00:03:11 EDT Sat 27 Apr 2024
Enter Symbol
or Name
USA
CA



Western Pacific Resources Corp
Symbol WRP
Shares Issued 51,371,858
Close 2014-10-02 C$ 0.16
Market Cap C$ 8,219,497
Recent Sedar Documents

Western Pacific drills one ft of 88.8 g/t Au at Deer

2014-10-02 11:23 ET - News Release

Mr. Michael Callahan reports

WESTERN PACIFIC DRILLING ENCOUNTERS HIGH GRADE MINERALIZATION

Western Pacific Resources Corp. has released positive results from its continuing diamond drill program at the Deer Trail mine, located in Piute county, Utah. On Aug. 20, 2014, a total of 14 holes of a 50-hole program had been completed. These 14 holes consist of 4,052 feet of drilling from two underground drill stations and include grades up to 88.8 grams per tonne (g/t) gold, 5,180 g/t silver, 15 per cent zinc and 10.6 per cent lead.

                      HIGHLIGHTS FROM FIRST 14 HOLES

                Interval Interval         Gold       Silver
Drill hole    from -- to   (feet)  grams/tonne  grams/tonne Lead % Zinc %

DT14-07         30 -- 35        4        20.56        1,192  2.12%  3.38%
Includes        30 -- 31        1         88.8        5,180 10.60% 15.00%
DT14-11       62 -- 70.5      8.5          1.9       332.53  2.83%  4.52%
Includes      62 -- 65.5      3.5         3.99          639  2.37%  4.20%
DT14-13       101 -- 104        3         9.03        734.6  3.35%  6.90%
Includes      101 -- 102        1         26.7        2,170  9.58% 18.45%
DT14-01     136.5 -- 141      4.5        0.812          494  3.90% 17.95%
DT14-12     89.5 -- 92.8      3.3         8.92          717  0.10%  0.48%
DT14-06       26 -- 31.1      5.1         1.18          498  1.04%  3.31%
Includes    28.4 -- 31.1      2.7         2.05          659  0.91%  3.58%
DT14-05       118 -- 119        1         1.87          338  1.30%  8.27%
DT14-04     209.7 -- 213      3.3         3.82          500  3.49%  0.30%

Full details of all drill results including assays, hole location, dip and azimuth are available on the company's website. The project contains several structural blocks and there are insufficient data from the existing drilling pierce points to accurately calculate true thickness at this time.

The current drill program is focused in the 3400 area of the mine, and drilling is being performed from the main PTH haulage tunnel. The long section diagram on the company's website shows the PTH tunnel and the interpreted orientation of the mineralization.

This area was in production intermittently from 1945 to 1962 and again in 1981. Average reported grades from available historical production were 0.171 ounce per ton gold, 11.61 ounces per ton silver, 2.96 per cent lead and 7.45 per cent zinc. The company has not completed the work necessary to have the historical data verified by a qualified person as defined by National Instrument 43-101 and as such these historical estimates should not be relied upon.

"We are very excited that we are seeing a high percentage of high-grade intercepts from our drill program, and that the structures are open both up and downdip as well as laterally," stated Michael Callahan, Western Pacific's president and chief executive officer. "The fact that drilling has intersected mineralization in multiple layers, and not just those mined historically, indicates the 3400 area has more potential than previously anticipated. We are also encouraged that the mineralization intercepted in Manto S4 correlates very closely to the high grades reported when the mine was in production."

The drill program has identified seven stacked manto layers while historic mining focused on only one, Manto S4. Drilling to date into Manto S4 confirms the existence of high-grade mineralization and the structure is open in all directions. While past mining on S4 was primarily below the main haulage tunnel, Western Pacific's drilling into this structure from station 2 targeted the structure above the main tunnel and shows it to be open in that direction. Manto S6, which was not explored or mined historically, has also intersected significant mineralization. The company's first hole (DT14-01) into S6 returned high-grade values of 0.812 g/t gold, 494 g/t silver, 17.95 per cent zinc and 3.9 per cent lead over an interval of 4.5 feet.

The entire program when completed will consist of approximately 50 holes and over 18,000 feet from five underground stations. To date, 21 holes and over 7,500 feet from three underground stations have been completed and the company continues to be pleased with progress.

The objective of the drilling is to define a mineral resource that will allow the company to better evaluate the strategy for putting the mine back into production.

                        DRILL RESULTS FROM DEER TRAIL MINE
Hole DT14-01                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

69.5 -- 74                     S5           0.22           59.2   0.19%   0.24%
74 -- 79                       S5          0.081           25.6   0.30%   0.74%
79 -- 84                       S5          0.375           64.1   0.46%   1.08%
84 -- 88                       S5          0.243           62.2   0.33%   1.84%
88 -- 93                       S5          0.211           40.6   0.43%   0.77%
123 -- 124                   vein          0.571            223   1.48%   0.21%
136.5 -- 141                   S6          0.812            494   3.90%  17.95%
250 -- 254                     S7           0.82            156   0.82%   0.29%
321 -- 324                      ?          0.055           7.87     low   3.03%
324 -- 329.5                    ?          0.131           8.23     low   2.52%


Hole DT14-02                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

51.6 -- 53.0                 vein          0.598            120   0.74%     low
103 -- 104.1                   S6          0.132           37.2   2.12%   0.46%
343.8 -- 344.8               vein          0.735             99   3.70%   9.04%


Hole DT14-03                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

74 -- 76                       S6          0.167           43.6   0.83%   0.87%
76 -- 80.5                     S6          0.162           92.1   0.39%   0.44%
80.5 -- 83.5                   S6          0.145            108     low   0.17%
228.5 -- 229.5                 S7           2.02            313   1.06%   2.78%


Hole DT14-04                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

153 -- 157                   Vein          0.485            535   0.64%   0.07%
188 -- 189                    S5?          0.032           48.8   0.09%   1.26%
189 -- 193                    S5?          0.099           54.3   0.29%   6.66%
193 -- 195                    S5?          0.127           54.6   2.20%   2.23%
195 -- 200                    S5?           0.05           2.56   0.01%   0.00%
209.7 -- 213                   S6           3.82            500   3.49%   0.30%


Hole DT14-05                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

5.5 -- 8.7                   Vein          0.492            100   0.07%   0.05%
26.8 -- 32                     S5          0.235            147   0.28%   0.94%
118 -- 119                     S4          1.865            338   1.30%   8.27%


Hole DT14-06                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

25 -- 26                       S4          0.027           10.7   0.18%   2.79%
26 -- 28.4                     S4          0.205            316   1.18%   3.01%
28.4 -- 31.1                   S4           2.05            659   0.91%   3.58%
31.1 -- 35.5                   S4          0.959            132   0.45%   0.69%


Hole DT14-07                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

30 -- 31                       S4           88.8           5180  10.60%  15.00%
31 -- 35                       S4            3.5            195     Low   0.47%


Hole DT14-08 -- drilled into old workings                                    
Hole DT14-09 -- drilled into overburden                                      
Hole DT14-10 -- no significant assays   

                                     
Hole DT14-11                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

62 -- 65.5                     S4           3.99            639   2.37%   4.20%
65.5 -- 70.5                   S4          0.443            118   3.15%   4.74%


Hole DT14-12                                                               
interval                 Manto  Au gram/tonne  Ag gram/tonne     Pb%     Zn%

89.5 -- 92.8                   S4           8.92            717   0.10%   0.48%


Hole DT14-13                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

63.3 -- 64.7                   S5          0.579           60.5   0.41%   0.72%
91.5 -- 96.4                 vein          0.461           34.8   0.05%   0.20%
96.4 -- 101                    S4          0.217           27.5   0.08%   0.22%
101 -- 102                     S4           26.7           2170   9.58%  18.45%
102 -- 104                     S4          0.191          16.85   0.23%   1.13%
195 -- 198                   vein          0.427           53.3   0.28%   0.28%
198 -- 202.5                 vein           1.03             84   0.07%   0.09%
202.5 -- 204                 vein           1.56            117   0.17%   0.10%
204 -- 209                   vein           3.54            262   0.40%   0.35%


Hole DT14-14                                                               
interval                    Manto  Au gram/tonne  Ag gram/tonne    Pb %    Zn %

150.7 -- 155.7                 S6          0.201            146   2.03%   3.28%
155.7 -- 158                   S6          0.304            157   0.24%   1.08%
195.5 -- 200.8                 S7          0.083           42.2   0.49%   0.71%
200.8 -- 205.4                 S7          0.344           94.1   0.64%   1.45%

Core recovery for the holes reported in this release was high, averaging greater than 99 per cent. Industry-standard QA/QC (quality assurance/quality control) programs are carried out and maintained on the DTM exploration program by Eric Saderholm, qualified person. Sample preparation has been carried out by ALS in Reno and Tucson, assaying has been carried out by ALS Vancouver.

Qualified person

Eric Saderholm, BSc, registered member (No. 4145463RM), Society for Mining, Metallurgy and Exploration, is Western Pacific's qualified person for the purposes of NI 43-101. Mr. Saderholm has approved the scientific and technical information contained in this news release.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.