17:11:15 EST Tue 24 Nov 2026
Enter Symbol
or Name
USA
CA



Ares Strategic Mining Inc
Symbol ARS
Shares Issued 292,394,478
Close 2026-11-24 C$ 0.16
Market Cap C$ 46,783,116
Recent Sedar+ Documents

Ares expands Spor Mountain fluorspar claims to 371

2026-11-24 16:20 ET - News Release

Mr. James Walker reports

ARES STRATEGIC MINING EXPANDS SPOR MOUNTAIN FLUORSPAR CLAIM PORTFOLIO TO 371 CLAIMS

Ares Strategic Mining Inc. has provided an update and expansion of its mineral claim portfolio at the Spor Mountain fluorspar project in Juab county, Utah, as the company prepares its updated technical report in connection with its planned Nasdaq uplist.

The increased mineral-title inventory identifies 371 unpatented lode mining claims held of record by the company's Utah subsidiary. This represents an increase of 69 claims, or approximately 23 per cent, compared with the 302 claims in Ares's June, 2026, annual disclosure. The current inventory includes 68 LSM claims located in September, 2026.

Building a larger exploration platform around Lost Sheep

Spor Mountain has a long history of fluorspar exploration and mining. Ares's expanded claim inventory strengthens its district-scale exploration platform around the Lost Sheep operation, providing additional areas for geological review, targeting and future work, subject to confirmation of claim validity and required authorizations. The project lies approximately 45 miles northwest of Delta, Utah.

"We are building more than a single mine. We are developing a long-term domestic fluorspar platform, and our land position is a central part of that strategy. With 371 claims now reflected in our updated inventory, we have a broader framework for assessing the district's opportunities, advancing priority targets and planning responsible future development alongside our existing mining and processing operations."

- James Walker, president and chief executive officer

Mapping provides a more realistic measure of surface footprint

Without accounting for overlaps, the 371 claims would total approximately 7,665 acres of nominal claim area. After accounting for visibly overlapping claim outlines, Ares estimates a preliminary mapped footprint of 6,500 to 6,600 acres (2,630 to 2,670 hectares; 26.3 to 26.7 square kilometres).

Exploration opportunity in a historic fluorspar district

The company has assembled updated georeferenced maps showing its claim inventory alongside published historical mines, prospects and mineral occurrences throughout the wider Spor Mountain district. The maps identify established district names including Lost Sheep, Fluorine Queen, Floride, Bell Hill and other historic sites, providing context for geological targeting. Some published sites lie outside Ares' claims; mapped occurrences are not evidence of ownership, defined mineral resources or mineral reserves.

Strategic importance of domestic fluorspar

Fluorspar remains on the U.S. government's 2025 Critical Minerals List. According to the U.S. Geological Survey's Mineral Commodity Summaries 2026, significant U.S. fluorspar mine production had not been reported since 1995 and the country was 100-per-cent net import reliant in 2025, excluding sales of stockpiled material. Fluorspar serves steelmaking, aluminum processing, chemical manufacturing, and the production of fluorine-based materials used in semiconductors and other industrial applications.

Ares believes its growing district-level exploration platform complements the Lost Sheep mine and the company's processing operations in Delta. The updated claim inventory provides a broader basis for systematic evaluation of prospective ground as Ares advances its mineral-processing activities and prepares future exploration programs.

About Ares Strategic Mining Inc.

Ares Strategic Mining is a mining company focused on the development of its fluorspar projects in the United States. The company aims to become a significant supplier of high-grade fluorspar to North American markets, supporting industries vital to modern technology and infrastructure.

Lost Sheep fluorspar project -- Delta, Utah

  • Approximately 6,600 acres -- 371 claims;
  • Located in the Spor Mountain area, Juab county, Utah, approximately 214 kilometres southwest of Salt Lake City;
  • Fully permitted, including mining permits;
  • National Instrument 43-101 technical report identified extensive high-grade fluorspar with low levels of impurities;
  • Mining plan approved by the Bureau of Land Management (BLM).

The mining plan was first approved by Rex Rowley, area manager, Bureau of Land Management, on Aug. 24, 1992, and renewed by Paul B. Baker, minerals program manager, Bureau of Land Management, on Dec. 12, 2016.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.