20:25:43 EDT Wed 15 May 2024
Enter Symbol
or Name
USA
CA



Collective Metals Inc
Symbol COMT
Shares Issued 25,658,634
Close 2023-05-24 C$ 0.24
Market Cap C$ 6,158,072
Recent Sedar Documents

Collective Metals begins Princeton phase 1 work program

2023-05-25 12:15 ET - News Release

Mr. Christopher Huggins reports

COLLECTIVE METALS ANNOUNCES 2023 PHASE 1 WORK PROGRAM ON ITS FLAGSHIP COPPER-GOLD PRINCETON PROJECT IN SOUTHEASTERN BRITISH COLUMBIA

Collective Metals Inc. has initiated its 2023 work program on the Princeton project. The project is a copper-gold project located in southeastern British Columbia covering 70,570 acres west and is southwest of Princeton, B.C. The project is also approximately 10 kilometres west of Copper Mountain Mining Corp.'s currently producing Copper Mountain mine, which hosts a proven and probable mineral reserve of 702 million tonnes of 0.24 per cent copper. The project hosts potential for identification of one (or more) copper-gold alkalic porphyry occurrences similar in age and deposit type to the Copper Mountain mine.

Christopher Huggins, chief executive officer of Collective, commented: "Taking advantage of the full exploration season is a high priority for the Collective team. Fieldwork conducted early in the year will guide further exploration and target generation later this year -- including more in-depth work such as lidar, airborne and magnetic studies. As we prepare for our drilling program, it is extremely important we leverage as much data as possible to identify and validate targets through multiple data points."

Prime objectives for the initial work program include but are not limited to the following:

  • Examine and sample the diorite intrusives identified on the property and review correlations proposed with either the Tulameen mafic-ultramafic complex and/or the Copper Mountain suite (associated with the Copper Mountain mine).
  • Examine iron carbonate-silica alteration identified as alteration around diorite intrusions in the upper portion of the Fourteen Mile Creek drainage. Recent work on the logging road network has exposed more altered exposures for mapping and sampling.
  • Geological mapping and sampling around the western and southern portion of the prominent, high-intensity magnetic anomaly (see news release dated May 10, 2023), including but not limited to the Copper Creek area. It is an underexplored and highly prospective area on the southern fringe of a magnetic anomaly.
  • Reviewing/relogging initial drill core recovered from the 2015 drill core in the Trojan-Condor corridor.

Field personnel will be mobilizing to the project later this month to initiate mapping and additional sampling of high-priority targets areas identified by the previous operator. The project is easily accessible by road, located immediately west of Highway 3, in a well-established mining district with excellent infrastructure, a local work force and support services. British Columbia is known as a low-risk jurisdiction with high standards for environmental stewardship and community engagement.

Qualified person

This news release has been reviewed and approved by Rick Walker, PGeo, who is acting as the company's qualified person for the Princeton property project, in accordance with regulations under National Instrument 43-101.

About Collective Metals Inc.

Collective Metals is a resource exploration company specialized in precious metals exploration in North America. The company's flagship property is the Princeton project, located in south-central British Columbia, Canada, approximately 10 kilometres west of the currently producing Copper Mountain mine. The Princeton project consists of 29 mineral tenures totalling approximately 28,560 hectares (70,570 acres) in a well-documented and prolific copper-gold porphyry belt and is easily accessible by road, located immediately west of Highway 3.

The company's Landings Lake lithium project is in Northwestern Ontario, where numerous lithium deposits have been delineated to host significant reserves of Li2O (lithium oxide). The Landings Lake lithium project is located 53 km east of Ear Falls, Ont., and covers 3,146 hectares.

Collective Metals is also advancing the Uptown gold project four km outside of Yellowknife, adjacent to several high-grade past-producing mines. The Uptown gold property is a high-grade Archean lode gold prospect adjoining the Giant mine in Yellowknife, NWT. The property consists of four claims covering over 2,000 hectares and borders the west side of the Giant mine leases.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.