TORONTO, July 25, 2013 /CNW/ - Alacer Gold Corp. ("Alacer Gold" or the "Corporation")today announces an updated Mineral Resource estimate for the Çöpler
gold-silver-copper deposit in Turkey.
The updated Çöpler resource estimate has resulted in Measured and
Indicated ("M+I") Resources increasing to 194.2 million tonnes at a grade of 1.4 grams per tonne ("g/t") gold,
containing a total of 8.5 million ounces (inclusive of reserves) as at June 30, 2013.
| Mineral Resource for the Çöpler Deposit (100%) as at June 30, 2013 |
Gold Cut-off Grade (g/t)
| Material Type | Resource Category | Tonnes (million) | Gold Grade (g/t) | Contained Gold (million ounces) | Silver Grade (g/t) | Copper Grade (%) | Sulfur Grade (%) |
| 0.3 | Oxide |
Measured
|
16.3
|
1.7
|
0.9
|
3.7
|
0.2
|
0.3
|
|
Indicated
|
36.5
|
0.8
|
1.0
|
1.4
|
0.1
|
0.2
|
| Measured + Indicated | 52.8 | 1.1 | 1.8 | 2.1 | 0.1 | 0.3 |
|
Inferred
|
25.7
|
0.6
|
0.5
|
1.4
|
0.1
|
0.4
|
| 0.8 | Sulfide |
Measured
|
74.0
|
1.6
|
3.8
|
4.6
|
0.1
|
3.9
|
|
Indicated
|
46.9
|
1.5
|
2.2
|
4.4
|
0.1
|
3.9
|
| Measured + Indicated | 120.9 | 1.5 | 6.0 | 4.5 | 0.1 | 3.9 |
|
Inferred
|
23.9
|
1.2
|
1.0
|
4.6
|
0.1
|
3.0
|
| Variable | Stockpiles |
Measured
|
20.4
|
1.0
|
0.7
|
|
|
|
| Variable | Total |
Measured
|
110.7
|
1.5
|
5.4
|
4.5
|
0.1
|
3.2
|
|
Indicated
|
83.4
|
1.2
|
3.2
|
3.1
|
0.1
|
2.3
|
| Measured + Indicated | 194.2 | 1.4 | 8.5 | 3.8 | 0.1 | 2.8 |
|
Inferred
|
49.6
|
0.9
|
1.4
|
3.0
|
0.1
|
1.7
|
Note: Resources are quoted after mining depletion and are inclusive of
reserves. Resources are shown on a 100% basis, of which Alacer Gold
owns 80%. Stockpiles include both oxide and sulfide stockpiles and
residual ore stacked on the Heap Leach stockpiles. Resource
methodology is summarised in the Technical Procedural Section of this
announcement. Rounding errors will occur.
Mr. David Quinlivan, President and CEO of Alacer Gold, stated: "I am pleased to report that the Measured and Indicated Resource at
Çöpler has increased for both oxide and sulfide mineralization since
our last resource statement in December 2012, more than replacing mine
production during the period. It is also significant that the new
resource model has under-estimated the ounces in the area mined to June
30, 2013 by 11%, identifying potential upside to this new resource
estimate. This resource update will form the basis of ongoing Çöpler
oxide and sulfide mine studies. We have recently increased our regional
exploration activities in the Çöpler District and are encouraged by the
quality of targets being generated".
This new resource is reported as at June 30, 2013 and includes mining
depletion to June 30, 2013 and new drilling assay results from August
1, 2012 up until May 31, 2013. Stockpiles include both oxide and
sulfide mineralization, and residual heap leach stockpiles and are
reported as at June 30, 2013.
Çöpler Mineral Resources Comparison
A comparison between the previous Çöpler Mineral Resource (December,
2012) and the new Çöpler Mineral Resource estimate is provided in the
table below. The comparison shows that the total M+I Resource has
increased by 0.3 million ounces or 4% in contained gold. Measured and
Indicated Resources have increased for both oxide and sulfide,
predominantly due to drilling results at Main Zone. These increases
have more than offset high grade mine production from the Manganese and
Marble pits during this same time period.
|
| Depleted Mineral Resource as at December 31, 2012 | Depleted Mineral Resource as at June 30, 2013 | % Difference |
Gold Cut-off Grade (g/t) | Material Type | Resource Category | Tonnes (million) | Gold Grade (g/t) | Contained Gold (million ounces) | Tonnes (million) | Gold Grade (g/t) | Contained Gold (million ounces) | Tonnes (million) | Gold Grade (g/t) | Contained Gold (million ounces) |
|
0.3
|
Oxide
|
Measured
|
15.0
|
2.0
|
1.0
|
16.3
|
1.7
|
0.9
|
8%
|
-20%
|
-14%
|
|
Indicated
|
35.5
|
0.8
|
0.9
|
36.5
|
0.8
|
1.0
|
3%
|
4%
|
8%
|
| Measured + Indicated | 50.5 | 1.1 | 1.8 | 52.8 | 1.1 | 1.8 | 4% | -1% | 3% |
|
Inferred
|
25.7
|
0.6
|
0.5
|
25.7
|
0.6
|
0.5
|
0%
|
-7%
|
-8%
|
|
0.8
|
Sulfide
|
Measured
|
64.4
|
1.7
|
3.6
|
74.0
|
1.6
|
3.8
|
13%
|
-6%
|
5%
|
|
Indicated
|
51.6
|
1.4
|
2.3
|
46.9
|
1.5
|
2.2
|
-10%
|
4%
|
-4%
|
| Measured + Indicated | 116.0 | 1.6 | 5.9 | 120.9 | 1.5 | 6.0 | 4% | -3% | 2% |
|
Inferred
|
25.7
|
1.3
|
1.1
|
23.9
|
1.2
|
1.0
|
-7%
|
-5%
|
-15%
|
|
Variable
|
Stockpiles
|
Measured
|
16.2
|
0.8
|
0.4
|
20.4
|
1.0
|
0.7
|
21%
|
20%
|
34%
|
|
Variable
|
Total
|
Measured
|
95.6
|
1.6
|
5.0
|
110.7
|
1.5
|
5.4
|
14%
|
-6%
|
7%
|
|
Indicated
|
87.1
|
1.1
|
3.2
|
83.4
|
1.2
|
3.2
|
-4%
|
7%
|
-1%
|
| Measured + Indicated | 182.8 | 1.4 | 8.2 | 194.2 | 1.4 | 8.5 | 6% | -2% | 4% |
|
Inferred
|
51.4
|
0.9
|
1.6
|
49.6
|
0.9
|
1.4
|
-4%
|
-1%
|
-13%
|
Notes: * The previous Mineral Resource estimate was released in Alacer
Gold's Annual Information Form, dated December 31, 2012, and published
March 28, 2013. Resources are inclusive of reserves. Stockpiles
include both oxide and sulfide stockpiles and residual ore stacked on
heap leach stockpiles. Rounding errors will occur.
For the area mined up until June 30, 2013, this new resource model
estimated 1,050,000 ounces of contained gold versus an estimated mine
production of 1,170,000 ounces of contained gold. This indicates that
the new resource model is under-estimating the gold contained in the
mined portion of the Çöpler deposit by 11%.
In addition to the potential upside in the resource estimate,
significant opportunity exists to further increase the Çöpler resource
with three drill rigs currently active on site.
Alacer Gold believes that the Çöpler Mine is likely to be the first of
several significant gold deposits to be discovered and mined in the
Çöpler District. The Çöpler District is Alacer Gold's highest priority
area for gold exploration and discovery. Alacer Gold has recently
increased its license holding in the Çöpler District, increased
regional geological, geochemical and geophysical survey activities, and
commenced the drilling of high priority oxide-gold targets within a
twenty kilometer radius of the Çöpler Deposit.
Çöpler Resource Estimation Methodology
Current Mineral Resource estimates are stated as at June 30, 2013 and
take account of mining depletion to that date. Resources are shown on a
100% basis, of which Alacer Gold owns 80%. All resource numbers quoted
in this announcement are reported inclusive of reserves.
Drillhole data used in the Çöpler resource was comprised of surface
reverse circulation ("RC") and surface diamond drillholes. The
majority of drillhole collar locations were surveyed by contract mine
surveyors. Diamond drillholes were routinely downhole surveyed using
Eastman single-shot and Reflex multi-shot cameras. Drillhole spacing
varies across the deposit, with the majority of the resource drilled at
40m x 40m spacing, however infill drilling has been completed down to
20m x 20m in the Manganese, Marble and a small portion of Main Zone.
Drill core and RC chips were logged in detail for lithology, alteration,
mineralization, structure and veining. All data is stored and
validated within an electronic database. Following logging, the
samples are submitted for assaying. Drill core is sawn in half and
sampled (or split into half core for clay ores); whereas RC chip
samples are routinely collected in calico bags at 1 m increments for
assay. Diamond core sample lengths were constrained by geology,
alteration, mineralization or structural boundaries and may vary in
different areas of the resource. The samples range in downhole lengths
from 0.1 m to 5.6 m, but typically 1.0 m to 2.0 m.
Gold analyses were undertaken by ALS-Chemex in Vancouver, Canada and
ALS-Chemex in Izmir, Turkey using a 30g Fire Assay analysis method.
Multi-element analyses of silver, copper and sulfur were undertaken by
four acid digestion via ICP-AES. Industry standard reference materials
and blanks were utilized in order to check laboratory assay quality
control. A laboratory visit and audit was undertaken in June 2012.
Detailed geological and mineralization wire-frames have been built
utilizing data collected during the logging of drillholes in the
resource area. Surface mapping and pit mapping collected from within
the Manganese Pit have been integrated into the geological wireframes.
A total of 56 mineralization domains have been defined for the resource
estimate, with 9% of ounces in the resource estimate outside of these
domains.
Assays were composited to 3 meter intervals and assessed for appropriate
top-cuts by area. The top-cuts applied to each element by area are
detailed in the table below.
| Area | Au (g/t) | Ag (g/t) | Mn (ppm) | Cu (ppm) | As (ppm) |
|
Manganese
|
20
|
90
|
100,000
|
11,000
|
10,000
|
|
Marble
|
35
|
90
|
13,000
|
13,000
|
10,000
|
|
Main Zone East
|
10
|
15
|
11,000
|
7,000
|
10,000
|
|
Main Zone South
|
6
|
7
|
4,000
|
11,000
|
6,000
|
|
Main Zone
|
18
|
90
|
45,000
|
16,000
|
10,000
|
|
Main Zone West
|
3
|
10
|
6,000
|
10,000
|
2,000
|
|
West Zone
|
6
|
13
|
4,000
|
7,000
|
1,600
|
A detailed review of 3,104 bulk density measurements collected from
diamond drillholes within the resource area has identified the presence
of surficial weathering within several of the rock types. The bulk
densities utilized within the resource are detailed in the table below.
| Rock Type | Vertical Depth Extent (m) | Number of Samples | Mean Bulk Density (g/cm3) |
|
Diorite_1
|
0 - 20
|
57
| 2.26 |
|
Diorite_2
|
20 - 40
|
71
| 2.39 |
|
Diorite_3
|
40 - 60
|
63
| 2.42 |
|
Diorite_4
|
60+
|
754
| 2.57 |
|
Gossan
|
all
|
64
| 2.54 |
|
Marble
|
all
|
581
| 2.60 |
|
Massive sulfide
|
all
|
28
| 3.14 |
|
Metasediments_1
|
0 - 20
|
27
| 2.38 |
|
Metasediments_2
|
20 - 40
|
79
| 2.42 |
|
Metasediments_3
|
40 - 60
|
91
| 2.51 |
|
Metasediments_4
|
60+
|
1,286
| 2.64 |
|
Manganese rich
|
all
|
3
| 3.00 |
Ordinary Kriging was the grade estimation method used to estimate the
Çöpler resource. Parent block sizes were set at 10 m (X), 10 m (Y) and
5 m (Z) in the Manganese and Marble Zones of the resource, where
drilling is closer spaced; whereas the parent block sizes in all other
areas were set at 20 m (X), 20 m (Y) and 5 m (Z). The minimum
sub-block size was set to 2.5 m (X), 2.5 m (Y) and 2.5 m (Z) in all
areas.
A nominal cut-off grade of 0.3 g/t gold was applied to the oxide portion
of the resource and 0.8 g/t gold to the sulfide portion of the resource
to reflect likely mining and processing scenarios. The resource
estimate has been classified based on data density, data quality,
confidence in the geological interpretation and grade continuity, and
the confidence in the estimation. The resource has been reported prior
to any recovery factors.
The major difference between the previous resource (September 10, 2012)
and this resource is that the Main Zone was unwrinkled in Vulcan 8.2
using an alternate Z (or RL) calculation, enabling the estimation of
the dome as a whole.
The stockpiled material quoted in the resource is comprised of an oxide
stockpile of 20,000t at 7.2g/t gold, a sulfide stockpile of 800,000t at
4.7g/t gold and the heap leach stockpile of 19,600,000t at 0.87g/t
gold. The oxide and sulfide stockpile tonnes are determined by
weightometer, verified by monthly survey pickups, and the stockpiled
grade determined by grade control practices. The heap leach stockpile
represents the stacked heap leach ore with a portion of the ounces
stacked on the heap remaining to be recovered. It is estimated that
approximately 23% of the gold on the heap leach stockpile as at June
30, 2013 will be recovered via continued heap leaching, for a total of
126,000 ounces of gold.
About Alacer Gold
Alacer Gold is a leading mid-tier gold producer with mines and
processing facilities in Turkey and Australia:
-
80% interest in the Çöpler Gold Mine;
-
100% interest in the Higginsville Gold Operations; and
-
100% interest in the South Kalgoorlie Gold Operations.
Alacer Gold's primary focus is to maximize portfolio value, maximize
free cash flow, minimize project risk, and returning value to
shareholders. Alacer Gold is committed to responsibly developing its
current operations and focused exploration programs creating value. On
June 12, 2013, Alacer Gold announced that it had initiated a process to
pursue a sale of its Australian assets.
Qualified Persons
The information in this report which relates to Mineral Resources is
based on information prepared by Lisa Bascombe, a full-time employee of
Alacer Gold and a Member of the Australian Institute of Geoscientists.
The information in this report which relates to Mineral Resources has
been reviewed by Chris Newman, a full-time employee of Alacer Gold, who
is a Member of the Australasian Institute of Mining and Metallurgy and
a Member of the Australian Institute of Geoscientists.
Ms Bascombe and Mr Newman have sufficient experience which is relevant
to the style of mineralization and type of deposit under consideration
and to the activity which is being undertaken to qualify as a Competent
Person as defined in the 2004 Edition of the "Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves"
and a qualified person pursuant to National Instrument 43-101 of the
Canadian Securities Administrators. Ms Bascombe and Mr Newman consent
to the inclusion in this release of the matters based on this
information in the form and context in which it appears.
Cautionary Statements
Certain statements contained in this news release constitute
forward-looking information, future oriented financial information, or
financial outlooks (collectively "forward-looking information") within
the meaning of Canadian securities laws. Forward-looking information
may relate to this news release and other matters identified in Alacer
Gold's public filings, Alacer Gold's future outlook and anticipated
events or results and, in some cases, can be identified by terminology
such as "may", "will", "could", "should", "expect", "plan",
"anticipate", "believe", "intend", "estimate", "forecast", "projects",
"predict", "potential", "continue" or other similar expressions
concerning matters that are not historical facts and include, but are
not limited in any manner to, those with respect to proposed
exploration, communications with local stakeholders and community
relations, status of negotiations of joint ventures, commodity prices,
mineral resources, mineral reserves, realization of mineral reserves,
existence or realization of mineral resource estimates, the timing and
amount of future production, timing of studies and analysis, the timing
of construction of proposed mines and process facilities, capital and
operating expenditures, economic conditions, availability of sufficient
financing, exploration plans and any and all other timing, exploration,
development, operational, production, financial, economic, legal,
social, regulatory and, political factors that may influence, or be
influenced by, future events or conditions. Such forward-looking
statements are based on a number of material factors and assumptions,
including, but not limited in any manner, those disclosed in any other
Alacer filings, and include exploration results and the ability to
explore, the ultimate determination of mineral reserves, availability
and final receipt of required approvals, titles, licenses and permits,
sufficient working capital to develop and operate the mines, access to
adequate services and supplies, commodity prices, ability to meet
production targets, foreign currency exchange rates, interest rates,
access to capital markets and associated cost of funds, availability of
a qualified work force, ability to negotiate, finalize and execute
relevant agreements, lack of social opposition to the mines, lack of
legal challenges with respect to any the property or the Corporation
and the ultimate ability to mine, process and sell mineral products on
economically favourable terms. While we consider these assumptions to
be reasonable based on information currently available to us, they may
prove to be incorrect. Actual results may vary from such
forward-looking information for a variety of reasons, including but not
limited to risks and uncertainties disclosed in other Alacer Gold
filings at www.sedar.com and other unforeseen events or circumstances.
Other than as required by law, Alacer Gold does not intend, and
undertakes no obligation to update any forward-looking information to
reflect, among other things, new information or future events.

Image with caption: "The graph above provides grade-tonnage curves for oxide and sulfide M+I Resources at various cut-off grades. (CNW Group/Alacer Gold Corp.)". Image available at: http://photos.newswire.ca/images/download/20130725_C9564_PHOTO_EN_29254.jpg
Image with caption: "The graph above provides grade-tonnage curves for oxide and sulfide M+I Resources at various cut-off grades. (CNW Group/Alacer Gold Corp.)". Image available at: http://photos.newswire.ca/images/download/20130725_C9564_PHOTO_EN_29255.jpg
SOURCE: Alacer Gold Corp.

<p> <b>on Alacer Gold, please contact:</b> </p> <p> Lisa Maestas - North America at +1-303-292-1299<br/> Roger Howe - Australia at +61-2-9953-2470<br/> Candice Sgroi - Director of External Relations at +61-419-705-986/+1-303-681-5365 </p>