12:38:27 EDT Wed 24 Jun 2026
Enter Symbol
or Name
USA
CA



Alpha Exploration Ltd.
Symbol ALEX
Shares Issued 107,760,731
Close 2026-06-22 C$ 0.50
Market Cap C$ 53,880,366
Recent Sedar+ Documents

ORIGINAL: Alpha Further Expands Footprint of Anagulu Copper-Gold Porphyry Prospect and Discovers New Nightjar Target Zone Measuring 1 x 0.15km

2026-06-24 07:01 ET - News Release

Calgary, Alberta--(Newsfile Corp. - June 24, 2026) - Alpha Exploration Ltd. (TSXV: ALEX) ("Alpha" or the "Company") is pleased to announce recently available sampling results from shallow Rotary Air Blast ("RAB") drilling at the Anagulu Copper-Gold Porphyry Project. To date results are now available for a total of 4,738 metres of an ongoing RAB drilling program being conducted to follow up from initial termite mound sampling copper anomalies. The reconnaissance RAB drilling program is designed to expand and define the target footprint of the Anagulu Copper-Gold Porphyry where it is concealed under immature soil cover. This new batch of results reported here relate to 2,609 metres in 335 holes with an average depth of 7.8 metres in the ongoing program.

This project is located within its 100% owned, 514km² Kerkasha Project located in Eritrea. The Anagulu copper-gold porphyry was discovered by the Alpha team through surface sampling and mapping with follow-up drilling. Previously reported drilled intercepts include 108 metres @ 1.24 g/t gold and 0.60% copper including 49 metres @ 2.42 g/t gold and 1.10% copper, and 120 metres @ 0.47 g/t gold and 0.30 % copper in drill holes AND001 and ANRD049 respectively. The project is located some 7 kilometres south of the Company's shallow, Aburna Gold Project and these projects are two of three significant discoveries made by the Alpha team on the Kerkasha licence.

HIGHLIGHTS OF ONGOING ANAGULU COPPER-GOLD PORPHYRY RECONNAISSANCE RAB DRILLING

  • Shallow RAB drilling delivers new Nightjar Target Zone measuring some 1 kilometre along trend and 125-150 metres in width with top of bedrock copper samples ranging from 3,390 parts per million (ppm) (0.33%) to 310 ppm copper
  • Nightjar Target Zone is located some 2 kilometres northeast from the main area of drilled porphyry copper-gold mineralization, is located near a magmatic-hydrothermal breccia, and could represent a second intrusive porphyry centre
  • Camel Target Zone expanded and defined to over 1 kilometre along trend and 125-250 metres width with top of bedrock copper samples in RAB Area 5, ranging from 3,274 ppm (0.33%) to 300 ppm copper
  • The width and grade of the Camel Target increases to the southwest and overall appears to have higher copper values than the comparable Discovery target zone based on the RAB sample results
  • Camel Target remains open to the southwest where RAB drilling is ongoing in an area with anomalous termite mound sampling results

John Wilton, CEO of Alpha, stated: "We are very pleased with this second batch of shallow RAB drilling copper results from the ongoing exploration field activities at our Anagulu Porphyry Copper-Gold Prospect. These results have delivered the new Nightjar target zone located some 2 kilometres northeast of Alpha's original Anagulu discovery area and expanded the Camel target zone to over 1 kilometre along trend. In general, both the width and grade of the Camel target increases towards the southwest, and these top of bedrock copper values exceed those of the comparable Discovery target zone.

These new and expanded target zones have significant scale footprints of over 1 kilometre along trend and some 125 to 250 metres in near surface widths. Importantly the Camel and Nightjar target zones were concealed under areas of shallow but immature soil cover, precluding them from conventional soil sampling detection. These new copper-gold target zones further indicate the large size footprint and shallow depth potential of the Anagulu Porphyry Copper-Gold Prospect. These zones will be tested by follow up reverse circulation and core drilling."

ANAGULU COPPER GOLD PROJECT: RAB SAMPLING RESULTS

Alpha's ongoing RAB drilling program at the Anagulu Project has to date completed 595 holes for 4,738 metres with an average depth of approximately 7.96 metres per hole. This shallow RAB drilling program is deployed as a rapid and cost-effective reconnaissance exploration method to initially test and define copper anomalies generated by termite mound sampling in areas of predominantly immature, transported soil cover. The RAB holes provide valuable top of bedrock and weathered bedrock geological and geochemical information. Representative material from the deepest two, one-metre, samples of each RAB drill hole are analysed by pXRF with the peak copper value, one metre sample reported, and as this shallow drilling method is intended to identify and define near-surface copper anomalies its relationship to the targets true thickness is unknown at this time (see QA/QC section for more details).

Figure 1 shows the location and outline of the Nightjar, Camel and other recently identified RAB target zones based on an approximately greater than 400 ppm copper contour. The significantly expanded target footprint of the porphyry copper-gold mineralization is clearly illustrated within and to the boundaries of an overall 4 by 2-kilometre prospective area that had already been defined by the Alpha team by drilling and recognised from copper in soil data to extend for some 2 by 0.5 kilometres.

The new Nightjar target is located some 2-kilomteres northeast of the previously discovered copper-gold mineralization. This Nightjar target alone extends over 1 kilometre along a north-north-east trend, has an approximate near-surface width of some 125 to 150 metres and occurs in an area of mapped magmatic-hydrothermal breccia. The top of bedrock RAB sample results within the interpreted target zone range from 3,390 ppm copper (0.33% copper) to 310 ppm copper.

The location of the Nightjar target, its appreciable size and proximity to magmatic-hydrothermal breccia mapped in outcrop suggests that it could represent a second fertile porphyry centre recognised, to date, on the property.

Figure 1 also shows how the recent Area 5 RAB results have expanded and defined the Camel target zone to over 1 kilometre along its southwest to northeast trend. The Camel target has a near-surface width of some 125 metres in the northeast, expanding to approximately 250 metres in the southwest where it currently remains open into an area of anomalous copper samples in termite mounds.

It is also apparent that the overall copper tenor of the Camel target increases towards the southwest. Within the Camel target, RAB sample values from the top of bedrock range from 3,274 ppm copper (0.32% copper) to 300 ppm copper.

In addition, these recent results from the Area 5 RAB drilling have outlined a zone of anomalous copper values southwest of Alpha's historical Anagulu discovery for some 500 metres in an area of only limited RC and core drilling. This newly defined Discovery zone target from the RAB drilling has a width of up to 250 metres, with top of bedrock copper values ranging from 1,406 ppm to 300 ppm copper. This new data will be integrated into Alpha's surface mapping and drilling database to determine if this target motivates more drill testing of the mapped quartz-eye diorite unit known to host most of the currently known copper-gold mineralization at Anagulu.

Figure 2 illustrates how the Camel target zone has been generated to date by the RAB program to over more than 1 kilometre, with in general, increasing near-surface, width and copper grade towards the southwest. It is also importantly noted that the Camel target zone appears to have an overall higher copper grade than the comparable RAB drilled area of the Discovery target zone (see Figure 1).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8361/302659_7d370071e4743889_002.jpg

Figure 1: Map Showing New and Expanded RAB Drilling Target Zones, Termite Mound Sampling Results, with Previous Reported Selected Drilling Results.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8361/302659_7d370071e4743889_002full.jpg

Figure 1 notes: RAB drill sampling results reported are from representative material from the deepest two, one-metre, samples of each RAB drill hole which are analysed by pXRF with the peak copper value, one metre sample reported, and as this drilling method is intended to identify and define near-surface copper anomalies its relationship to the targets true thickness is unknown at this time. Previously reported results in Alpha Exploration news releases; Alpha Expands the Footprint of the Anagulu Copper-Gold Porphyry and New Camel Target Zone Measures at Least 1 x 0.25km, April, 2026, Alpha Exploration announces final 2024 drilling results at Aburna Gold and Anagulu Gold Copper prospects and updates exploration plans for 2025, March 21st 2025., Alpha Exploration Reports 95m of 1.30 g/t AuEq from Anagulu Porphyry Gold-Copper Prospect, Kerkasha Project Eritrea, December 9, 2021, and NI 43-101 Technical Report for the Kerkasha Project, Eritrea, RSC Mining & Mineral Exploration, 21 June 2021.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8361/302659_7d370071e4743889_003.jpg

Figure 2: Composite Cross Section View Looking Northeast Through lines SS-23, SS-40 and SS-45 Showing Expanded and Defined Camel Target in Context of Previously Reported Drill Hole Results.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8361/302659_7d370071e4743889_003full.jpg

Figure 2 notes: RAB drill sampling results reported are from representative material from the deepest two, one-metre, samples of each RAB drill hole which are analysed by pXRF with the peak copper value, one metre sample reported, and as this drilling method is intended to identify and define near-surface copper anomalies its relationship to the targets true thickness is unknown at this time. Previously reported results in Alpha Exploration news releases; Previously reported results in Alpha Exploration news releases; Alpha Expands the Footprint of the Anagulu Copper-Gold Porphyry and New Camel Target Zone Measures at Least 1 x 0.25km, April, 2026, Alpha Expands Anagulu Porphyry Mineralisation with Drill Intercept of 120 metres grading 0.30% Copper and 0.47 g/t Gold, February 24, 2026, Alpha Exploration announces final 2024 drilling results at Aburna Gold and Anagulu Gold Copper prospects and updates exploration plans for 2025, March 21st 2025., Alpha Exploration Reports 95m of 1.30 g/t AuEq from Anagulu Porphyry Gold-Copper Prospect, Kerkasha Project Eritrea, December 9, 2021, and NI 43-101 Technical Report for the Kerkasha Project, Eritrea, RSC Mining & Mineral Exploration, 21 June 2021.

Table 1: Selected RAB Drilling Sample Results Area 3

Area 3 RAB Hole IdDepth From
(m)
Depth To
(m)
Sample
Id
Cu ppm
pXRF

Area 3 RAB Hole IdDepth From
(m)
Depth To
(m)
Sample
Id
Cu ppm
pXRF
ANRBA3-R17-0079108026943390
ANRBA3-R02-0031213802677600
ANRBA3-R08-0059108024511595
ANRBA3-R13-00467802397589
ANRBA3-R08-003238024491373
ANRBA3-R07-00289802578578
ANRBA3-R13-003348023981372
ANRBA3-R13-00456802396556
ANRBA3-R08-005898024501138
ANRBA3-R09-00312802438555
ANRBA3-R12-004238024011119
ANRBA3-R12-006910802405532
ANRBA3-R15-003568023781119
ANRBA3-R13-00345802399507
ANRBA3-R16-006788027021041
ANRBA3-R11-00523802423504
ANRBA3-R18-007910802690981
ANRBA3-R07-002910802579503
ANRBA3-R16-00689802703972
ANRBA3-R15-00234802380497
ANRBA3-R08-00312802448931
ANRBA3-R11-00656802421492
ANRBA3-R10-00534802424912
ANRBA3-R12-00534802402477
ANRBA3-R05-0051415802617872
ANRBA3-R07-00389802581473
ANRBA3-R15-00245802381847
ANRBA3-R16-00156802367458
ANRBA3-R15-00367802379821
ANRBA3-R18-00667802688457
ANRBA3-R10-00545802425792
ANRBA3-R05-0031112802620448
ANRBA3-R18-00678802689780
ANRBA3-R16-00145802366440
ANRBA3-R18-0071011802691778
ANRBA3-R10-00689802427438
ANRBA3-R12-00689802404766
ANRBA3-R04-001910802637435
ANRBA3-R17-00645802697729
ANRBA3-R11-00512802422428
ANRBA3-R05-0051314802616690
ANRBA3-R05-0031213802621422
ANRBA3-R09-00323802439689
ANRBA3-R07-00456802583403
ANRBA3-R12-00412802400687
ANRBA3-R10-00678802426402
ANRBA3-R17-00634802696640





 

Table 2: Selected RAB Drilling Sample Results Area 5

Area 5 RAB
Hole Id
Depth From(m)Depth To(m)Sample IdCu ppm pXRF
Area 5 RAB
Hole Id
Depth From(m)Depth To(m)Sample IdCu ppm pXRF
ANRBA5-R10-009788029013274
ANRBA5-R05-00134802764714
ANRBA5-R12-010788029592725
ANRBA5-R12-0111011802961701
ANRBA5-R12-010678029582492
ANRBA5-R14-00656803005693
ANRBA5-R14-007568030072228
ANRBA5-R11-00856802925689
ANRBA5-R04-010568027312194
ANRBA5-R12-00878802954689
ANRBA5-R04-010458027302035
ANRBA5-R12-01345802967680
ANRBA5-R10-010678029022007
ANRBA5-R11-00123802939672
ANRBA5-R05-001458027651927
ANRBA5-R14-00645803004671
ANRBA5-R10-011678029041710
ANRBA5-R12-00223802941669
ANRBA5-R10-009678029001660
ANRBA5-R08-00134802824666
ANRBA5-R14-007458030061560
ANRBA5-R12-00645802950665
ANRBA5-R11-002128029361538
ANRBA5-R04-00245802712647
ANRBA5-R05-009678027481522
ANRBA5-R07-01189802803643
ANRBA5-R09-0119108028601446
ANRBA5-R11-00223802937634
ANRBA5-R03-001458027061406
ANRBA5-R13-00767802978634
ANRBA5-R06-010678027861399
ANRBA5-R09-00878802867633
ANRBA5-R10-010788029031394
ANRBA5-R11-00778802926619
ANRBA5-R07-010678028041379
ANRBA5-R12-00212802940605
ANRBA5-R05-009788027491347
ANRBA5-R12-00345802945603
ANRBA5-R05-002898027631344
ANRBA5-R12-00334802944601
ANRBA5-R11-010788029191324
ANRBA5-R11-00656802929597
ANRBA5-R13-008788029771265
ANRBA5-R05-00778802753594
ANRBA5-R05-002788027621233
ANRBA5-R09-00112802882594
ANRBA5-R08-010788028451210
ANRBA5-R14-00545803002587
ANRBA5-R08-010678028441206
ANRBA5-R07-01178802802584
ANRBA5-R14-001128029941199
ANRBA5-R02-00223802705580
ANRBA5-R06-010788027871160
ANRBA5-R09-00323802878570
ANRBA5-R12-007678029521147
ANRBA5-R04-00356802715559
ANRBA5-R13-008678029761147
ANRBA5-R04-00134802710551
ANRBA5-R14-001238029951135
ANRBA5-R04-00256802713547
ANRBA5-R09-010788028631120
ANRBA5-R03-00267802708546
ANRBA5-R09-01110118028611054
ANRBA5-R11-00789802927540
ANRBA5-R09-010678028621033
ANRBA5-R02-00212802704539
ANRBA5-R07-010788028051025
ANRBA5-R06-00145802769537
ANRBA5-R09-009678028641020
ANRBA5-R12-01334802966534
ANRBA5-R13-002128029901017
ANRBA5-R04-00145802711532
ANRBA5-R11-010678029181011
ANRBA5-R14-00234802996529
ANRBA5-R12-00945802956986
ANRBA5-R07-00878802809513
ANRBA5-R12-00956802957938
ANRBA5-R11-00645802928508
ANRBA5-R14-00867803010937
ANRBA5-R04-00489802717507
ANRBA5-R13-00645802981921
ANRBA5-R13-00545802983504
ANRBA5-R03-00156802707892
ANRBA5-R06-00134802768500
ANRBA5-R10-01178802905890
ANRBA5-R08-00645802836484
ANRBA5-R07-00956802807886
ANRBA5-R07-00445802818471
ANRBA5-R09-00867802866885
ANRBA5-R11-00945802922471
ANRBA5-R09-00978802865884
ANRBA5-R09-00123802883469
ANRBA5-R10-00245802885877
ANRBA5-R10-00845802896469
ANRBA5-R14-00878803011873
ANRBA5-R03-00278802709466
ANRBA5-R08-00145802825869
ANRBA5-R08-00345802828466
ANRBA5-R14-00556803003848
ANRBA5-R12-00656802951465
ANRBA5-R14-00989803013843
ANRBA5-R07-00867802808464
ANRBA5-R07-00945802806841
ANRBA5-R04-00345802714457
ANRBA5-R13-00112802992841
ANRBA5-R07-00456802819456
ANRBA5-R06-00778802781823
ANRBA5-R09-00245802881452
ANRBA5-R07-00245802823821
ANRBA5-R06-00456802775451
ANRBA5-R12-011910802960815
ANRBA5-R13-00978802975450
ANRBA5-R13-00123802993814
ANRBA5-R08-00656802837448
ANRBA5-R13-00634802980810
ANRBA5-R05-01089802747446
ANRBA5-R12-00778802953789
ANRBA5-R14-00312802998446
ANRBA5-R08-00945802842787
ANRBA5-R13-00223802991438
ANRBA5-R13-00778802979780
ANRBA5-R11-00956802923436
ANRBA5-R12-00889802955776
ANRBA5-R06-00545802776432
ANRBA5-R10-00223802884765
ANRBA5-R07-00578802817428
ANRBA5-R05-01167802742746
ANRBA5-R11-00112802938424
ANRBA5-R13-00312802988745
ANRBA5-R05-00434802758422
ANRBA5-R07-00234802822726
ANRBA5-R13-00967802974417
ANRBA5-R08-00956802843723
ANRBA5-R05-01178802743415
ANRBA5-R14-00978803012718
ANRBA5-R08-00356802829410
ANRBA5-R05-00767802752717
ANRBA5-R07-00567802816405

 

QUALITY ASSURANCE AND QUALITY CONTROL

The RAB drilling and related results were managed by Alpha Exploration's field team with the field operations conducted in-line with the standard operating procedures implemented at this project. Representative material of bedrock and weathered bedrock for the deepest two, one-metre, samples of each RAB drill hole, were screened to provide approximately 200 grams ("g") of minus 75-micron material. Termite mound samples are collected and processed in-line with the standard operating procedures implemented at this project. Four sub-samples of each mound are sampled collecting approximately a 2kg sample. This sample is gently pulverized to break up any soil clods and sieved to -75um to obtain a uniform representative sample. For the RAB and termite mound samples an aliquot is collected using a scoop and a sub-sample analysed with QA/QC samples inserted every 25th field sample analysed by Portable X-ray Fluorescence ("pXRF") within the Company's field laboratory in Asmara, Eritrea. The pXRF is routinely monitored by the QA/QC sample results to check its calibration. The pXRF instrument used is an Olympus Vanta M-series VMR with a 50Kv, 0.2mA tube.

Table 3: RAB Drillhole ID, Azimuth, Dip, End of Hole Depth, Collar Coordinates

Hole IdAzimuthHole DipEOHX_UTM_37NY_UTM_37NElevation
ANRBA3-R17-0070-90103428311647335885
ANRBA3-R08-0050-90103427311646884885
ANRBA3-R08-0030-9033426311646885888
ANRBA3-R13-0030-9043427811647134876
ANRBA3-R08-0050-9093427311646884885
ANRBA3-R12-0040-9033427311647085878
ANRBA3-R15-0030-9063428811647234876
ANRBA3-R16-0060-9083427811647285885
ANRBA3-R18-0070-90103428311647385880
ANRBA3-R16-0060-9093427811647285885
ANRBA3-R08-0030-9023426311646885888
ANRBA3-R10-0050-9043427301646985881
ANRBA3-R05-0050-90153427311646734881
ANRBA3-R15-0020-9053428311647234878
ANRBA3-R15-0030-9073428811647234876
ANRBA3-R10-0050-9053427301646985881
ANRBA3-R18-0060-9083427811647385880
ANRBA3-R18-0070-90113428311647385881
ANRBA3-R12-0060-9093428311647085880
ANRBA3-R17-0060-9053427811647335884
ANRBA3-R05-0050-90143427311646734881
ANRBA3-R09-0030-9033426311646934882
ANRBA3-R12-0040-9023427311647085878
ANRBA3-R17-0060-9043427811647335884
ANRBA3-R02-0030-90133426311646585883
ANRBA3-R13-0040-9073428311647135874
ANRBA3-R07-0020-9093425811646835889
ANRBA3-R13-0040-9063428311647135874
ANRBA3-R09-0030-9023426311646934882
ANRBA3-R12-0060-90103428311647085881
ANRBA3-R13-0030-9053427811647134876
ANRBA3-R11-0050-9033427311647035880
ANRBA3-R07-0020-90103425811646835889
ANRBA3-R15-0020-9043428311647234878
ANRBA3-R11-0060-9063427811647034890
ANRBA3-R12-0050-9043427801647085884
ANRBA3-R07-0030-9093426311646834888
ANRBA3-R16-0010-9063428311647284887
ANRBA3-R18-0060-9073427811647385880
ANRBA3-R05-0030-90123426311646735880
ANRBA3-R16-0010-9053428311647284887
ANRBA3-R10-0060-9093427811646985881
ANRBA3-R04-0010-90103425311646684883
ANRBA3-R11-0050-9023427311647035880
ANRBA3-R05-0030-90133426311646735880
ANRBA3-R07-0040-9063426801646835894
ANRBA3-R10-0060-9083427811646985881
ANRBA5-R10-0090-9083416891644362862
ANRBA5-R12-0100-9083416851644267860
ANRBA5-R12-0100-9073416851644267860
ANRBA5-R14-0070-9063414871644169859
ANRBA5-R04-0100-9063419341644664864
ANRBA5-R04-0100-9053419341644664864
ANRBA5-R10-0100-9073417361644366857
ANRBA5-R05-0010-9053414871644617868
ANRBA5-R10-0110-9073417831644363868
ANRBA5-R10-0090-9073416891644362862
ANRBA5-R14-0070-9053414871644169859
ANRBA5-R11-0020-9023413381644314868
ANRBA5-R05-0090-9073418881644618865
ANRBA5-R09-0110-90103418391644414860
ANRBA5-R03-0010-9053415331644713868
ANRBA5-R06-0100-9073418861644565868
ANRBA5-R10-0100-9083417361644366857
ANRBA5-R07-0100-9073418371644515863
ANRBA5-R05-0090-9083418881644618865
ANRBA5-R05-0020-9093415341644617867
ANRBA5-R11-0100-9083417381644316861
ANRBA5-R13-0080-9083415341644220861
ANRBA5-R05-0020-9083415341644617867
ANRBA5-R08-0100-9083418361644464869
ANRBA5-R08-0100-9073418361644464869
ANRBA5-R14-0010-9023411841644164864
ANRBA5-R06-0100-9083418861644565868
ANRBA5-R12-0070-9073415351644266863
ANRBA5-R13-0080-9073415341644220861
ANRBA5-R14-0010-9033411841644164864
ANRBA5-R09-0100-9083417881644416862
ANRBA5-R09-0110-90113418391644414860
ANRBA5-R09-0100-9073417881644416862
ANRBA5-R07-0100-9083418371644515863
ANRBA5-R09-0090-9073417371644414860
ANRBA5-R13-0020-9023412411644214867
ANRBA5-R11-0100-9073417381644316861
ANRBA5-R12-0090-9053416341644267862
ANRBA5-R12-0090-9063416341644267862
ANRBA5-R14-0080-9073415371644165861
ANRBA5-R13-0060-9053414371644217862
ANRBA5-R03-0010-9063415331644713868
ANRBA5-R10-0110-9083417831644363868
ANRBA5-R07-0090-9063417871644514867
ANRBA5-R09-0080-9073416851644414862
ANRBA5-R09-0090-9083417371644414860
ANRBA5-R10-0020-9053413381644367872
ANRBA5-R14-0080-9083415371644165861
ANRBA5-R08-0010-9053413901644468868
ANRBA5-R14-0050-9063413901644165860
ANRBA5-R14-0090-9093415861644167859
ANRBA5-R07-0090-9053417871644514867
ANRBA5-R13-0010-9023411901644213878
ANRBA5-R06-0070-9083417361644565863
ANRBA5-R07-0020-9053414381644516870
ANRBA5-R12-0110-90103417331644266868
ANRBA5-R13-0010-9033411901644213878
ANRBA5-R13-0060-9043414371644217862
ANRBA5-R12-0070-9083415351644266863
ANRBA5-R08-0090-9053417861644463868
ANRBA5-R13-0070-9083414851644220859
ANRBA5-R12-0080-9093415861644266862
ANRBA5-R10-0020-9033413381644367872
ANRBA5-R05-0110-9073419841644616867
ANRBA5-R13-0030-9023412871644213863
ANRBA5-R07-0020-9043414381644516870
ANRBA5-R08-0090-9063417861644463868
ANRBA5-R14-0090-9083415861644167859
ANRBA5-R05-0070-9073417841644613864
ANRBA5-R05-0010-9043414871644617868
ANRBA5-R12-0110-90113417331644266868
ANRBA5-R14-0060-9063414361644167858
ANRBA5-R11-0080-9063416421644312860
ANRBA5-R12-0080-9083415861644266862
ANRBA5-R12-0130-9053418341644265859
ANRBA5-R11-0010-9033412961644315874
ANRBA5-R14-0060-9053414361644167858
ANRBA5-R12-0020-9033412861644266869
ANRBA5-R08-0010-9043413901644468868
ANRBA5-R12-0060-9053414861644267864
ANRBA5-R04-0020-9053415341644665868
ANRBA5-R07-0110-9093418871644516868
ANRBA5-R11-0020-9033413381644314868
ANRBA5-R13-0070-9073414851644220859
ANRBA5-R09-0080-9083416851644414862
ANRBA5-R11-0070-9083415881644317859
ANRBA5-R12-0020-9023412861644266869
ANRBA5-R12-0030-9053413351644264865
ANRBA5-R12-0030-9043413351644264865

 

QUALIFIED PERSON

All scientific and technical information in this press release, including the results of the Aburna drill program and how these results relate to the ongoing exploration at the Kerkasha Project has been reviewed, verified, and approved by John Wilton CGeol FGS, CEO & Director of Alpha and a "qualified person" for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

ABOUT ALPHA

Alpha (TSXV: ALEX) is an exploration company that is rapidly advancing a number of important gold and base metal discoveries it has made across the 100% owned, 514 km2 Kerkasha Project in Eritrea.

The Aburna Gold Prospect is an exciting new gold discovery where recent drilling has confirmed a high-grade mineralized system, with grades including 18m @ 15.33 g/t Au, 16 m @ 14.07 g/t Au, 9 m @ 10 g/t Au and 23 m @ 6.74 g/t Au.

The Anagulu Gold-Copper prospect with recent drilling intersections of 108 m @ 1.24 g/t Au and 0.60% Cu including 49 m @ 2.42 g/t Au and 1.10% Cu, and 109 m @ 0.79 g/t Au and 0.35 % Cu within a porphyry unit drilled over 2kms along trend, and with an overall and expanding exploration target footprint of some 4 by 2kms.

The Company is managed by a group of highly experienced and successful mining and exploration professionals with long track records of establishing, building and returning value to stakeholders from a number of world class gold and base metal discoveries in Eritrea and across the wider Arabian Nubian Shield.

For further information go to the Alpha webpage at www.alpha-exploration.com or contact:

John Wilton

CEO

Alpha Exploration Ltd.

Email: John@alpha-exploration.com

Tel: +44 207 129 1148

Cautionary Notes

This press release is intended for distribution in Canada only and is not intended for distribution to United States newswire services or dissemination in the United States. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Forward-Looking Statements

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to future dataset interpretations, sampling, plans for its projects (including the Anagulu prospect), surveys related to Alpha's assets, and the Company's drilling program. Often, but not always, forward-looking statements or information can be identified by the use of words such as "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. With respect to forward-looking statements and information contained herein, Alpha has made numerous assumptions including among other things, assumptions about general business and economic conditions and the price of gold and other minerals. The foregoing list of assumptions is not exhaustive.

Although management of Alpha believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that forward-looking statements or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks relating to Alpha's financing efforts; risks associated with the business of Alpha given its limited operating history; business and economic conditions in the mining industry generally; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; changes in laws (including regulations respecting mining concessions); risks related to the direct and indirect impact of COVID-19 including, but not limited to, its impact on general economic conditions, the ability to obtain financing as required, and causing potential delays to exploration activities; those factors discussed under the heading "Risk Factors" in the Final Prospectus; and other risk factors as detailed from time to time. Alpha does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/302659

© 2026 Canjex Publishing Ltd. All rights reserved.