-rich quartz-carbonate veins and mineralization remains open along strike and at depth.
Importantly, the GTK recommended additional diamond drilling, to expand on shallow drilling to properly evaluate the continuity, geometry and scale of the gold-bearing zones.
Finex believes that the Kero project offers substantial exploration potential through:
-
Reinterpretation of historical geophysical and structural data using modern techniques and a new understanding gained from other deposits in the district;
-
Systematic till and bedrock sampling of the southern part of the project area which hosts favourable geology and remains untested;
-
Systematic drill testing of high-grade surface targets that remain undrilled;
-
Targeting of structural intersections and favourable iron-formation horizons identified in historical mapping and geophysical data sets;
-
Targeted drilling of deep conductive zones identified in historical VTEM surveys.
The company is currently reviewing the extensive historical data set and plans to outline a 2026 phased exploration program at Kero, including target prioritization and planning of an initial diamond drill program in the second half of 2026.
About Finex Metals Ltd.
Finex Metals is a gold-, nickel- and platinum-group-element-focused mineral exploration company advancing a portfolio of 100-per-cent-owned, royalty-free projects in northern Finland, strategically located in the Central Lapland greenstone belt and Eastern Lapland greenstone belt. Finex's projects are near existing mining operations and benefit from strong infrastructure, a stable jurisdiction and a proven exploration model, supporting multiple targets with clear discovery potential in one of Europe's most prospective and underexplored regions.
Finex Metals is part of the NewQuest Capital Group, a discovery-driven investment group that builds value through the incubation and financing of mineral projects and companies.
Qualified person
The scientific and technical information contained in this news release has been reviewed and approved by Dr. Petri Peltonen, MAusIMM (CP), EurGeol, a qualified person (QP) as defined in National Instrument 43-101 -- Standards of Disclosure for Mineral Projects. Dr. Peltonen is not independent by reason of being a contractor and shareholder of the company.
The historical exploration data referenced in this release were generated by GTK and have not yet been independently verified by Finex Metals; such data should not be relied upon as current and do not conform to the requirements of NI 43-101 for mineral resource or reserve estimation. The company's planned work programs include data verification and confirmatory sampling to support future NI 43-101 compliant disclosure.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.