21:37:20 EDT Fri 30 Oct 2026
Enter Symbol
or Name
USA
CA



Hot Chili Limited - Quarterly Report, Period Ending 30 September 2026

2026-10-30 18:12 ET - News Release

Hot Chili Limited - Quarterly Report, Period Ending 30 September 2026

PR Newswire

PERTH, Australia, Oct. 30, 2026 /PRNewswire/ --

Highlights

Second Porphyry Discovery Confirmed at La Verde

  • Assay results for step-out drilling, completed after the reporting period, confirmed the discovery of a second porphyry center - La Verde South - near-doubling the growth potential of the La Verde Project.
  • First step-out Reverse Circulation (RC) drill hole DKP084, located approximately 250 m to the south of La Verde's +0.4% Cu mineralisation footprint, has delivered:
    • 148 m grading 0.44% CuEq1(0.39% Cu, 0.07 g/t Au) from 36 m
      • Including 44 m grading 0.56% CuEq (0.50% Cu, 0.06 g/t Au) from 138 m
  • First step-out diamond drill hole (DD) DKD100, located a further 100 m to the south of DKP084, also visually recorded a 307 m down-hole interval of copper porphyry-style mineralisation2.
  • Phase 2 resource infill and extensional drilling for La Verde is now complete, following 13 months and over 40,000m of DD and RC drilling, adding to the 10,000 m of RC drilling from Phase 1.

Hot Chili Delivers More Copper-Gold at La Verde

  • Strong assay results continued to be delivered during the quarter from the four drill rigs (2 Diamond and 2 Reverse Circulation) located at La Verde.
  • Continuity of higher-grade copper-gold mineralisation from shallow depths was further confirmed from infill drilling and step out diamond drilling continued to expand the discovery footprint.
  • Standout results reported during the quarter included:
    • DKP063 recorded 398 m grading 0.45% CuEq (0.35% Cu, 0.12 g/t Au) from surface
      • Including 62 m grading 0.91% CuEq (0.70% Cu, 0.30 g/t Au) from 20 m
      • Which includes 34 m grading 1.00% CuEq (0.80% Cu, 0.27 g/t Au) from 42 m
    • DKD060 recorded 472 m grading 0.41% CuEq (0.34% Cu, 0.08 g/t Au) from 49 m
      • Including 105.8 m grading 0.70% CuEq (0.58% Cu, 0.15 g/t Au) from 397 m
      • Including 32.6 m grading 0.90% CuEq (0.75% Cu, 0.19 g/t Au) from 438 m
    • DKP064 recorded 126 m grading 0.45% CuEq (0.38% Cu, 0.08 g/t Au) from 54 m
      • Including 26 m grading 0.70% CuEq (0.60% Cu, 0.13 g/t Au) from 108 m
    • DKP078 recorded 240 m grading 0.43% CuEq (0.30% Cu, 0.17 g/t Au) from 36 m
      • Including 54 m grading 0.60% CuEq (0.41% Cu, 0.26 g/t Au) from 46 m
      • And including 42 m grading 0.50% CuEq (0.36% Cu, 0.20 g/t Au) from 188 m
  • The maiden La Verde MRE, revised Costa Fuego PFS and preparation of the EIA submission remained on track, with assay results pending for 35 drill holes (24 infill drilling and 11 southern step-out drillholes).

La Verde Drilling Totals 50,000m, with Phase 2 Now Complete

Strong Cash Position of A$29.3 Million following closure of OR Royalty Amendment Agreement during the quarter.

View PDF version

SUMMARY OF OPERATIONAL ACTIVITIES

Second Porphyry Centre Confirmed at La Verde South

Assay results for step-out drilling, returned after the reporting period, confirmed the discovery of a second porphyry centre at La Verde South. Located immediately south of, and along strike from, the initial La Verde copper-gold porphyry discovery, extending the potential mineralisation footprint of La Verde to 1,400m.

The first Reverse Circulation (RC) step-out drill hole, DKP084, was collared approximately 250 m south of La Verde's existing +0.4% Cu mineralisation footprint and returned 148 m grading 0.44% CuEq1 (0.39% Cu, 0.07 g/t Au) from 36 m, including 44 m grading 0.56% CuEq (0.50% Cu, 0.06 g/t Au) from 138 m.

The intersection was primarily oxide copper porphyry-style mineralisation, commencing immediately below shallow gravel cover, and was designed to follow up previously reported RC drill hole DKP024, which recorded 114 m grading 0.4% CuEq (0.4% Cu) from 86 m, including 52 m grading 0.5% CuEq (0.5% Cu, 0.1 g/t Au) from 96 m (see announcement dated 19 May 2025).

The first southern Diamond Drill (DD) step-out drill hole, DKD100, was then collared a further 100 m south of DKP084 to test for higher-grade copper porphyry-style sulphide mineralisation beneath the oxide zone.

DKD100 visually recorded a 307 m downhole interval of copper porphyry-style mineralisation2, comprising oxide mineralisation between 40 m and 172 m and porphyry-style sulphide mineralisation between 172 m and 347 m.


 
 Core photo from DKD100 (259 - 261 m downhole) with vein-hosted and disseminated chalcopyrite (2%) and pyrite (4%) mineralisation in strongly veined tonalite host rock(2)




    (1) Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and Ag=30 USD/oz. The
     entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).


    (2) Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Assay results are pending and will be reported in accordance with the JORC Code (2012) and National Instrument 43-101 - Standards of Disclosure
     for Mineral Projects. Sampling methodologies are described in the attached JORC Table 1.

Expansion Drilling Continues to Demonstrate Scale and Continuity

In parallel with southern step-out drilling, drilling across the main La Verde discovery continued to refine the geological interpretation of the mineralised system, further delineating the interpreted high-grade core and demonstrating the vertical and lateral continuity of porphyry-hosted copper-gold mineralisation.

A significant result was returned from DKD060 intersected 472 m grading 0.41% CuEq (0.34% Cu, 0.08g/t Au) from 49 m depth, including a significant higher-grade component comprising 105.8 m grading 0.70% CuEq from 397 m, which also included 32.6 m grading 0.90% CuEq from 438 m (Figure 4).

Results from RC drill hole DKP067 also expanded the lateral extent of mineralisation along La Verde's eastern flank. The drillhole, reported as a partial result, returned 112 m grading 0.47% CuEq (0.40% Cu, 0.10 g/t Au) from 42 m, including 26 m grading 0.70% CuEq (0.59% Cu, 0.14 g/t Au) from 62 m.

In-fill RC Drilling Confirms Continuity of Near-Surface, Bulk Mineralisation

RC drill holes targeting the up-dip extension of high-grade mineralisation at La Verde has continued to return wide intersections of copper-gold mineralisation from shallow depths. Importantly, results are distributed across the deposit, highlighting the scale and continuity of La Verde's growing high-grade core.

These results are headlined by DKP063 (Figure 4), which recorded 398 m grading 0.45% CuEq (0.35% Cu, 0.12 g/t Au) from surface. Within this, a significant higher-grade component includes 62 m grading 0.91% CuEq(0.70% Cu, 0.30 g/t Au) from just 20 m depth, demonstrating the continuity of high-grade mineralisation at shallow depths and reinforcing the potential for a high-grade starter pit, capable of delivering early higher-grade material to the Costa Fuego mine plan.

DKP075 recorded a partial result of 132 m grading 0.57% CuEq (0.45% Cu, 0.16 g/t Au) from 24 m depth which included 42 m grading 0.70% CuEq (0.57% Cu, 0.19 g/t Au) from 96 m (Figure 5). Results for the final 177 m were still outstanding and are expected to be reported shortly.

Additionally, DKP064, which was collared at the southern extent of La Verde's high-grade core, returned 126 m grading 0.45% CuEq (0.38% Cu, 0.08 g/t Au) from 54 m depth, including 26 m grading 0.70% CuEq (0.60% Cu, 0.13 g/t Au) from 108 m, together with a second intersection of 74 m grading 0.35% CuEq (0.29% Cu, 0.07 g/t Au) from 276 m.

La Verde Drilling Totals 50,000m, with Phase 2 Now Complete

Drilling for the 40,000 m Phase 2 DD and RC program is now complete, following 13 months of progress and bringing the total at La Verde to 50,000 m. The Phase 1 RC program (completed from late 2024 to mid-2025) included 10,000 m and outlined a 750 m x 400 m x 400 m footprint, and in conjunction with Phase 2, has now identified a 1,400 m x 780 m x 800 m footprint across two porphyry centres. Resource infill drilling of La Verde is now complete, and drill rigs will start back up and focus on the growth of La Verde South in early 2027.

Project Development Integration

Since 30 June 2026, Hot Chili has further strengthened the dedicated Costa Fuego project development team and its integrated governance framework for the revised Pre-Feasibility Study (PFS) and Environmental Impact Assessment (EIA) programs, progressing multiple engineering, permitting, social, infrastructure and technical studies.

Key activities advanced include mine-plan inputs, hydrogeological and geotechnical investigations, TSF engineering and water-management studies, and evaluation of power-supply and transmission-line relocation options. Project controls are being consolidated through an integrated P6 schedule, clearer critical-path reporting, risk management and disciplined contractor cost and payment controls.

Environmental Impact Assessments (EIAs) Continue to Progress

During the quarter preparation of the Costa Fuego environmental approvals continued under the separate EIA 1A (Huasco Water) and EIA 1B (Costa Fuego) workstreams. Unusually heavy rainfall during July and August 2026 affected field activities resulted in delays which have been mitigated in part through four weeks of scheduled contingency. The Q2 2027 submission remains on track for both EIAs.

The two-stream permitting strategy has now been embedded in the project delivery framework:

  • EIA 1A: the seawater intake, pumping and distribution system. Work progressed on the Project Description, environmental chapters, PAS 155 and PAS 156 gap-closure actions, the Punta Huasco Sur protection-area consultation, and flora, vegetation, vertebrate fauna and entomofauna compatibility studies. The latest Project Description revision was under review in October.
  • EIA 1B: baseline studies, engineering inputs and environmental documentation progressed in parallel with the revised PFS2. Archaeological fieldwork was completed, hydrogeological field investigations and packer testing advanced, and the TSF, diversion-water and associated infrastructure packages continue to be developed for incorporation into the assessment.

Costa Fuego Revised PFS Advancement

During the quarter Hot Chili continued to advance workstreams at La Verde, designed to incorporate the new discovery into the Costa Fuego PFS as soon as possible. Geotechnical workstreams were completed at La Verde and are being incorporated into Mineral Resource Estimation and engineering design work, in parallel to metallurgical, hydrogeological and tailings testwork programs.

Analysis of multiple potential materials handling options between La Verde and Productora, the Costa Fuego central processing hub, are also underway. The potential development of a large open-pit mining scenario at Cortadera as an alternative to the previously defined open-pit and underground block cave operation for the later years of Costa Fuego's mine plan is also being finalised.

Social Integration and Community Support

Hot Chili continued its community engagement activities, with a round of early community engagement (Participación Ciudadana Temprana, PCT) in Huasco, Freirina and Vallenar. Public information stands shared details about the Huasco Water project and introduced the Produce Futuro Fund. Additional baseline interviews were completed with a further 9 parties, including 7 Indigenous organisations and 2 neighbourhood associations.

Launched in September, the Produce Futuro Fund will provide grants to successful applicants to support economic development in the Huasco Valley. Hot Chili coordinated the launch and held support sessions to help community members apply. The company received more than 300 applications, with 55 grants to be awarded next quarter.

Figure 1. Long section view (A - A') showing recent drill hole results DKP084 (± 75m clipping) and +0.3% copper (red), +0.4% (purple) copper interpolants and extent of visual estimate3 of porphyry -style copper mineralisation in DKD100, relative to the La Verde Discovery


 
 (1) See Page 26 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.


    (2) Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and Ag=30 USD/oz. The
     entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu (%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).


    3 Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Assay results are pending and will be reported in accordance with the JORC Code (2012) and National Instrument 43-101 - Standards of Disclosure for
     Mineral Projects. Sampling methodologies are described in the attached JORC Table 1.

Figure 2. Plan view map of La Verde showing recent drill hole results and updated +0.2% copper (yellow), +0.3% copper (red), +0.4% copper (magenta) mineralisation interpolants. Drilled holes with pending assays are shown in black. Position of A - A' long section (Figure 1 and 3) and B - B' (Figure 4) and C - C' (Figure 5) annotated with white dashed lines. Conceptual open pit shells1 displayed for $US3.50/lb Cu (short dash) and $US6.00/lb Cu (long dash) displayed as dashed lines. Results reported including CuEq2, visual estimate from DKD100 shown3.


 
 (1) See Page 26 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.


    (2) Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and Ag=30 USD/oz. The
     entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).


    (3) Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Assay results are pending and will be reported in accordance with the JORC Code (2012) and National Instrument 43-101 - Standards of Disclosure
     for Mineral Projects. Sampling methodologies are described in the attached JORC Table 1.

Figure 3. Long-section slice (A - A') showing drill hole results and updated +0.2% copper (yellow), +0.3% copper (red), +0.4% copper (magenta) mineralisation interpolants. Returned Cu grades shown on hole traces, drilled holes with pending assays are shown in black. Conceptual open pit shells1 displayed for $US3.50/lb Cu (short dash) and $US6.00/lb Cu (long dash) displayed as dashed lines. Results reported including CuEq2, visual estimate from DKD100 shown3.


 
 (1) See Page 26 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.


    (2) Copper Equivalent (CuEq) reported for the drillhole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and Ag=30 USD/oz. The
     entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56% Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).


    (3) Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Assay results are pending and will be reported in accordance with the JORC Code (2012) and National Instrument 43-101 - Standards of Disclosure
     for Mineral Projects. Sampling methodologies are described in the attached JORC Table 1.

Figure 4. Cross section slice (B - B') showing recent drill hole results DKP063, DKP064, DKP059 and DKD060 (± 75m clipping) and updated +0.2% copper (yellow), +0.3% copper (red), +0.4% copper (magenta) mineralisation interpolants. Returned Cu grades shown on hole traces, drilled holes with pending assays are shown in black. Conceptual open pit shells1 displayed for $US3.50/lb Cu (short dash) and $US6.00/lb Cu (long dash) displayed as dashed lines. Results reported including CuEq2.

Figure 5. Cross section slice (C - C') showing drill hole results for DKP075 and DKP078 (± 75m clipping) and updated +0.2% copper (yellow), +0.3% copper (red), +0.4% copper (magenta) mineralisation interpolants. Returned Cu grades shown on hole traces, drilled holes with pending assays are shown in black. Conceptual open pit shells1 displayed for $US3.50/lb Cu (short dash) and $US6.00/lb Cu (long dash) displayed as dashed lines. Results reported including CuEq2.

Table 1. Drill Holes Completed for La Verde in Quarter 3 2026

           Prospect        Hole ID   East   North   RL    Depth     Dip                                   Azi.                       Results


 La Verde           DKD068         324321  6785527  1179     865.4      -61                                     72 
 Results Pending


 DKP069                     324671 6786109     1184   378       -69       77 
      Results Pending


 DKP070                     324516 6785676     1150   324       -58      271        Significant result returned
                                                                               Q3 2026


 DKP071                     324567 6785711     1133   397       -60       90 
      Results Pending


 DKP072                     324780 6785773     1132   408       -59      244        Significant result returned
                                                                               Q4 2026


 DKP073                     324866 6785725     1137   231       -64      249 
      Results Pending


 DKP074                     324703 6785591     1138   282       -60      271 
      Results Pending


 DKP075                     324632 6785991     1152   333       -57       99        Significant result returned
                                                                               Q4 2026


 DKD076                     324640 6785842     1134 618.5       -58       74 
      Results Pending


 DKP077                     324421 6785619     1178   324       -58       80        Significant result returned
                                                                               Q4 2026


 DKP078                     324658 6785901     1141   324       -69      332        Significant result returned
                                                                               Q4 2026


 DKP079                     324515 6785522     1188   360       -61       90        Significant result returned
                                                                               Q4 2026


 DKP080                     324054 6786141     1105   126       -60      239        Significant result returned
                                                                               Q4 2026


 DKP081                     324713 6785594     1138    30       -60       70        Significant result returned
                                                                               Q4 2026


 DKP082                     324713 6785593     1138   288       -67       71        Significant result returned
                                                                               Q4 2026


 DKP083                     324177 6786091     1102   216       -60      244 
      Results Pending


 DKP084                     324420 6785327     1187   366       -62       75        Significant result returned
                                                                               Q4 2026


 DKP085                     324257 6786043     1104   252       -60      250 
      Results Pending


 DKD086                     324507 6785744     1124 770.6       -60       35 
      Results Pending


 DKP087                     324911 6785764     1137   204       -58       71 
      Results Pending


 DKP088                     324427 6785221     1188   326       -59       92 
      Results Pending


 DKP089                     324957 6785822     1141   162       -57      262 
      Results Pending


 DKP090                     324249 6785307     1177   396       -60       89 
      Results Pending


 DKP091                     324997 6785961     1174   360       -59      301 
      Results Pending


 DKP092                     324205 6785152     1175   402       -60       91 
      Results Pending


 DKP093                     324956 6785820     1141   162       -61      306 
      Results Pending


 DKP094                     324695 6785663     1133   174       -59      271 
      Results Pending


 DKP095                     324352 6785006     1164   351       -60       91 
      Results Pending


 DKP096                     324733 6785525     1139   264       -64       70 
      Results Pending


 DKP097                     324508 6785000     1183   324       -60       89 
      Results Pending


 DWEDKD001                  324668 6786110     1184 231.1       -80       78 
      Results Pending


 DWEDKD002                  324549 6786081     1153   190       -89      170 
      Results Pending


 DWEDKD003                  324688 6785742     1128   250       -80      100 
      Results Pending


 DWEDKD004                  324909 6785767     1137 111.3       -79       50 
      Results Pending


 DWEDKD005                  324535 6785746     1123 186.1       -80      231 
      Results Pending

Table 2. Significant Drilling Intersections from La Verde in Quarter 3 2026

           Hole ID         Coordinates        Azim        Dip         Hole Depth          Intersection                 Interval               Copper Eq1               Copper           Gold           Silver            Molyb.


            North     East       RL    From        To         (m)          (% CuEq)           (% Cu)       (g/t
                                                                                                            Au)              (ppm Ag)                (ppm Mo)


  DKP045D          6785947    324415     1110          60         -60               840.5                0        16.0                   16.0                     0.42             0.40           0.02              1.08           24


                                                                                               310.0       457.0                  147.0                      0.35             0.26           0.08              0.83             61


                                                                                Incl           381.3       407.0                   25.7                      0.50             0.37           0.14              1.44             58


  DKP051           6785722    324332     1167          56         -65                 372             54.0       124.0                   70.0                     0.25             0.20           0.06              0.49           21


                                                                                                68.0        80.0                   12.0                      0.45             0.39           0.07              0.25             16


  DKP052           6786024    324756     1188         245         -60                 354             82.0       354.0                  272.0                     0.40             0.32           0.10              0.83            9


                                                                                Incl            92.0       134.0                   42.0                      0.50             0.39           0.14              0.91             13


                                                                              & Incl           226.0       242.0                   16.0                      0.64             0.54           0.13              1.39              6


                                                                              & Incl           252.0       280.0                   28.0                      0.60             0.48           0.16              0.89              6


  DKP058           6785775    324785     1134          70         -57                 402             24.0       206.0                  182.0                     0.50             0.41           0.10              0.77           20


 (updated)                                                                      Incl            24.0        56.0                   32.0                      0.60             0.52           0.12              0.66              6


  DKP059           6785728    324866     1139          70         -61                 120               36          78                   42.0                     0.25             0.21           0.04              0.35           30


  DKD060           6785762    324909     1139         260         -61               772.7             49.0       521.0                  472.0                     0.41             0.34           0.08              0.60           34


 (updated)                                                                      Incl            93.4       157.1                   63.7                      0.50             0.42           0.10              0.73             10


                                                                              & Incl           397.0       502.8                  105.8                      0.70             0.58           0.15              0.99             19


                                                                             Or Incl           438.0       470.6                   32.6                      0.90             0.75           0.19              1.30             31


                                                                                               642.1       765.2                  123.1                      0.30             0.27           0.02              0.80             23


                                                                                Incl           655.5       657.8                    2.3                      4.63             4.56           0.02             10.40             18


  DKP061           6785608    324901     1147         271         -61                 273               70          98                   28.0                     0.27             0.22           0.05              0.71           25


                                                                                                 166         206                   40.0                      0.40             0.33           0.08              1.10             21


  DKP063           6785713    324566     1132          63         -70                 417                0         398                  398.0                     0.45             0.35           0.12              0.58           18


                                                                                Incl              20          82                   62.0                      0.91             0.70           0.30              1.07              6


  DKP063                                                                        Incl              20          32                   12.0                      1.00             0.66           0.49              1.40              7


                                                                              & Incl              42          76                   34.0                      1.00             0.80           0.27              0.95              5


  DKP064           6785669    324508     1155         101         -57                 426               54         180                  126.0                     0.45             0.38           0.08              1.03           24


                                                                                Incl             108         134                   26.0                      0.70             0.60           0.13              0.83             11


                                                                                                 276         350                   74.0                      0.35             0.29           0.07              0.85             16


  DKP067           6785774    324785     1134         114         -60                 300               42         154                    112                     0.47              0.4            0.1              0.89            8


                                                                                Incl              62          88                     26                       0.7             0.59           0.14              1.19              9


  DKP072           6785767    324776     1133         244         -59                 408               12         172                    160                     0.37              0.3           0.09              0.83            5


                                                                                Incl              12          52                     40                      0.53             0.45           0.11              0.97              4


                                                                              & Incl             144         172                     28                      0.49             0.39           0.14              0.92              7


  DKP075           6785983    324631     1153          99         -57                 333               24         212                    188                     0.56             0.44           0.16              0.72           10


                                                                                                 304         333                     29                       0.5             0.39           0.15              0.51             11


  DKP077           6785616    324420     1177          80         -58                 324              230         274                     44                     0.33             0.25           0.06              1.09           79


                                                                                                 318         324                      6                      0.46             0.36           0.09               2.1             81


  DKP078           6785893    324659     1142         332         -69                 324               36         276                    240                     0.43              0.3           0.17              0.69           13


                                                                                Incl              46         100                     54                       0.6             0.41           0.26              0.59              9


                                                                              & Incl             188         230                     42                       0.5             0.36            0.2               0.8              9


  DKP079           6785514    324520     1187          90         -61                 360              156         210                     54                      0.3             0.25           0.06              0.87           14


  DKP080           6786126    324051     1103         240         -60                 126                0          16                     16                     0.24             0.23           0.01              0.33           14


 DKP081(2)         6785590    324705     1138          70         -60                  30                0          30                     30                     0.35             0.28           0.09              0.61            7


  DKP082           6785590    324705     1138          70         -67                 288                0         158                    158                     0.36              0.3           0.08              1.02           14


                                                                                Incl             132         150                     18                      0.58              0.5            0.1              2.19             15


                                                                                                 236         264                     28                      0.43             0.32           0.15              0.98             10


  DKP084           6785322    324417     1186          75         -62                 366               36         184                    148                     0.44             0.39           0.07               1.0            8


                                                                                Incl             138         182                     44                      0.56             0.50           0.06               1.8              8

   Notes to Table 2: Significant intercepts for La Verde are reported above a nominal cut-off grade of 0.20% Cu. Reported intersections may include internal dilution (intervals below 0.20% Cu), including zones exceeding 30 m downhole width, where the overall weighted average grade of the intersection remains above the cut-off grade. Significant intersections are separated where zones of internal dilution result in discrete intervals that do not meet the reporting criteria.
    The selection of a 0.20% Cu cut-off grade is aligned with a marginal economic cut-off for bulk tonnage polymetallic copper deposits of comparable grade in Chile and globally. Significant intersection widths (interval) have been rounded to the nearest metre.


 
   
            (1)                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Copper Equivalent (CuEq) reported for the drill hole intersections were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  t × Mo_recovery) + (Au ppm × Au price per g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu_recovery). The Metal Prices applied in the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  calculation were: Cu=4.50 USD/lb, Au=3,150 USD/oz, Mo=20 USD/lb, and Ag=30 USD/oz. The entirety of the intersection is assumed as fresh.  The recovery and copper equivalent formula for La
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Verde uses Cortadera as a proxy, which is considered reasonable given both the similar mineralisation style and amenability testwork completed thus far at La Verde - Recoveries of 83% Cu, 56%
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Au, 83% Mo and 37% Ag. CuEq (%) = Cu(%) + 0.69 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0043 x Ag(g/t).


 
   
            (2)                                                                                                                                                                                                                                                                                                                                                                                                                                                                         
 DKP081 was abandoned due to mechanical issues and was redrilled as DKP082

SUMMARY OF CORPORATE ACTIVITIES

Strategic Partnering Process Update

Hot Chili continues to advance its asset-level strategic Partnering Process, aimed at introducing one or more qualified partners with the financial, technical and operational capability to assist in funding and delivery of the projects.

During the quarter management continued to facilitate ongoing due diligence activities, including arranging site visits, while discussions continued in relation to existing non-binding, indicative, incomplete and conditional proposals received for potential transactions involving the projects.

The Partnering Process may result in a range of transactions for the Projects. Investors are cautioned that there is no certainty the Partnering Process will result in a transaction or binding agreement.

BMO Capital Markets continues to act as financial adviser in connection with the Partnering Process.

The Company will continue to update the market in accordance with its continuous disclosure obligations.

OR Royalty Amendment Agreement

During the quarter, Hot Chili completed the Amended and Restated Investment Agreement with OR Royalties Inc. ("OR"), receiving net proceeds of A$20.4 million, after transaction costs, from the additional US$15 million royalty investment.

The transaction brings total consideration received under the OR royalty arrangement to US$30 million and expands OR's royalty interest to include the La Verde Project.

The additional non-dilutive funding further strengthens the Company's balance sheet and supports the ongoing advancement of La Verde and the broader Costa Fuego copper-gold development.

The agreement also incorporates an updated change of control buy-back provision, preserving strategic flexibility as the Company progresses its Strategic Partnering Process.

For further details, refer to the Company's announcement dated 7 July 2026.

Cash Position

As of 30 September 2026, the Company had cash of A$29.3 million and no debt.

The operating expenditure for quarter ended 30 September 2026 included payments for staff costs of A$1.3 million and administration and corporate costs of A$1.5 million.

The investing expenditure for quarter ended 30 September 2026 included payments for tenements of A$3.4 million relating mostly to the payment of the San Antonio Purchase Option Agreement for US$2 million, and payments for exploration and evaluation of A$10.1 million relating to drilling (four drill rigs in operation) and development study activities across the La Verde copper-gold porphyry discovery, value engineering workstreams and EIA submission activities. This was offset by the receipt of A$20.4 million (net of costs) from the OR Royalty Amendment Agreement.

With the Phase 2 resource infill and extensional drilling program at La Verde scheduled for completion by the end of October 2026, the Company anticipates a material reduction in exploration expenditure in subsequent quarters.

Capital Structure

The following summarises the Company's securities on issue:

  • 202,901,656 ordinary fully paid shares
  • 1,212,121 options at AUD $2.145 expiring 12 August 2028
  • 420,302 service rights
  • 4,729,457 performance rights

Additional ASX Disclosure Information

ASX Listing Rule 5.3.2: There was no substantive mining production and development activities during the quarter.

ASX Listing Rule 5.3.3 - Schedule of Mineral Tenements as of 30 September 2026.

The schedule of Mineral Tenements and changes in interests is appended at the end of this activities report.

ASX Listing Rule 5.3.4: Reporting under a use of funds statement in a Prospectus does not apply to the Company currently.

ASX Listing Rule 5.3.5: Payments to related parties of the Company and their associates during the quarter per Section 6.1 of the Appendix 5B totalled $234,000. This is comprised of directors' salaries and superannuation of $234,000.

Health, Safety, Environment and Quality

Field operations during the quarter included geological reconnaissance activities, diamond and reverse circulation drilling, sampling baselines and site investigations for EIA and revised PFS2, across the Company's Costa Fuego project landholdings, focused on La Verde and Productora. Activities on new tenements are run at the Productora or Cortadera operations centers and their safety statistics are included under the figures for all projects.

One Lost Time Injury (LTI) was recorded during the quarter. The LTI occurred during diamond drilling activities when an accident in retrieving a sample resulted in a fractured finger.

Hot Chili's sustainability framework ensures an emphasis on business processes that target long-term economic, environmental and social value. The Company is dedicated to continual monitoring and improvement of health, safety and the environmental systems. There is no greater importance than ensuring the safety of our people and their families.

Table 3. HSEQ Quarter 3 2026 Performance and Statistics


 
            Deposit                      Domeyko                  Productora                   All Projects



 
            Timeframe            Q3 2026         Cum.2  Q3 2026              Cum.2    Q3 2026               Cum.2
                                                     2024                         2024                            2024



 LTI events                              1              1         0                   1           1                    5



 NLTI events                             1              0         0                   1           1                    6



 Days lost                              66             83         0                   4          66                  194



 LTIFR index                            23             20         0                  16          20                   21



 ISR index                            1543            552         0                  66        1314                  800



 IFR Index                              47             47         0                  33           0                   45



 Thousands of man-hours               42.8            150       7.2                  61        50.2                  243



 Incidents on materials and assets       0              2         0                   0           0                    2



 Environmental incidents                 0              0         0                   0           0                    0



 Headcount(1)                          100             36        28                  20         130                   69

 Notes: HSEQ is the acronym for Health, Safety, Environment and Quality.  LTIFR per million-manhours.  Safety performance is reported on a monthly basis to the National Mine Safety Authority on a
         standard E-100 form; (1) Average monthly headcount (2) Cumulative statistics since April 2024.

Tenement Changes During the Quarter

During the Quarter, Sociedad Minera La Frontera SpA ("La Frontera") exercised the option granted under the San Antonio Purchase Option Agreement, thereby acquiring ownership of 30 mining concessions.

During the reporting period, La Frontera also obtained the extensions of the following mining exploration concessions: "Cortadera 1", "Cortadera 2", "Cortadera 3", "Cortadera 4", "Cortadera 5", "San Antonio 1", "San Antonio 2", "San Antonio 3", "San Antonio 4" and "San Antonio 5"

In the course of the Quarter, the following mining exploration concessions have expired upon reaching their expiration date: "CF 1", "CF 2", "CF 3", "CF 4", "CF 5", "Juli 19", "Juli 20", "Juli 22", "Juli 23", "Julieta 5", "Julieta 6", "Julieta 7", "Julieta 8", "Julieta 9", "Julieta 11", "Julieta 12", "Julieta 16" and "Julieta 17".

In addition, during the quarter, La Frontera filed the following exploitation mining claims (manifestaciones), exercising the preferential rights arising from the corresponding exploration concessions: "CF 1 1/60", "CF 2 1/60", "CF 3 1/60" and "CF 4 1/40". Furthermore, Sociedad Minera El Aguila SpA ("El Aguila") has claimed the following mining exploitation concessions, exercising the preferential rights arising from the corresponding exploration concessions: "Juli 19 1/60", "Juli 20 1/60", "Juli 22 1/60", "Juli 25 1/60", "Julieta 5 1/40", "Julieta 6 1/40", "Julieta 11 1/60", "Julieta 12 1/60", "Julieta 16 1/40" and "Julieta 17 1/40". In addition, during the period, El Aguila also filed the exploitation mining claim (manifestación) "Julita 7 1/60", which covers the areas comprised within the Julieta 8 and Julieta 9 exploration concessions, as well as the exploration mining application (pedimento) "Bigotes 10".

Finally, during the period, the exploration mining concessions "CF Sur 17", "CF Sur 27", and "CF Sur 30" were judicially declared lapsed because of non-compliance with Article 112 bis of the Chilean Mining Code, which prohibits the overlap of exploration mining concessions held by the same owner. Notwithstanding the foregoing, the area covered by such concessions is encompassed within the exploitation mining concessions currently undergoing the constitution process, namely "Porfiada Sur 1 1/60", "Porfiada Sur 2 1/60", "Porfiada Sur 3 1/40", and "Porfiada Sur 4 1/60". To avoid becoming subject to the same restriction, La Frontera abandoned the exploration concession applications "CF Sur 36" and "CF Sur 37", which were then in the process of being constituted.

The Company's existing tenements are detailed in the tables below.

Table 4. Current Tenement Holdings in Chile as of 30 September 2026

Cortadera Project Tenements

      N°                    License ID            HCH % Held HCH % Earning        Area Agreement Details
                                                                           (ha)


 
 1            
          ALCENIA 1/10 100% Frontera SpA                           50


 
 2                   AMALIA 942 A 1/6 100% Frontera SpA                           53


 
 3          
          ATACAMITA 1/82 100% Frontera SpA                           82


 
 4                   CORROTEO 1 1/260 100% Frontera SpA                          260


 
 5                   CORROTEO 5 1/261 100% Frontera SpA                          261


 
 6                  CORTADERA 1 1/200 100% Frontera SpA                          200


 
 7          
          CORTADERA 1/40 100% Frontera SpA                          374


 
 8                  CORTADERA 2 1/200 100% Frontera SpA                          200


 
 9      
          CORTADERA 41       100% Frontera SpA                            1


 
 10     
          CORTADERA 42       100% Frontera SpA                            1


 
 11         
          LAS CANAS 1/15 100% Frontera SpA                          146


 
 12     
          LAS CANAS 16       100% Frontera SpA                            1


 
 13          LAS CANAS ESTE 2003 1/30 100% Frontera SpA                          300


 
 14                  MAGDALENITA 1/20 100% Frontera SpA                          100


 
 15                 PAULINA 10 B 1/16 100% Frontera SpA                          136


 
 16                 PAULINA 11 B 1/30 100% Frontera SpA                          249


 
 17                 PAULINA 12 B 1/30 100% Frontera SpA                          294


 
 18                 PAULINA 13 B 1/30 100% Frontera SpA                          264


 
 19                 PAULINA 14 B 1/30 100% Frontera SpA                          265


 
 20                 PAULINA 15 B 1/30 100% Frontera SpA                          200


 
 21                 PAULINA 22 A 1/30 100% Frontera SpA                          300


 
 22                   PAULINA 24 1/24 100% Frontera SpA                          183


 
 23                 PAULINA 25 A 1/19 100% Frontera SpA                          156


 
 24                 PAULINA 26 A 1/30 100% Frontera SpA                          294


 
 25                  PAULINA 27A 1/30 100% Frontera SpA                          300


 
 26          PURISIMA 1/8 (1/2 Y 5/6) 100% Frontera SpA                           20           NSR 1.5%


 
 27              
          CF 1 1/60 100% Frontera SpA                          300


 
 28              
          CF 2 1/60 100% Frontera SpA                          300


 
 29              
          CF 3 1/60 100% Frontera SpA                          300


 
 30              
          CF 4 1/60 100% Frontera SpA                          300


 
 31         
          CF 6           100% Frontera SpA                          200


 
 32         
          CF 7           100% Frontera SpA                          100


 
 33         
          CF 8           100% Frontera SpA                          200


 
 34         
          CF 9           100% Frontera SpA                          100


 
 35         
          CF 10          100% Frontera SpA                          200


 
 36         
          CF 11          100% Frontera SpA                          200


 
 37             CHAPULIN COLORADO 1/3 100% Frontera SpA                            3


 
 38       
          CHILIS 1         100% Frontera SpA                          200


 
 39       
          CHILIS 3         100% Frontera SpA                          100


 
 40       
          CHILIS 4         100% Frontera SpA                          200


 
 41       
          CHILIS 5         100% Frontera SpA                          200


 
 42       
          CHILIS 6         100% Frontera SpA                          200


 
 43       
          CHILIS 7         100% Frontera SpA                          200


 
 44       
          CHILIS 8         100% Frontera SpA                          200


 
 45       
          CHILIS 9         100% Frontera SpA                          300


 
 46         
          CHILIS 10 1/38 100% Frontera SpA                          190


 
 47       
          CHILIS 11        100% Frontera SpA                          200


 
 48         
          CHILIS 12 1/60 100% Frontera SpA                          300


 
 49       
          CHILIS 13        100% Frontera SpA                          300


 
 50       
          CHILIS 14        100% Frontera SpA                          300


 
 51       
          CHILIS 15        100% Frontera SpA                          300


 
 52       
          CHILIS 16        100% Frontera SpA                          300


 
 53       
          CHILIS 17        100% Frontera SpA                          300


 
 54       
          CHILIS 18        100% Frontera SpA                          300


 
 55      
          CORTADERA 1       100% Frontera SpA                          200


 
 56      
          CORTADERA 2       100% Frontera SpA                          200


 
 57      
          CORTADERA 3       100% Frontera SpA                          200


 
 58      
          CORTADERA 4       100% Frontera SpA                          200


 
 59      
          CORTADERA 5       100% Frontera SpA                          200


 
 60                  CORTADERA 6 1/60 100% Frontera SpA                          265


 
 61                  CORTADERA 7 1/20 100% Frontera SpA                           93


 
 62          
          CRISTINA 1/40 100% Frontera SpA                           40


 
 63           
          DIABLITO 1/5 100% Frontera SpA                           25


 
 64                  DONA FELIPA 1/10 100% Frontera SpA                           50


 
 65        
          DORO 1          100% Frontera SpA                          200


 
 66        
          DORO 2          100% Frontera SpA                          200


 
 67        
          DORO 3          100% Frontera SpA                          300


 
 68                FALLA MAIPO 2 1/10 100% Frontera SpA                           99


 
 69                 FALLA MAIPO 3 1/8 100% Frontera SpA                           72


 
 70                FALLA MAIPO 4 1/26 100% Frontera SpA                           26


 
 71       
          MINORI 1         100% Frontera SpA                          300


 
 72       
          MINORI 2         100% Frontera SpA                          300


 
 73       
          MINORI 3         100% Frontera SpA                          300


 
 74       
          MINORI 4         100% Frontera SpA                          300


 
 75      
          PORFIADA B        100% Frontera SpA                          200


 
 76      
          PORFIADA D        100% Frontera SpA                          300


 
 77      
          PORFIADA G        100% Frontera SpA                          200


 
 78      
          PORFIADA I        100% Frontera SpA                          300


 
 79      
          PORFIADA II       100% Frontera SpA                          300


 
 80     
          PORFIADA III       100% Frontera SpA                          300


 
 81      
          PORFIADA IV       100% Frontera SpA                          300


 
 82      
          PORFIADA V        100% Frontera SpA                          200


 
 83      
          PORFIADA VI       100% Frontera SpA                          100


 
 84      
          PORFIADA X        100% Frontera SpA                          200


 
 85    
          SAN ANTONIO 1       100% Frontera SpA                          200


 
 86    
          SAN ANTONIO 2       100% Frontera SpA                          200


 
 87    
          SAN ANTONIO 3       100% Frontera SpA                          300


 
 88    
          SAN ANTONIO 4       100% Frontera SpA                          300


 
 89    
          SAN ANTONIO 5       100% Frontera SpA                          300


 
 90            
          MARINA 1/10 100% Frontera SpA                          100


 
 91           
          CATITA V 1/9 100% Frontera SpA                            9


 
 92       
          CHILIS 19        100% Frontera SpA                          300


 
 93        
          PAULINA         100% Frontera SpA                          100


 
 94                   ARBOLEDA 7 1/25 100% Frontera SpA                          234             NSR 1%


 
 95                   NAVARRO 1 41/60 100% Frontera SpA                           81             NSR 1%


 
 96              
          WH 1 1/20 100% Frontera SpA                          100


                               TOTAL                                            19.177

Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited

Productora Project Tenements

                                
   
     Productora Project


        N°               License ID             HCH % Held   HCH % Earning        Area 
          
            Agreement Details
                                                                           (ha)


  
  1                ALGA 7 A 1/32      80% SMEA SpA                               89


  
  2     
       ALGA VI 4            100% SMEA SpA                                2


  
  3                 ALGA VI 5/24      80% SMEA SpA                               66


  
  4                  ARENA 1 1/6      80% SMEA SpA                               40


  
  5                 ARENA 2 1/17      80% SMEA SpA                              113


  
  6           AURO HUASCO 1A 1/8      80% SMEA SpA                               35


  
  7          CABRITO-CABRITO 1/9      80% SMEA SpA                               50


  
  8           CACHIYUYITO 1 1/20      80% SMEA SpA                              100


  
  9           CACHIYUYITO 2 1/60      80% SMEA SpA                              300


  
  10          CACHIYUYITO 3 1/60      80% SMEA SpA                              300


  
  11              CARMEN I, 1/50      80% SMEA SpA                              222


  
  12             CARMEN II, 1/60      80% SMEA SpA                              274


  
  13      
       CF 12            100% Frontera SpA                            100


  
  14      
       CF 13            100% Frontera SpA                            200


  
  15      
       CF 14            100% Frontera SpA                            300


  
  16      
       CHICA               80% SMEA SpA                                1


  
  17                 CHOAPA 1/10      80% SMEA SpA                               50


  
  18               CUENCA A 1/51      80% SMEA SpA                              255


  
  19               CUENCA B 1/28      80% SMEA SpA                              139


  
  20               CUENCA C 1/51      80% SMEA SpA                              255


  
  21    
       CUENCA D              80% SMEA SpA                                3


  
  22    
       CUENCA E              80% SMEA SpA                                1


  
  23          ELEONOR RIGBY 1/10   100% Frontera SpA                            100


  
  24                  ELQUI 1/14      80% SMEA SpA                               61


  
  25               ESPERANZA 1/5      80% SMEA SpA                               11


  
  26                 FRAN 1 1/60      80% SMEA SpA                              220


  
  27                FRAN 12 1/40      80% SMEA SpA                              200


  
  28                FRAN 13 1/40      80% SMEA SpA                              200


  
  29                FRAN 14 1/40      80% SMEA SpA                              200


  
  30                FRAN 15 1/60      80% SMEA SpA                              300


  
  31               FRAN 18, 1/60      80% SMEA SpA                              273


  
  32                 FRAN 2 1/20      80% SMEA SpA                              100


  
  33               FRAN 21, 1/46      80% SMEA SpA                              226


  
  34                 FRAN 3 1/20      80% SMEA SpA                              100


  
  35                 FRAN 4 1/20      80% SMEA SpA                              100


  
  36                 FRAN 5 1/20      80% SMEA SpA                              100


  
  37                 FRAN 6 1/26      80% SMEA SpA                              130


  
  38                 FRAN 7 1/37      80% SMEA SpA                              176


  
  39                 FRAN 8 1/30      80% SMEA SpA                              120


  
  40               JULI 10, 1/60      80% SMEA SpA                              300


  
  41               JULI 11, 1/60      80% SMEA SpA                              300


  
  42               JULI 12, 1/42      80% SMEA SpA                              210


  
  43               JULI 13, 1/20      80% SMEA SpA                              100


  
  44               JULI 14, 1/50      80% SMEA SpA                              250


  
  45               JULI 15, 1/55      80% SMEA SpA                              275


  
  46                JULI 16 1/60      80% SMEA SpA                              300


  
  47                JULI 17 1/20      80% SMEA SpA                              100


  
  48                JULI.19 1/60      80% SMEA SpA                              300


  
  49                JULI.20 1/60      80% SMEA SpA                              300


  
  50                JULI 21 1/60      80% SMEA SpA                              300


  
  51                JULI.22 1/60      80% SMEA SpA                              300


  
  52                JULI 23 1/60      80% SMEA SpA                              300


  
  53                JULI 24 1/60      80% SMEA SpA                              300


  
  54                JULI.25 1/60      80% SMEA SpA                              300


  
  55             JULI 27 B, 1/10      80% SMEA SpA                               48


  
  56               JULI 27, 1/30      80% SMEA SpA                              146


  
  57               JULI 28, 1/60      80% SMEA SpA                              300


  
  58                JULI 9, 1/60      80% SMEA SpA                              300


  
  59            JULIETA 10, 1/60      80% SMEA SpA                              300


  
  60             JULIETA 11 1/60      80% SMEA SpA                              300


  
  61             JULIETA 12 1/60      80% SMEA SpA                              300


  
  62             JULIETA 13 1/60      80% SMEA SpA                              298


  
  63             JULIETA 14 1/60      80% SMEA SpA                              269


  
  64             JULIETA 15 1/40      80% SMEA SpA                              200


  
  65             JULIETA 16 1/40      80% SMEA SpA                              200


  
  66             JULIETA 17 1/40      80% SMEA SpA                              200


  
  67             JULIETA 18 1/40      80% SMEA SpA                              200


  
  68              JULIETA 5 1/40      80% SMEA SpA                              200


  
  69              JULIETA 6 1/40      80% SMEA SpA                              200


  
  70              JULIETA 7 1/60      80% SMEA SpA                              300


  
  71                  JULITA 1/4      80% SMEA SpA                                4


  
  72                LEONA 2A 1/4      80% SMEA SpA                               10


  
  73                 LIMARI 1/15      80% SMEA SpA                               66


  
  74          
          LOA 1/6      80% SMEA SpA                               30


  
  75                  MAIPO 1/10      80% SMEA SpA                               50


  
  76                 MONTOSA 1/4      80% SMEA SpA                               35                                         NSR 3%


  
  77           ORO INDIO 1A 1/20      80% SMEA SpA                               82


  
  78              PEGGY SUE 1/10   100% Frontera SpA                            100


  
  79             PRODUCTORA 1/16      80% SMEA SpA                               75


  
  80                 TOLTEN 1/14      80% SMEA SpA                               70


  
  81                 URANIO 1/70                    0 %                         350         25-year Lease Agreement US$250,000 per
                                                                                                                year
                                                                                        (average for the 25 year term); plus 2%
                                                                                                       NSR all but
                                                                                         gold; 4% NSR gold; 5% NSR non-metallic


  
  82                 ZAPA 1 1/10      80% SMEA SpA                              100


  
  83         
          ZAPA 1/6      80% SMEA SpA                                6                                         GSR 1%


  
  84                 ZAPA 3 1/23      80% SMEA SpA                               92


  
  85                ZAPA 5A 1/16      80% SMEA SpA                               80


  
  86                 ZAPA 7 1/24      80% SMEA SpA                              120


  
  87          SIERRA SOLIS 1         100% SMEA SpA                              200


  
  88          SIERRA SOLIS 2         100% SMEA SpA                              300


  
  89          SIERRA SOLIS 3         100% SMEA SpA                              300


  
  90          SIERRA SOLIS 4         100% SMEA SpA                              200


  
  91          SIERRA SOLIS 5         100% SMEA SpA                              300


  
  92          SIERRA SOLIS 6         100% SMEA SpA                              300


  
  93          SIERRA SOLIS 7         100% SMEA SpA                              300


  
  94          SIERRA SOLIS 8         100% SMEA SpA                              300


  
  95    
       ZAPALLO 1            100% SMEA SpA                              100


  
  96    
       ZAPALLO 2            100% SMEA SpA                              200


  
  97    
       ZAPALLO 3            100% SMEA SpA                              200


  
  98                 HWZC 1 1/14     100% SMEA SpA                               98


  
  99            BUENA SUERTE 1/6     100% SMEA SpA                               30


 
  100        
          PILAR 1/2     100% SMEA SpA                               10


 
  101            BIGOTES 10           100% SMEA SpA                              200


                            TOTAL                                               17.516

Note: SMEA SpA is subsidiary company - 80% owned by Hot Chili Limited, 20% owned by CMP (Compañía Minera del Pacífico)
Note: Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

Domeyko Project Tenements

                                   
  
      Domeyko Project


      N°                   License ID             HCH % Held         HCH % Earning        Area 
          
            Agreement Details
                                                                                   (ha)


 
 1                   ANTONIO 1 1/56                        100% Frontera SpA             280            100% HCH Domeyko Purchase Option
                                                                                                                     Agreement
                                                                                                     US$320,000 (already satisfied)
                                                                                                 US$200,000  payable by April 19th 2027
                                                                                               US$3.480,000  payable by April 19th 2028
                                                                                                                                       NSR 1%


 
 2          
          ANTONIO 1/40                        100% Frontera SpA             200


 
 3                  ANTONIO 10 1/21                        100% Frontera SpA              63


 
 4                  ANTONIO 19 1/30                        100% Frontera SpA             128


 
 5                  ANTONIO 21 1/20                        100% Frontera SpA              60


 
 6                  ANTONIO 36 1/15                        100% Frontera SpA              74


 
 7                   ANTONIO 5 1/40                        100% Frontera SpA             200


 
 8                   ANTONIO 9 1/40                        100% Frontera SpA             193


 
 9       
          CAZURRO 1                              100% Frontera SpA             200


 
 10      
          CAZURRO 2                              100% Frontera SpA             200


 
 11      
          CAZURRO 3                              100% Frontera SpA             300


 
 12      
          CAZURRO 4                              100% Frontera SpA             300


 
 13      
          CAZURRO 5                              100% Frontera SpA             100


 
 14      
          CAZURRO 6                              100% Frontera SpA             200


 
 15      
          CAZURRO 7                              100% Frontera SpA             200


 
 16      
          CAZURRO 8                              100% Frontera SpA             200


 
 17    
          CERRO MOLY 1                             100% Frontera SpA             300


 
 18    
          CERRO MOLY 2                             100% Frontera SpA             300


 
 19    
          CERRO MOLY 3                             100% Frontera SpA             300


 
 20    
          CERRO MOLY 4                             100% Frontera SpA             300


 
 21                  CAZURRO 3 1/60                        100% Frontera SpA             300


 
 22                  CAZURRO 4 1/60                        100% Frontera SpA             300


 
 23                  CAZURRO 7 1/40                        100% Frontera SpA             200


 
 24         
          EMILIO 1 1/8                        100% Frontera SpA              38


 
 25         
          EMILIO 3 1/9                        100% Frontera SpA              45


 
 26            
          INES 1/40                        100% Frontera SpA             200


 
 27           
          LORENA 1/2                        100% Frontera SpA               2


 
 28                   MERCEDITA 1/7                        100% Frontera SpA              22


 
 29          
          PRIMO 1 1/6                        100% Frontera SpA              36


 
 30              SANTIAGUITO 5 1/24                        100% Frontera SpA             114


 
 31          DOMINOCEROS 1/20 (1/4)                        100% Frontera SpA              20          100% HCH Dominoceros Purchase Option
                                                                                                               Agreement
                                                                                                     US$320,000 (already satisfied)
                                                                                                     US$680,000 (already satisfied)
                                                                                               US$1,000,000 payable by October 25th 2026
                                                                                                  US$6,890,000  payable by October 25th
                                                                                                                  2027


 
 32      
          CF SUR 1          100% Frontera SpA                                  300


 
 33      
          CF SUR 2          100% Frontera SpA                                  300


 
 34      
          CF SUR 3          100% Frontera SpA                                  300


 
 35      
          CF SUR 4          100% Frontera SpA                                  300


 
 36      
          CF SUR 5          100% Frontera SpA                                  200


 
 37      
          CF SUR 6          100% Frontera SpA                                  300


 
 38      
          CF SUR 7          100% Frontera SpA                                  300


 
 39      
          CF SUR 8          100% Frontera SpA                                  300


 
 40      
          CF SUR 9          100% Frontera SpA                                  200


 
 41      
          CF SUR 10         100% Frontera SpA                                  200


 
 42      
          CF SUR 11         100% Frontera SpA                                  300


 
 43      
          CF SUR 12         100% Frontera SpA                                  300


 
 44      
          CF SUR 13         100% Frontera SpA                                  300


 
 45      
          CF SUR 14         100% Frontera SpA                                  300


 
 46      
          CF SUR 15         100% Frontera SpA                                  200


 
 47      
          CF SUR 16         100% Frontera SpA                                  300


 
 48      
          CF SUR 18         100% Frontera SpA                                  300


 
 49      
          CF SUR 19         100% Frontera SpA                                  300


 
 50      
          CF SUR 20         100% Frontera SpA                                  300


 
 51      
          CF SUR 21         100% Frontera SpA                                  300


 
 52      
          CF SUR 22         100% Frontera SpA                                  300


 
 53      
          CF SUR 23         100% Frontera SpA                                  200


 
 54      
          CF SUR 24         100% Frontera SpA                                  200


 
 55      
          CF SUR 25         100% Frontera SpA                                  300


 
 56      
          CF SUR 26         100% Frontera SpA                                  300


 
 57      
          CF SUR 28         100% Frontera SpA                                  200


 
 58      
          CF SUR 29         100% Frontera SpA                                  300


 
 59      
          CF SUR 31         100% Frontera SpA                                  300


 
 60      
          CF SUR 32         100% Frontera SpA                                  300


 
 61      
          CF SUR 33         100% Frontera SpA                                  300


 
 62      
          CF SUR 34         100% Frontera SpA                                  300


 
 63      
          CF SUR 35         100% Frontera SpA                                  300


 
 64            
          KRETA 1/4   100% Frontera SpA                                   16          The mining concession is included in
                                                                                                                     SanAntonio
                                                                                                       Purchase Option Agreement


 
 65       
          MARI 1           100% Frontera SpA                                  300


 
 66            
          MARI 1/12   100% Frontera SpA                                   64        The mining concession is included in San
                                                                                                                      Antonio
                                                                                                       Purchase Option Agreement


 
 67       
          MARI 6           100% Frontera SpA                                  300


 
 68       
          MARI 8           100% Frontera SpA                                  300


 
 69      
          PAJONALES         100% Frontera SpA                                  300


 
 70             PORFIADA SUR 1 1/60   100% Frontera SpA                                  300          The mining concession is included in
                                                                                                                     SanAntonio
                                                                                                       Purchase Option Agreement


 
 71             PORFIADA SUR 2 1/60   100% Frontera SpA                                  300          The mining concession is included in
                                                                                                                     SanAntonio
                                                                                                       Purchase Option Agreement


 
 72             PORFIADA SUR 3 1/40   100% Frontera SpA                                  200          The mining concession is included in
                                                                                                                     SanAntonio
                                                                                                       Purchase Option Agreement


 
 73             PORFIADA SUR 4 1/60   100% Frontera SpA                                  300          The mining concession is included in
                                                                                                                     SanAntonio
                                                                                                       Purchase Option Agreement


                              TOTAL                                                     16.655

Note: Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

El Fuego Project Tenements

                            
   
     San Antonio Project


      N°             License ID             HCH % Held    HCH % Earning       Area    
          
            Agreement Details
                                                                        (ha)


 
 1               MERCEDES 1/3   100% Frontera SpA                             50  
          100% HCH San Antonio Purchase Option
                                                                                                      Agreement
                                                                                             USD 4,400,000 already paid.
                                                                                    In September 2026, Frontera SpA exercised the
                                                                                        San Antonio Purchase Option Agreement.



                                                                                           (2 additional and conditional payments of
                                                                                   USD 2,000,000, each one, to be paid by December
                                                                                                       31, 2030
                                                                                      under certain conditions detailed at title
                                                                                    "Tenement Changes During the Quarter" of this
                                                                                                  quarterly report.)


 
 2            PORFIADA A 1/33   100% Frontera SpA                            160


 
 3            PORFIADA C 1/60   100% Frontera SpA                            300


 
 4            PORFIADA E 1/20   100% Frontera SpA                            100


 
 5            PORFIADA F 1/50   100% Frontera SpA                            240


 
 6           PORFIADA IX 1/60   100% Frontera SpA                            300


 
 7          PORFIADA VII 1/60   100% Frontera SpA                            270


 
 8         PORFIADA VIII 1/60   100% Frontera SpA                            300


 
 9     
      PRIMA 1           100% Frontera SpA                              1


 
 10    
      PRIMA 2           100% Frontera SpA                              2


 
 11               ROMERO 1/31   100% Frontera SpA                             31


 
 12           SAN ANTONIO 1/5   100% Frontera SpA                             25


 
 13          SAN JUAN SUR 1/5   100% Frontera SpA                             10


 
 14         SAN JUAN SUR 6/23   100% Frontera SpA                             90


 
 15           SANTIAGO Z 1/30   100% Frontera SpA                            300


 
 16      SANTIAGO 1/4 Y 20      100% Frontera SpA                             75


 
 17            SANTIAGO 15/19   100% Frontera SpA                             25


 
 18            SANTIAGO 21/36   100% Frontera SpA                             76


 
 19            SANTIAGO 37/43   100% Frontera SpA                             26


 
 20          SANTIAGO A, 1/26   100% Frontera SpA                            244


 
 21          SANTIAGO B, 1/20   100% Frontera SpA                            200


 
 22          SANTIAGO C, 1/30   100% Frontera SpA                            300


 
 23          SANTIAGO D, 1/30   100% Frontera SpA                            300


 
 24          SANTIAGO E, 1/30   100% Frontera SpA                            300


                        TOTAL                                                3.725

Note: Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

                            
   
 Cordillera Project


      N°             License ID         HCH % Held           HCH % Earning      Area                       Agreement Details
                                                                           (ha)


 
 1          ALBORADA III 1/35                      100% Frontera SpA           162         100% HCH Purchase Option Agreement
                                                                                            USD 100,000 already paid
                                                                                       US$100,000 payable by November 14th
                                                                                                      2026
                                                                                       US$100,000 payable by November 14th
                                                                                                      2027
                                                                                     US$3,700,000 payable by November 14th
                                                                                                      2028
                                                                                     NSR 1% for underground mining and 1,5%
                                                                                                       for
                                                                                                open-pit mining


 
 2           ALBORADA IV 1/20                      100% Frontera SpA            54


 
 3          ALBORADA VII 1/25                      100% Frontera SpA            95


 
 4     
          CAT IX 1/30                      100% Frontera SpA           150


 
 5             CATITA IX 1/20                      100% Frontera SpA           100


 
 6            CATITA XII 1/13                      100% Frontera SpA            61


 
 7             CORDILLERA 1/5                      100% Frontera SpA            20


 
 8              HERREROS 1/14                      100% Frontera SpA            28


 
 9      MINA HERREROS III 1/6                      100% Frontera SpA            18


 
 10     MINA HERREROS IV 1/10                      100% Frontera SpA            23


 
 11             PORSIACA 1/20                      100% Frontera SpA            20


 
 12             QUEBRADA 1/10                      100% Frontera SpA            28


 
 13      
          VETA 1/17                      100% Frontera SpA            17


                        TOTAL                                                    776

Note: Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

Qualifying Statements

The scientific and technical information relating to the Company's Costa Fuego project in this report has been derived from or is based on the Costa Fuego Copper project pre-feasibility study (the "Costa Fuego PFS" or 2025 PFS), which has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and Joint Ore Reserves Committee of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (the "JORC Code") and reviewed and approved by the "Qualified Persons" as defined under NI 43-101 and "Competent Persons" as defined under the JORC Code, as set out below. The 2025 PFS was compiled by the Qualified Persons and Competent Persons listed below based on information available up to the effective date of the PFS. Additional details of responsibilities are provided at page 48 of presentation "Costa Fuego Preliminary Feasibility Study March 2025" released on March 27, 2025.

Conceptual Open Pit Shells

Conceptual open pit shells represent Exploration Targets as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code). They are based on completed exploration activities reported in the announcement released 19 May 2025 ('Hot Chili Announces Latest Drill Results for La Verde, Doubling Porphyry Discovery Footprint').

The conceptual open pit shells were generated using copper (Cu) prices of US$3.50/lb Cu and US$6.00/lb Cu on a series of nested Cu grade shells. Other input parameters informing the conceptual open-pit shells (pit slope angles, mining cost, processing cost, etc.) were derived from values reported in the March 2025 Costa Fuego Pre-feasibility Study and are considered appropriate for the style of mineralisation encountered at the La Verde Cu-Au porphyry discovery.

Any potential quantity and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Further exploration activities are detailed in this announcement and include (but may not necessarily be limited to) a program of diamond drill holes aiming to extend the mineralised footprint at La Verde. Drilling commenced on 22 September 2025, with the length of the program dependent on a number of considerations including (but not limited to) the results of the exploration activities and regulatory applications and approvals.

PFS Technical Report

For readers to fully understand the information in this report, they should read the PFS Technical Report available on SEDAR+ (www.sedarplus.ca) and at www.hotchili.net.au in its entirety titled "Costa Fuego Project, Chile, Preliminary Feasibility Study NI 43-101 Technical Report" dated May 9 2025 with an effective date of March 27 2025, including all qualifications, assumptions, limitations and exclusions. The PFS Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The technical information in this report is subject to the assumptions and qualifications to be contained in the PFS Technical Report. The PFS Technical Report replaces and supersedes the technical report titled "Costa Fuego Copper Project - NI 43-101 Technical Report Mineral Resource Estimate Update" dated April 8, 2024, with an effective date of February 26, 2024 (the "2024 PEA").

Qualified Persons - NI 43-101

The PFS was compiled by Wood Australia Pty Ltd with contributions from a team of independent "Qualified Persons" within the meaning of NI 43 -101. The scientific and technical information contained in this report pertaining to Costa Fuego has been reviewed and verified by the following independent qualified persons within the meaning of NI 43-101:

  • Ms Elizabeth Haren (FAUSIMM (CP) & MAIG) of Haren Consulting - Mineral Resource Estimate
  • Mr Dean David (FAUSIMM (CP)) of Wood Pty Ltd - Metallurgy
  • Mr Piers Wendlandt (PE) of Wood Pty Ltd - Market Studies and Contracts, Economic Analysis
  • Mr David Cuello (MAUSIMM) of GMT Servicios de Ingeniería - Geotechnical
  • Mr Jeffrey Stevens (Pr. Eng, MSAIMM) of Wood Pty Ltd - Infrastructure and Capital Cost
  • Mr Luis Bernal (Comisión Minera (PC) Registered Member) of Process Mineral Consulting - Leaching
  • Mr Anton von Wielligh (FAUSIMM) of ABGM Consulting Pty Ltd - Mine Planning and Scheduling
  • Mr Edmundo LaPorte (PE, PEng, CPEng, SME Registered Member) of High River Services - Environmental

The above independent Qualified Persons have verified the information disclosed herein, including the sampling, preparation, security, and analytical procedures underlying such information.

Competent Persons - JORC

The information in this report that relates to Mineral Resources, Exploration Results, and Ore Reserves for the Costa Fuego Project is based on information compiled by:

  • Ms Elizabeth Haren (FAUSIMM (CP) & MAIG) who is a full-time employee of Haren Consulting - Mineral Resource Estimate
  • Mr Dean David (FAUSIMM (CP)) who is a full-time employee of Wood Pty Ltd - Metallurgy
  • Mr Piers Wendlandt (PE) who is a full-time employee of Wood Pty Ltd - Market Studies and Contracts, Economic Analysis
  • Mr David Cuello (MAUSIMM) who is a full-time employee of GMT Servicios de Ingeniería - Geotechnical
  • Mr Jeffrey Stevens (Pr. Eng, MSAIMM) who is a full-time employee of Wood Pty Ltd - Infrastructure and Capital Cost
  • Mr Luis Bernal (Comisión Minera (PC) Registered Member) who is a full-time employee of Process Mineral Consulting - Leaching
  • Mr Anton von Wielligh (FAUSIMM) who is a full-time employee of ABGM Consulting Pty Ltd - Mine Planning and Scheduling
  • Mr Edmundo LaPorte (PE, PEng, CPEng, SME Registered Member) who is a full-time employee of High River Services - Environmental
  • Mr Christian Easterday (MAIG), who is the Managing Director and is a full-time employee of Hot Chili Limited - Exploration Results

Ms Haren, Mr David, Mr Wendlandt, Mr Cuello, Mr Stevens, Mr Bernal, Mr LaPorte, Mr Easterday, and Mr von Wielligh each have sufficient experience, which is relevant to the style of mineralisation and types of deposits under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the JORC Code and as Qualified Persons under NI43-101.

Disclaimer

This report has been prepared by management of Hot Chili Limited ("Hot Chili" or the "Company") and does not represent a recommendation to buy or sell securities of the Company. Investors should always consult their investment advisors prior to making any investment decisions. This report does not purport to be complete or contain all of the information that may be material to the current or future business, operations, financial condition or prospects of the Company and Hot Chili makes no representation or warranty, express or implied, as to the accuracy or completeness of the information contained in this report. Certain information contained herein is based on, or derived from, information obtained from independent third-party sources, publicly available reports and other trade and industry sources. Hot Chili believes that such information is accurate and that the sources from which it has been obtained are reliable; however, Hot Chili has not independently verified such information and does not assume any responsibility for the accuracy or completeness of such information. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note for U.S. Investors Concerning Mineral Resources

NI 43-101 is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning material mineral projects. Technical disclosure contained in this report has been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Classification System. These standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and technical information contained in this report may not be comparable to similar information disclosed by domestic United States companies subject to the SEC's reporting and disclosure requirements.

All amounts in this report are in U.S. dollars unless otherwise noted.

Forward Looking Statements

This report contains certain statements that are "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of applicable Australian securities legislation (collectively, the "forward-looking statements"). Forward-looking statements reflect the Company's current expectations, forecasts, and projections with respect to future events, many of which are beyond the Company's control, and are based on certain assumptions. No assurance can be given that these expectations, forecasts, or projections will prove to be correct, and such forward-looking statements included in this announcement should not be unduly relied upon. Forward-looking information is by its nature prospective and requires the Company to make certain assumptions and is subject to inherent risks and uncertainties. All statements other than statements of historical fact are forward-looking statements. The use of any of the words "capable", "estimate", "expansion", "expectations", "likely", "may", "plan", "potential", "project", "reinforce", "large-scale", "could", "should", "will", "would", variants of these words and similar expressions are intended to identify forward-looking statements.

In this report, forward-looking statements relate, among other things, to: the potential of the La Verde discovery; regulatory applications and approvals; and the Company's future exploration and other business plans.

Forward-looking statements involve known and unknown risks, uncertainties, and other factors, which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. A number of factors could cause actual results to differ materially from a conclusion, forecast or projection contained in the forward-looking statements in this announcement, including, but not limited to, the following material factors: the ability of drilling and other exploration activities to accurately predict mineralisation; operational risks; risks related to the cost estimates of exploration; sovereign risks associated with the Company's operations in Chile; changes in estimates of mineral resources or mineral reserves of properties where the Company holds interests; recruiting qualified personnel and retaining key personnel; future financial needs and availability of adequate financing; fluctuations in mineral prices; market volatility; exchange rate fluctuations; ability to exploit successful discoveries; the production at or performance of properties where the Company holds interests; ability to retain title to mining concessions; environmental risks; financial failure or default of joint venture partners, contractors or service providers; competition risks; economic and market conditions; and other risks and uncertainties described elsewhere in this announcement and elsewhere in the Company's public disclosure record.

Although the forward-looking statements contained in this report are based upon assumptions which the Company believes to be reasonable, the Company cannot assure investors that actual results will be consistent with these forward-looking statements. With respect to forward-looking statements contained in this announcement, the Company has made assumptions regarding: future commodity prices and demand; availability of skilled labour; timing and amount of capital expenditures; future currency exchange and interest rates; the impact of increasing competition; general conditions in economic and financial markets; availability of drilling and related equipment; effects of regulation by governmental agencies; the timely receipt of permits and approvals; metallurgical recoveries for La Verde based on Cortadera as a proxy; that pending assays will be received and reported on anticipated timelines; that drill density will be sufficient to support a mineral resource estimate; future tax rates; future operating costs; availability of future sources of funding; and ability to obtain financing; and assumptions underlying estimates related to adjusted funds from operations.

The Company has included the above summary of assumptions and risks related to forward-looking information provided in this announcement to provide investors with a more complete perspective on the Company's future operations, and such information may not be appropriate for other purposes. The Company's actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward-looking statements and, accordingly, no assurance can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what benefits the Company will derive therefrom.

For additional information with respect to these and other factors and assumptions underlying the forward-looking statements made herein, please refer to the public disclosure record of the Company, including the Company's most recent Annual Report, which is available on SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. New factors emerge from time to time, and it is not possible for management to predict all those factors or to assess in advance the impact of each such factor on the Company's business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in any forward-looking statement.

The forward-looking statements contained in this announcement are expressly qualified by the foregoing cautionary statements and are made as of the date of this announcement. Except as may be required by applicable securities laws, the Company does not undertake any obligation to publicly update or revise any forward-looking statement to reflect events or circumstances after the date of this announcement or to reflect the occurrence of unanticipated events, whether as a result of new information, future events or results, or otherwise. Investors should read this entire announcement and consult their own professional advisors to ascertain and assess the income tax and legal risks and other aspects of an investment in the Company.

Mineral Resource Statement
Costa Fuego Combined Mineral Resource (Effective Date 26 February 2024)

 
  1   Mineral Resources are reported on a 100% Basis -combining Mineral Resource Estimates for the Cortadera, Productora, Alice and San Antonio deposits. All figures are rounded, reported to
         appropriate significant figures and reported in accordance with the Joint Ore Reserves Committee Code (2012) and NI 43-101. Mineral Resource estimation practices are in accordance with CIM
         Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (29 November 2019) and reported in accordance CIM Definition Standards for Mineral Resources and Mineral Reserves
         (10 May 2014) that are incorporated by reference into NI 43-101.


 
  2 
 Mineral Resources are inclusive of the Mineral Reserve


 
  3   The Productora deposit is 100% owned by Chilean incorporated company Sociedad Minera El Aguila SpA (SMEA). SMEA is a joint venture (JV) company - 80% owned by Sociedad Minera El Corazón SpA (a
         100% subsidiary of Hot Chili), and 20% owned by Compañía Minera del Pacífico S.A (CMP).


 
  4   The Cortadera deposit is controlled by a Chilean incorporated company Sociedad Minera La Frontera SpA (Frontera). Frontera is a subsidiary company - 100% owned by Sociedad Minera El Corazón
         SpA, which is a 100% subsidiary of Hot Chili.


 
  5   The San Antonio deposit is controlled through Frontera (100% owned by Sociedad Minera El Corazón SpA, which is a 100% subsidiary of Hot Chili Limited) and Frontera is party to an Option
         Agreement pursuant to which it can earn a 100% interest in the property.


 
  6   The Mineral Resource Estimates (MRE) in the tables above form coherent bodies of mineralisation that are considered amenable to a combination of open pit and underground extraction methods
         based on the following parameters: Base Case Metal Prices: Copper US$ 3.00/lb, Gold US$ 1,700/oz, Molybdenum US$ 14/lb, and Silver US$20/oz.


 
  7   All MRE were assessed for Reasonable Prospects of Eventual Economic Extraction (RPEEE) using both Open Pit and Block Cave Extraction mining methods at Cortadera and Open Pit mining methods at
         the Productora, Alice and San Antonio deposits.


 
  8   Metallurgical recovery averages for each deposit consider Indicated + Inferred material and are weighted to combine sulphide flotation and oxide leaching performance. Process recoveries:
         Cortadera - Weighted recoveries of 82% Cu, 55% Au, 81% Mo and 36% Ag. CuEq(%) = Cu(%) + 0.55 x Au(g/t) + 0.00046 x Mo(ppm) + 0.0043 x Ag(g/t). San Antonio -Weighted recoveries of 85% Cu,
         66% Au, 80% Mo and 63% Ag. CuEq(%) = Cu(%) + 0.64 x Au(g/t) + 0.00044 x Mo(ppm) + 0.0072 x Ag(g/t) Alice -Weighted recoveries of 81% Cu, 47% Au, 52% Mo and 37% Ag. CuEq(%) = Cu(%) + 0.48 x
         Au(g/t) + 0.00030 x Mo(ppm) + 0.0044 x Ag(g/t). Productora - Weighted recoveries of 84% Cu, 47% Au, 48% Mo and 18% Ag. CuEq(%) = Cu(%) + 0.46 x Au(g/t) + 0.00026 x Mo(ppm) + 0.0021 x Ag(g/
         t). Costa Fuego - Recoveries of 83% Cu, 53% Au, 71% Mo and 26% Ag. CuEq(%) = Cu(%) + 0.53 x Au(g/t) + 0.00040 x Mo(ppm) + 0.0030 x Ag(g/t)


 
  9   Copper Equivalent (CuEq) grades are calculated based on the formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery) + (Mo ppm × Mo price per g/t × Mo_recovery) + (Au ppm × Au price per
         g/t × Au_recovery) + (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne × Cu recovery). The base case cut-off grade for Mineral Resources considered amenable to open pit
         extraction methods at the Cortadera, Productora, Alice and San Antonio deposits is 0.20% CuEq, while the cut-off grade for Mineral Resources considered amenable to underground extraction
         methods at the Cortadera deposit is 0.27% CuEq. It is the Company's opinion that all the elements included in the CuEq calculation have a reasonable potential to be recovered and sold.



  10   Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The MRE include Inferred Mineral Resources that are considered too speculative geologically to have
         economic considerations applied to them that would enable them to be categorised as Mineral Reserves. It is reasonably expected that the majority of Inferred mineral resources could be
         upgraded to Measured or Indicated Mineral Resources with continued exploration.



  11   The effective date of the MRE is 26 February 2024. The MRE was previously reported in the 2024 PEA. Hot Chili Limited confirms it is not aware of any new information or data that materially
         affects the information included in the 2024 PEA and all material assumptions and technical parameters stated for the MRE in the 2024 PEA continue to apply and have not materially changed.



  12   Hot Chili Limited is not aware of political, environmental, or other risks that could materially affect the potential development of the Mineral Resources other than as disclosed in the 2025
         PFS. A detailed list of Costa Fuego Project risks is included in Chapter 25 of the 2025 PFS Technical Report titled "Costa Fuego Copper Project NI43-101 Technical Report Preliminary
         Feasibility Study" and dated 9 May 2025 (effective 27 March 2025), is available on SEDAR+ (www.sedarplus.ca) and the Company's website (www.hotchili.net.au).

Ore Reserve Statement
Costa Fuego Combined Ore Reserve (Effective Date 27 March 2025)

 
  1   Mineral Reserves are reported on a 100% Basis -combining Mineral Reserve estimates for the Cortadera, Productora, Alice and San Antonio deposits, and have an effective date of 27 March 2025.


 
  2   An Ore Reserve (declared in accordance with JORC Code 2012) was previously reported at Productora, a component of Costa Fuego, on 2nd March 2016 on the ASX. The Company was not subject to the
         requirements of NI 43-101 at that time.


 
  3   Mineral Reserve estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (29 November 2019) and reported in accordance CIM
         Definition Standards for Mineral Resources and Mineral Reserves (10 May 2014) that are incorporated by reference into NI 43-101. Mineral Reserve estimates are in accordance with the JORC Code.
          References to "Mineral Reserves" mean "Ore Reserves" as defined in the JORC Code and references to "Proven Mineral Reserves" mean "Proved Ore Reserves" as defined in the JORC Code.


 
  4 
 The Mineral Reserve reported above was not additive to the Mineral Resource. The Mineral Reserve is based on the 26 February 2024 Mineral Resource.


 
  5   Tonnages and grades are rounded to two significant figures. All figures are rounded, reported to appropriate significant figures and reported in accordance with the Joint Ore Reserves Committee
         Code (2012) and NI 43-101. As each number is rounded individually, the table may show apparent inconsistencies between the sum of rounded components and the corresponding rounded total.


 
  6 
 Mineral Reserves are reported using long-term metal prices of US$4.30/lb Cu, US$2,280/oz Au, US$27/oz Ag, US$20/lb Mo.


 
  7   The Mineral Reserve tonnages and grades are estimated and reported as delivered to plant (the point where material is delivered to the processing facility) and is therefore inclusive of ore
         loss and dilution.


 
  8   The Productora deposit is 100% owned by Chilean incorporated company Sociedad Minera El Aguila SpA (SMEA). SMEA is a joint venture (JV) company - 80% owned by Sociedad Minera El Corazón SpA (a
         100% subsidiary of Hot Chili), and 20% owned by Compañía Minera del Pacífico S.A (CMP).


 
  9   The Cortadera deposit is controlled by a Chilean incorporated company Sociedad Minera La Frontera SpA (Frontera). Frontera is a subsidiary company - 100% owned by Sociedad Minera El Corazón
         SpA, which is a 100% subsidiary of Hot Chili.



  10   The San Antonio deposit is controlled through Frontera (100% owned by Sociedad Minera El Corazón SpA, which is a 100% subsidiary of Hot Chili) and Frontera is party to an Option Agreement
         pursuant to which it can earn a 100% interest in the property.



  11   The Mineral Reserve Estimate as of 27 March 2025 for Costa Fuego was prepared by Anton von Wielligh, Fellow with the AUSIMM (FAUSIMM). Mr. von Wielligh fulfils the requirements to be a
         "Qualified Person" within the meaning of NI 43-101 and is the Competent Person under JORC for the Mineral Reserve.



  12   Hot Chili Limited is not aware of political, environmental, or other risks that could materially affect the potential development of the Mineral Reserves other than as disclosed in the 2025
         PFS. A detailed list of Costa Fuego Project risks is included in Chapter 25 of the 2025 PFS Technical Report titled "Costa Fuego Copper Project NI43-101 Technical Report Preliminary
         Feasibility Study" and dated 9 May 2025 (effective 27 March 2025), is available on SEDAR+ (www.sedarplus.ca) and the Company's website (www.hotchili.net.au).

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report


  Name of entity



 
            Hot Chili Limited





  ABN                           Quarter ended ("current quarter")


                  91 130 955 725             30 September 2026


 
 
 Consolidated statement of cash flows                                                       Current                           Year to
                                                                                                 quarter                             date
                                                                                                                $A'000 (3 months)
                                                                                                                                           $A'000


                
          
            1.                                        Cash flows from operating activities


                            
          1.1 
          Receipts from customers


                            
          1.2 
          Payments for


                                           
          (a)  exploration & evaluation


                                           
          (a)  development


                                           
          (b)  production


                                           
          (c)  staff costs                                                             (1,250)   (1,250)


                                                      (d)  administration and corporate costs                                      (1,538)   (1,538)


                            
          1.3 
          Dividends received (see note 3)


                            
          1.4 
          Interest received                                                                183        183


                            
          1.5            Interest and other costs of finance paid


                            
          1.6 
          Income taxes paid


                            
          1.7 
          Government grants and tax incentives


                            
          1.8 
          Other (provide details if material)


               
          
            1.9                         Net cash from /(used in) operating activities                   (2,605)   (2,605)




                
          
            2.                         Cash flows from investing activities


                            
          2.1 
          Payments to acquire or for:


                                           
          (a)  entities


                                           
          (b)  tenements                                                               (3,371)   (3,371)


                                           
          (c)  property, plant and equipment                                             (136)     (136)


                                           
          (d)  exploration & evaluation                                               (10,144)  (10,144)


                                           
          (e)  investments


                                           
          (f)  other non-current assets


                            
          2.2 
          Proceeds from the disposal of:


                                           
          (a)  entities


                                           
          (b)  tenements


                                           
          (c)  property, plant and equipment


                                           
          (d)  investments


                                           
          (e)  other non-current assets


                            
          2.3            Cash flows from loans to other entities


                            
          2.4 
          Dividends received (see note 3)


                            
          2.5            Other (OR Royalty funds - net of costs)                                       20,435     20,435


               
          
            2.6                         Net cash from /(used in) investing activities                     6,784      6,784




                
          
            3.                         Cash flows from financing activities




                            
          3.1            Proceeds from issues of equity securities
                                           (excluding convertible debt securities)


                            
          3.2            Proceeds from issue of convertible debt
                                                       securities


                            
          3.3 
          Proceeds from exercise of options


                            
          3.4            Transaction costs related to issues of equity
                                           securities or convertible debt securities


                            
          3.5 
          Proceeds from borrowings


                            
          3.6 
          Repayment of borrowings


                            
          3.7            Transaction costs related to loans and borrowings


                            
          3.8 
          Dividends paid


                            
          3.9 
          Other (provide details if material)


              
          
            3.10                         Net cash from /(used in) financing activities




                
          
            4.                         Net increase /(decrease) in cash and
                                           cash equivalents for the period


                            
          4.1            Cash and cash equivalents at beginning of period                              24,948     24,948


                            
          4.2            Net cash from /(used in) operating activities
                                                       (item 1.9 above)                                                            (2,605)   (2,605)


                            
          4.3            Net cash from /(used in) investing activities
                                                       (item 2.6 above)                                                              6,784      6,784


                            
          4.4            Net cash from /(used in) financing activities
                                                       (item 3.10 above)


                            
          4.5            Effect of movement in exchange rates on cash held                                122        122


               
          
            4.6                         Cash and cash equivalents at end of period                       29,249     29,249

 
  
   5.                          Reconciliation of cash and cash equivalents Current  Previous
                                                                                 quarter  quarter
           at the end of the quarter (as shown in the                             $A'000   $A'000
           consolidated statement of cash flows) to the
           related items in the accounts


     
 5.1 
          Bank balances                                                8,841     5,428


     
 5.2 
          Call deposits                                               16,107    29,792


     
 5.3 
          Bank overdrafts


     
 5.4 
          Other (provide details)



  
   5.5 
          
            Cash and cash equivalents at end of            24,948    35,220
           quarter (should equal item 4.6 above)

 
          6.                                            Payments to related parties of the entity and their associates                         Current quarter
                                                                                                                                                        $A'000



          6.1    
          Aggregate amount of payments to related parties and their                                                                       234
                  associates included in item 1



          6.2    
          Aggregate amount of payments to related parties and their
                  associates included in item 2



          
            Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.


 
   7.                          Financing facilities                                         Total
                                                                                              facility             Amount drawn at
                      Note: the term "facility' includes all
                       forms of financing                                          amount at           quarter end
         arrangements available to the entity.                                    quarter end                               $A'000
          Add notes as necessary for an understanding
          of the                                                                                $A'000
         sources of finance available to the entity.


   
 7.1 
          Loan facilities


   
 7.2 
          Credit standby arrangements


   
 7.3 
          Other (please specify)


   
 7.4                         Total financing facilities




   
 7.5                         Unused financing facilities available at quarter end


   
 7.6            Include in the box below a description of each facility above,
                     including the lender, interest
          rate, maturity date and whether it is secured or unsecured. If any
          additional financing
          facilities have been entered into or are proposed to be entered into
          after quarter end,
         include a note providing details of those facilities as well.


          
            8.                                            Estimated cash available for future operating activities   
          
      
   $A'000


            
          8.1    
          Net cash from / (used in) operating activities (item 1.9)                                                    (2,605)


            
          8.2    
          (Payments for exploration & evaluation classified as investing                                              (10,144)
                              activities) (item 2.1(d))


            
          8.3    
          Total relevant outgoings (item 8.1 + item 8.2)                                                              (12,749)


            
          8.4    
          Cash and cash equivalents at quarter end (item 4.6)                                                           29,249


            
          8.5    
          Unused finance facilities available at quarter end (item 7.5)


            
          8.6    
          Total available funding (item 8.4 + item 8.5)                                                                 29,249




            
          8.7                            Estimated quarters of funding available (item 8.6 divided by                                       2.29
                              item 8.3)



          
            Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as "N/A".
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.


            
          8.8               If item 8.7 is less than 2 quarters, please provide answers to the following questions:


                                         8.8.1     Does the entity expect that it will continue to have the current level of net
                                          operating
                                           cash flows for the time being and, if not, why not?


                              
          Although the Company has reported more than two quarters of funding available, it
                              does not expect the current level of total cash outflows to continue.

                              
          The Company's payments for exploration & evaluation expenditure during the
                              quarter reflect the Phase 2 resource infill and extensional drilling program at La Verde,
                              which is scheduled for completion by the end of October 2026.

                              
          Following completion of this program, the Company anticipates a material reduction
                              in exploration and evaluation expenditure in subsequent quarters, resulting in a
                              reduction in overall cash outflows and an extension of its available cash runway.


                                         8.8.2     Has the entity taken any steps, or does it propose to take any steps, to raise
                                          further
                                           cash to fund its operations and, if so, what are those steps and how likely does it believe
                                            that
                                           they will be successful?


                                                                                                                                                        N/A


                                         8.8.3     Does the entity expect to be able to continue its operations and to meet its
                                          business
                                           objectives and, if so, on what basis?


                                                                                                                                                        N/A


                                                      Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above
                                                       must be answered.

Compliance statement
  1. This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
  2. This statement gives a true and fair view of the matters disclosed.

Date: 30 October 2026

Authorised by: By the Board

(Name of body or officer authorising release - see note 4)

     Notes



 1.         This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity's activities for the past quarter, how they have been
              financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
              encouraged to do so.



 2.         If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
              Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by
              ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.



 3.       
 Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.



 4.         If this report has been authorised for release to the market by your board of directors, you can insert here: "By the board". If it has been authorised for release to the market by a
              committee of your board of directors, you can insert here: "By the [name of board committee - eg Audit and Risk Committee]". If it has been authorised for release to the market by a
              disclosure committee, you can insert here: "By the Disclosure Committee".



 5.         If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate
              Governance Council's Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records
              of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that
              their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

For more information please contact: Christian Easterday, Managing Director & CEO - Hot Chili, Tel: +61 8 9315 9009, Email: admin@hotchili.net.au; Carol Marinkovich, Company Secretary - Hot Chili, Tel: +61 8 9315 9009, Email: cosec@hotchili.net.au; Graham Farrell, Investor & Public Relations, Email: graham@hotchili.net.au; or visit Hot Chili's website at www.hotchili.net.au

View original content to download multimedia:https://www.prnewswire.com/news-releases/hot-chili-limited---quarterly-report-period-ending-30-september-2026-302925410.html

SOURCE Hot Chili Limited

© 2026 Canjex Publishing Ltd. All rights reserved.