19:29:07 EDT Tue 11 Aug 2026
Enter Symbol
or Name
USA
CA



Endurance Gold Corp
Symbol EDG
Shares Issued 200,124,642
Close 2026-08-11 C$ 0.51
Market Cap C$ 102,063,567
Recent Sedar+ Documents

Endurance drills 6.1 m of 9.27 g/t Au at Reliance

2026-08-11 16:33 ET - News Release

Mr. Robert Boyd reports

ENDURANCE REPORTS ENCOURAGING DOWN DIP EXTENSION OF THE EAGLE ZONE AT RELIANCE

Endurance Gold Corp. has released the second batch of 2026 assay results from its 100-per-cent-owned Reliance gold project. The road-accessible project is located four kilometres east of Gold Bridge, B.C., in the historic Bridge River mining camp. In January, 2026, the company reported an inaugural inferred mineral resource estimate of 19.6 million tonnes at an average grade 2.30 grams per tonne gold for 1.45 million ounces contained gold.

Highlights include:

  • DDH26-135 returned 9.27 g/t gold and 0.36 per cent antimony over 6.1 metres, including 19.40 g/t gold and 0.23 per cent antimony over 1.0 m from the Eagle Zone commencing at 254.1-metre downhole depth:
    • This high-grade gold intersection represents a 100-metre downdip extension external to the current MRE in the Eagle zone feeder structure previously intersected by hole DDH22-023 (9.57 g/t Au over 1.6 m; see news release dated July 18, 2022).
  • Commencing at 160-metre downhole depth, this same hole DDH26-135 also intersected 4.33 g/t gold and 0.03 per cent antimony over 7.7 m, including 9.53 g/t gold and 0.07 per cent antimony over 2.9 m. This represents an infill intersection in the MRE at the Eagle South structure of the Eagle zone.
  • Drilling is active with an additional 11 diamond drill holes completed. Ten of the holes are at the Crown and Imperial zones with the objective of expanding the MRE at these areas.

"Drilling continues to deliver at Reliance with five of the seven holes reported to date hosting encouraging drill intersections consistent with our pre-2026 drilling success statistics, thus delivering growth potential for the Reliance project," said Robert T. Boyd, president and chief executive officer.

As of the end of July, the fully financed, two-diamond drill rig program has completed 7,200 m in 18 drill holes at the Eagle, Crown and Imperial zones along the Royal shear trend. In April, 2026, the company announced a planned minimum of 8,000 m of diamond drilling, and current estimates indicate the 2026 program may exceed 10,000 m in the area of the MRE as we continue drilling. Additional holes and metres are being added to the MRE expansion program to follow up on the observation of mineralization intersected in 2026 along the margins of the mineral resource estimate.

The drill holes reported herein were designed to test the southern and downdip extent of the Eagle zone adjacent to the Royal shear fault where mineralization is often disrupted by a typically unmineralized polymictic breccia melange.

Drill holes DDH26-135 and DDH26-136 intersected the Eagle zone feeder structure below the MRE and represent a downdip expansion of mineralization. DDH26-135 results are reported in the highlights above. Hole DDH26-136 intersected 2.21 g/t gold and 0.02 per cent antimony over 4.6 m, including 6.22 g/t gold and 0.04 per cent antimony over 1.3 m. DDH26-136 also intersected a deeper mineralized splay that returned 4.22 g/t gold and 0.18 per cent antimony over 0.5 m.

Drill holes DDH26-133 and DDH26-135 intersected the Eagle South horizon in the footwall of the Royal shear fault. DDH26-135 intersected 4.33 g/t gold and 0.03 per cent antimony over 7.7 m, including 9.53 g/t gold and 0.07 per cent antimony over 2.9 m, which is considered an infill intersection of the Eagle zone MRE. Drill hole DDH26-133 intersected the southern boundary of the Eagle South horizon where mineralization bifurcates and interacts with the breccia melange. The hole returned an assay composite of 1.18 g/t gold over 18.8 m from several mineralized structures, of which the most significant was 3.16 g/t gold over 2.9 m.

The two drilling rigs are currently working at the Imperial and Crown zones where the one rig is testing the depth extent of the Imperial zone and the second rig is testing the continuity of mineralization between the two zones. Eight holes have been completed at the Imperial/Crown zones with the ninth and 10th in progress. Assay results are pending.

All drill assay results are reported as core length intervals. True composite widths are estimated at 80 per cent to 100 per cent of core length.

The Reliance gold project is interpreted to host a shallow-level (epizonal) orogenic gold system. Gold mineralization is directly related to varying amounts, though generally low concentrations of sulphides, including pyrite, arsenopyrite and stibnite. These occur as sulphide replacement and multigenerational breccias, which are frequently associated with pervasive silicification, quartz stockwork and/or quartz breccia infill. The geological setting and drilling results to date support the company's view that the project has near-surface and underground growth potential.

Mineral resource estimate disclaimer and qualified person

The mineral resource estimate was prepared for Endurance by Ginto Consulting Ltd. in accordance with National Instrument 43-101 (Standards of Disclosure for Mineral Projects) with an effective date of Jan. 8, 2026. Please see the NI 43-101 technical report dated March 10, 2026, for additional disclosure for the MRE. The report, titled "NI 43-101 Mineral Resource Estimate and Technical Report on the Reliance Gold Project, British Columbia, Canada," is available on SEDAR+ under the company's profile and on the company's website.

Mineral resources, which are not mineral reserves, do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, changes in global gold markets or other relevant issues.

Endurance is a precious metal exploration and development company focused on the acquisition, exploration and development of highly prospective North American mineral properties. Its exploration focus is currently to advance the Reliance gold project, located near Gold Bridge, B.C., in the historic Bridge River gold mining camp.

The technical and scientific information in this news release has been reviewed and approved by Darren O'Brien, PGeo, vice-president, exploration, of the company and a qualified person as defined in National Instrument 43-101. Mr. O'Brien has reviewed and approved of this news release.

Diamond drill core was logged and evaluated on the property and samples designated for assay analysis under the supervision of a geologist at the property. Drilling was completed with HQ and NQ size tools capable of collecting 6.35- and 4.76-centimetre diameter core (respectively). Drill core was cut using a diamond saw with one-half of the core sent for analysis and the remaining kept for future studies. All drill core samples have been submitted to ALS Global in North Vancouver, B.C., an ISO/IEC 17025:2017 accredited laboratory, where they are crushed to 70 per cent less than two millimetres then up to 250 grams pulverized to less than 75 microns. Samples are then submitted for four-acid digestion and analyzed for 48-element ICP-MS (ME-MS61) and gold 30-gram FA ICP-AES finish (AU-ICP21). Overlimit samples returning greater than 10 parts per million gold are reanalyzed by Au-GRA21 methodology, and overlimit antimony returning greater than 10,000 ppm Sb is reanalyzed by Sb-AA08 methodology. Samples with visible gold are reanalyzed by a metallic screening method Au-SCR21, which incorporates a one-kilogram pulp screened to 100 microns and includes assaying of the entire oversize fraction.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.