09:32:46 EDT Wed 22 Jul 2026
Enter Symbol
or Name
USA
CA



NordX Metals Confirms Uranium Mineralisation Across Three Swedish Projects with Initial Outcrop and Boulder Sampling

2026-07-22 07:01 ET - News Release

Vancouver, British Columbia--(Newsfile Corp. - July 22, 2026) - NordX Metals Corp. (CSE: NRDX) (OTCQB: NRDMF) (FSE: 0UL0) ("NordX" or the "Company") is pleased to announce the first assay results from the Norr Döttern, Märrviken and Flistjärn field reconnaissance and chip rock sampling programs. The results confirm high potential for uranium over the Company's three 100%-owned projects, as well as the potential for Au-base metal mineralisation in Märrviken. Work continues on these and other NordX properties with fieldwork progressing according to plan.

Surface Sampling Program Highlights

Norr Döttern Property:

  • High-Grade Uranium ("U3O8") identified with values up to 0.27% U3O8;

  • Program confirms mineralisation in areas rich with historical exploration data suggesting new target areas for systematic follow-up.

Märrviken Property:

  • Highly anomalous Gold ("Au"), Zinc ("Zn") and uranium results including assay results of 2.87 g/t Au, 37.7% Zn, and 682 ppm U3O8.

  • High-grade zinc values confirm polymetallic potential alongside the uranium mineralisation.

Flistjärn Property:

  • In situ rock chip sampling showed anomalous uranium values up to 442ppm U3O8;

  • Tested a parallel zone to the existing mineralised structure.

"These first assay results confirm extensive, anomalous uranium mineralisation across our Swedish portfolio, corroborating historical work by the Swedish government in the 1970s–80s. Norr Döttern is especially exciting, with drill-core intercepts up to 11.9m at 0.1% U3O8 and multiple undrilled boulder trains. With Märrviken's uranium-zinc-gold signature and Flistjärn's untested structural corridor, our priority now is converting these surface results into drill-ready targets," said Jonathon Franklin, President and Director of NordX.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/11951/306008_nordx_550.jpg

Figure 1. Map of the Norr Döttern Project showing boulder and outcrop uranium assays as coloured triangles and the five prospect areas as dashed rectangles (ND1 - Norr Döttern 1, ND 2 - Norr Döttern 2, KK - Kikkejaure Västra, LG - Långträsk, LS - Liessetjåkke, SR1 - Sör Döttern 1, SR2 - Sör Döttern), as well as historical works (SWEREF 99 TM coordinate system).

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11951/306008_nordx.jpg

Norr Döttern Project

A total of 22 samples (Fig. 1, Table 1) were collected in the Norr Döttern project area and sent to ALS Global laboratories for assay. The assay results for nine of the samples are still pending. The average grade of the thirteen analysed samples is 687 ppm U3O8 and ranged from a low of 6.5 ppm U3O8 to a high of 2735.7 ppm U3O8. The three best samples and their uranium grades are shown below:

  • M318460: 2,735.7 ppm U3O8
  • M318461: 2,128.5 ppm U3O8
  • M318458: 1,928.0 ppm U3O8

In addition, one sample returned anomalous Ag and Zn (M318456: 603.8 ppm U3O8, 64 ppm Ag, 1,500 ppm Zn).

Sample IDEastingNorthingLithologyOccurrence
type
Analytical Method
(ALS Global)
U3O8
ppm
Ag
ppm
M3184516703497295474EpisyeniteBoulderME-MS89L187.5<5
M3184526700147295789Feldspar PorphyryOutcropME-MS89L202.85
M3184536700157295789Felsic Volcanic OutcropME-MS89L343.1<5
M3184546700197295788Feldspar porphyry OutcropME-MS89L48.3<5
M3184556700137295792Granite OutcropME-MS89L6.5<5
M3184566706197296228Feldspar PorphyryOutcropME-MS89L603.864
M3184576706237296231Feldspar PorphyryOutcropME-MS89L61.6<5
M3184586734177299254Feldspar PorphyryBoulderME-MS89L1928.0<5
M3184596734387299228Feldspar PorphyryBoulderME-MS89L283.0<5
M3184606734597299191GraniteBoulderME-MS89L2735.7<5
M3184616734787299167GraniteBoulderME-MS89L2128.5<5
M3184626700777293476Felsic VolcanicOutcropME-MS89L30.5<5
M3184636703767293085Felsic Volcanic BoulderME-MS89L378.5<5

 

Table 1. Norr Döttern outcrop and boulder sampling geochemical assays (SWEREF 99 TM coordinate system).

About the Norr Döttern Project

The Norr Döttern licence, in Norrbotten County, covers an 8 km NE-SW structural corridor previously explored by state-owned companies SGU and SGAB between 1971-1985, when 35 diamond holes were drilled across three of five historically identified prospect areas (Fig. 1). Drilling intercepted up to 11.9m grading 0.1% U3O8 from 18.6m downhole at Långträsk ("LG"), open in all directions, and 4m at 0.19% U3O8 from 66m downhole at Norr Döttern 1 ("ND1"). The central prospects, and the source of a nearby boulder train that returned higher grades than the drilling, have never been drilled.

Mapping and chip rock sampling planned for Q3 2026 at Norr Döttern

The Norr Döttern 2 – Liessetjåkke (ND2-LS) prospect hosts the licence area's largest boulder trains, including an unverified historical trench report of 3% U over 3m. This undrilled area is the focus of a Q3 2026 mapping and scintillometer-guided chip sampling campaign, aimed at defining drill targets for a Q4 2026 - Q1 2027 winter drilling program.

Märrviken Project

A total of 15 samples (table 2) were collected in the Märrviken project area and sent to ALS Global laboratories for assay. Out of eight collected samples, results varied from a low of 1.9ppm U3O8 to a high of 681ppm U3O8, with the average being 398ppm U3O8. Out of seven collected samples the average grade for Zn in sulphide-hosted mineralization is 0.97%; results varied from a low of 50ppm Zn to a high of 37,799ppm (3.7% Zn) The best samples and their relevant results are:

  • MA012: 681.6ppm U3O8
  • MA013: 544.8ppm U3O8
  • MA011: 443.4ppm U3O8
  • MA005: 37.7% Zn, 160ppm Cu and 0.02ppm Au
  • MA004: 33.5% Zn, 470ppm Cu and 0.07ppm Au
  • MA003: 2.87 ppm Au, 0.21% Cu and 0.06% Zn
Sample IDEastingNorthingLithologyOccurrence
type
Analytical Method
(ALS Global)
U3O8
ppm
Au
ppm
Cu
ppm
Zn
ppm
MA0015003446904739Mg-rich paragneissOutcropME-MS61
Au-AA25
5.30.02121561
MA0025003436904737ParagneissOutcropME-MS61
Au-AA25
3.3N/A1231125
MA0035003496904732Oxidized sedimentaryOutcropME-MS612.72.872070570
MA0045003466904730Massive sulphideOutcropME-ICPOREN/A0.0747033500
MA0055003486904727Massive sulphideOutcropME-ICPORE
Au-AA25
N/A0.0216037700
MA0065003476904727Biotite schistOutcropME-MS61
Au-AA25
6.80.042432590
MA0075003416904730Felsic gniessOutcropME-MS61
Au-AA25
8.8N/A21.6590
MA0085003216904710Massive sulphideBoulderME-MS61
Au-AA25
1.90.02159700
MA0095021796907568PegmatiteBoulderME-MS89L
Au-AA25
389.1N/A<2080
MA0105021696907577Brecciated pegmatiteBoulderME-MS89L
Au-AA25
184.5N/A<2050
MA0115021596907592Brecciated pegmatiteBoulderME-MS89L
Au-AA25
443.4N/A<2080
MA0125020966907891Mafic sedimentaryBoulderME-MS89L
Au-AA25
681.6N/A50170
MA0135026606907026Pegmatite brecciaBoulderME-MS89L
Au-AA25
544.8N/A90160
MA0145027896906927Brecciated pegmatiteBoulderME-MS89L
Au-AA25
299.5N/A<20120
MA0155028576906848GraniteBoulderME-MS89L
Au-AA25
242.9N/A<2080

 

Table 2. Märrviken outcrop and boulder sampling geochemical assays (SWEREF 99 TM coordinate system).

About the Märrviken Project

The Märrviken licence, in Västernorrlands and Jämtlands Counties, overlies the Storsjön-Edsbyn Deformation Zone and hosts both structurally controlled uranium mineralization and sulphide-hosted Au-Ag-Cu-Zn-Pb mineralization (the Storkullen Prospect). SGU discovered a 2,000×400m train of 766 mineralised boulders here in the 1970s, some carrying percent-grade uranium, and drilled 11 holes in 1979-1980 that intersected low-to-medium-grade uranium mineralization; the Company's exploration team believes the true source of the high-grade boulders has not yet been identified. Historical drilling of the massive sulphide occurrence also intersected high-grade zinc-lead-silver mineralization and anomalous gold.

Flistjärn Project

A total of 8 samples (Table 3) were collected from outcrops in the Flistjärn project area and sent to ALS Global laboratories for assay. One mineralized sample returned with 442.2ppm U3O8, and five samples show anomalous U3O8 content between 10 and 84ppm. The objective of this program was to test the prospectivity of a NE-striking fault that runs parallel to the interpreted zone of mineralisation in this area previously defined by Mawson in the mid-2000s, through rock chip sampling. Mawson also undertook a radon cup survey at Flistjärn during the same period and had eventual plans to drill that never occurred despite the positive results obtained from the survey.

U3O8 results obtained from this small sampling program ranged from a low of 5.0 to a high of 442.2ppm for an average of 90.9ppm U3O8.

Sample IDEastingNorthingLithologyOccurrence
type
Analytical Method
(ALS Global)
U3O8
ppm
FL0014011107094812PhylliteOutcropME-MS89L442.2
FL0024010897094827PhylliteOutcropME-MS89L7.0
FL0034013817094790QuartziteOutcropME-MS89L5.0
FL0044013827094789PhylliteOutcropME-MS89L25.5
FL0054011767094929Phyllite OutcropME-MS89L18.5
FL0064012117094886Phyllite OutcropME-MS89L43.9
FL0074012147094890PhylliteOutcropME-MS89L83.8
FL0084016427094457Phyllite/quartziteOutcropME-MS89L10.4

 

Table 3. Flistjärn grab sampling geochemical assays (SWEREF 99 TM coordinate system).

About the Flistjärn Project

The Flistjärn Project is an approved exploration licence located in Jämtland County, Sweden, situated in a 20km-long corridor in the Olden tectonic window that is anomalous in uranium. The mineralization is considered to be granite related and structurally controlled.

Historical exploration by SGU (1976-1985) and Mawson Resources (2005-2011) mapped the U anomalous corridor. The historically documented uranium occurrences/anomalies have never been drilled.

Sampling protocol and assay method

Boulder and outcrop samples were collected by manual rock chip sampling, typical of early-stage prospecting. Boulder sample values do not establish in-situ mineralization, as they are transported glacial till indicating a potential bedrock source proximal in the up-ice direction. Samples were logged, photographed, sealed, and shipped under chain-of-custody protocols to ALS Laboratories ("ALS"). Because boulder sampling was non-systematic and intended only for early-stage geochemical indications, no QA/QC measures such as blanks, standards, or field duplicates were inserted into the sample stream. At ALS, samples were dried, crushed, and pulverised to industry-standard specifications before multielement analysis (ME-MS89L, ME-MS61, ME-ICPORE, Au-AA25 methods), with the method selected by mineralization type, host-rock matrix, and target commodities. ALS is an internationally recognized ISO/IEC 17025-accredited laboratory relied upon by mining and mineral exploration companies worldwide.

Qualified Person Statement

Technical information in this news release has been reviewed and approved by Avrom E. Howard, MSc, PGeo (Ontario), a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, who is independent of the Company. Mr. Howard is a principal of Nebu Consulting LLC, a US-based mineral exploration consulting company.

About NordX Metals Corp.

NordX Metals Corp. is an exploration and development company focused on the global demand for uranium, lithium, and rare earth elements. The Company is targeting uranium, lithium, and rare earth element projects in politically safe jurisdictions with advanced infrastructure that allows for rapid and cost-effective exploration, development, and potential production opportunities.

The Company's consolidated financial statements and related management's discussion and analysis are available on the Company's website at https://nordxmetals.com or under its profile on SEDAR+ at www.sedarplus.ca.

On Behalf of NordX Metals Corp.

"Andrew Bowering"
Interim Chief Executive Officer
Telephone: +1-604-428-6128
Email: ir@nordxmetals.com

Forward-Looking Statements

This news release includes "forward-looking statements" and "forward-looking information" within the meaning of Canadian securities legislation. All statements included in this news release, other than statements of historical fact, are forward-looking statements, including, without limitation, statements with respect to the Company's exploration plans for the Norr Döttern, Märrviken and Flistjärn Projects, including the mapping and chip rock sampling program and the results thereof planned at Norr Döttern for Q3 2026, and the definition of drill targets at Norr Döttern; and the timing and completion of the Q4 2026 – Q1 2027 winter drilling program at Norr Döttern. Forward-looking statements are often identified by the use of words such as "anticipate", "believe", "plan", "estimate", "expect", "potential", "target", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions, including the negatives thereof.

Forward-looking statements are based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experience, current conditions and expected developments, as well as other factors management believes to be appropriate in the circumstances. Such statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those expressed or implied by such forward-looking statements. These risks and uncertainties include, but are not limited to, the risk that boulder (float) samples may not be sourced from or proximal to a bedrock source and that drilling may not locate in-situ mineralisation; permit title, transfer, validity and renewal risk; the requirement for a separate Finnish Government licence under the Nuclear Energy Act (990/1987) before any uranium recovery; survey and drilling timing and results; risks associated with mineral exploration and development; metal and mineral prices; availability of capital and financing; changes in market conditions; regulatory approvals; environmental and permitting risks; operational and technical difficulties; title matters; competition; fluctuations in interest and exchange rates; and general economic, market and business conditions.

Although the Company believes the assumptions and expectations reflected in the forward-looking statements are reasonable, there can be no assurance that such statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained herein is made as of the date of this news release, and the Company does not undertake to update any forward-looking information except in accordance with applicable securities laws.

The Canadian Securities Exchange has not approved nor disapproved the contents of this news release and does not accept responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/306008

© 2026 Canjex Publishing Ltd. All rights reserved.