05:31:26 EDT Thu 02 May 2024
Enter Symbol
or Name
USA
CA



American Manganese Inc
Symbol AMY
Shares Issued 111,492,547
Close 2014-08-18 C$ 0.03
Market Cap C$ 3,344,776
Recent Sedar Documents

ORIGINAL: American Manganese says Artillery spill risk minimized

2014-08-19 07:39 ET - News Release

Received by email:

File: AMY  Press Release Aug 13 - Final.docx

American Manganese's Extraction Process Facilitates More Environmentally Friendly Tailing Storage
August 19, 2014 - Vancouver, BC
Larry W. Reaugh, President and Chief Executive Officer of American Manganese Inc. ("American Manganese" or the "Compan
--->y"), (TSX.V:  AMY; Pink Sheets:  AMYZF; Frankfurt:  2AM), is pleased to respond to inquiries regarding process tailing
---> storage from the Company's proposed manganese recovery process at Artillery Peak situated in northwestern Arizona. "T
--->he waste management approach we have taken for the Artillery Peak Project minimizes the potential for the uncontrolled
---> release of contaminants into the environment during all of the project stages, as well as minimizing the demand for f
--->resh water for mineral processing," says Mr. Reaugh.  "Minimizing the environmental foot print of the proposed project
---> makes good sense."   
The company's patented manganese recovery process is a technical break-through as it enables the recovery of manganese
---> from a low grade resource with significantly less energy and environmental impact than conventional processing method
--->s.  The U.S. Bureau of Mines (USBM) developed the frame work of the process from the 1940's to 1980 but was never able
---> to make it economically viable.  Kemetco Research Inc. successfully completed the process to demonstrate it can compe
--->te with other electrolytic manganese metal (EMM), electrolytic manganese dioxide (EMD), and chemical manganese dioxide
---> (CMD) producers in the lower cost percentile.  High purity manganese dioxide is combined with lithium carbonate to fo
--->rm the cathode material used in the "spinel" type high tech lithium ion rechargeable battery.
The hydrometallurgical process developed by the Company is capable of producing high purity electrolytic manganese dio
--->xide (EMD) and chemical manganese dioxide (CMD) critical for improving performance and safety of high tech lithium ion
---> batteries.  The process tailing is subjected to 8 stages of counter current washing prior to high pressure filtration
---> that yield a benign filter cake and re-usable process water.  The moisture content of the filter cake is expected to 
--->be in the order of 30%, which makes it suitable for dry stacking and co-disposal with waste rock from the proposed ope
--->n pit mine.  The proposed open pit mine was designed and scheduled so as to provide on-going and final storage of the 
--->waste rock and process tailings within limits of the excavation.  
Water coming in contact with the combined waste residue or within the excavation would be collected and used in the hy
--->drometallurgical treatment process.  Uncontaminated surface water would be diverted around the proposed mine workings 
--->and treatment facilities and discharged into the existing water courses.
About American Manganese Inc.
American Manganese Inc. is a diversified specialty and critical metal Company focusing on potentially becoming the low
--->est cost producer of electrolytic manganese products from its Arizona Manganese Project.


About Kemetco Research Inc.
Kemetco Research Inc. is a privately owned contract research and development company specializing in extractive metall
--->urgy, chemical processing and specialty chemical analysis.  It was formed after the acquisition of the industrial proc
--->ess division of B.C. Research; which had been in operation for over 60 years as a research and development contractor 
--->in British Columbia.
This release has been reviewed by Michael MacLeod, P. Eng., a qualified person pursuant to National Instrument 43-101.
On behalf of Management
AMERICAN MANGANESE INC.
Larry W. Reaugh President and Chief Executive Officer
Information Contacts:
Larry W. Reaugh President and Chief Executive Officer 604-531-9639 
Email: lreaugh@amymn.com
www.americanmanganeseinc.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the 
--->TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may conta
--->in "forward-looking statements", which are statements about the future based on current expectations or beliefs. For t
--->his purpose, statements of historical fact may be deemed to be forward-looking statements. Forward-looking statements 
--->by their nature involve risks and uncertainties, and there can be no assurance that such statements will prove to be a
--->ccurate or true. Investors should not place undue reliance on forward-looking statements. The Company does not underta
--->ke any obligation to update forward-looking statements except as required by law.




© 2024 Canjex Publishing Ltd. All rights reserved.