03:23:04 EDT Fri 26 Apr 2024
Enter Symbol
or Name
USA
CA



East Africa Metals Inc
Symbol EAM
Shares Issued 147,787,161
Close 2017-05-26 C$ 0.25
Market Cap C$ 36,946,790
Recent Sedar Documents

East Africa drills 12.6 m of 12.59 g/t Au at Adyabo

2017-05-29 06:40 ET - News Release

Mr. Andrew Smith reports

EAST AFRICA METALS COMPLETES MATO BULA INFILL DIAMOND DRILL PROGRAM, MOST RECENT INTERSECTIONS INCLUDE 12.60 METRES GRADING 12.59 GRAMS PER TONNE GOLD, 0.66% COPPER, AND 1.5 GRAMS PER TONNE SILVER.

East Africa Metals Inc. has newly received results from recently completed infill diamond drilling at the Adyabo project, Mato Bula deposit, in Ethiopia.

Highlight intersections include:

  • At Mato Bula -- 12.60 metres grading 12.59 grams per tonne gold, 0.66 per cent copper and 1.5 grams per tonne silver, from 77.40 m drill depth (WMD085);
  • At Mato Bula -- 7.60 metres grading 14.59 grams per tonne gold, 0.62 per cent copper and 1.5 grams per tonne silver, from 150.40 m drill depth (WMD086).

Adyabo project Mato Bula work program

The Mato Bula infill diamond drill program was concluded on May 15, 2017. A total of 7,025 metres in 49 holes were completed. Geophysical induced polarization survey work continues on-site and is expected to be completed in early June, 2017. The most recent drill results received are outlined in the associated table.

                            MATO BULA INFILL DIAMOND DRILL INTERCEPTS
  
Hole                 From        To    Interval            Gold      Copper    Silver      Zinc
ID                    (m)       (m)     (m) (1)   (g/t) (2) (3)         (%)     (g/t)       (%)

WMD076              16.24     19.00        2.76            5.13        0.04       1.7      0.01
                    40.01     46.00        5.99            2.29        0.26       8.0      0.30
WMD077              30.00     36.00        6.00            1.36        0.55       1.2      0.02
                    63.80     67.00        3.20            0.92        0.21       4.1      1.11
                    71.80     93.00    21.2 (4)            0.28        0.23       4.7      1.02
including           88.00     93.00        5.00            0.47        0.32       6.3      0.57
WMD078              40.23     41.00        0.77            1.90        0.14       0.0      0.01
                   143.26    147.00        3.74            4.22        1.13       1.2      0.00
                   151.30    154.90        3.60            0.51        1.70       2.6      0.00
                   228.00    232.73    4.73 (4)            0.25        0.28       6.8      1.57
WMD079              34.30     40.64        6.34            0.54        0.01       1.7      0.00
                    50.00     53.80        3.80            4.84        0.52       5.9      0.06
WMD080             105.00    110.00        5.00            0.61        0.90       1.8      0.00
                   129.00    135.00        6.00            5.39        0.06       1.1      0.00
including          133.00    135.00        2.00           14.95        0.06       2.0      0.00
WMD081              22.86     25.91        3.05            2.24        0.00       0.2      0.00
WMD082              47.00     50.00        3.00            0.81        0.93       0.6      0.00
                    81.00     81.58        0.58            2.17        0.37       0.0      0.00
WMD083             214.91    218.30    3.39 (4)            0.68        0.18      11.8      2.41
                   216.30    220.30        4.00            0.76        0.25      11.2      0.34
WMD084              96.07     97.30        1.23            1.89        0.86       1.1      0.00
                   125.00    127.00        2.00            4.25        0.21       0.0      0.00
                   135.48    135.93        0.45           12.30        0.95      19.3      0.05
WMD085              77.40     90.00       12.60           12.59        0.66       1.5      0.03
                   146.22    153.53        7.31            0.80        0.45       3.3      0.08
WMD086             150.40    158.00        7.60           14.59        0.62       1.5      0.03
including          153.00    155.65        2.65           37.12        1.44       3.6      0.03
WMD087             101.53    108.40        6.87            3.74        0.29       0.7      0.02
WMD088             108.70    123.00       14.30            2.39        0.26       0.6      0.01
including          108.70    115.00        6.30            4.59        0.44       1.2      0.02
                   131.00    135.00        4.00            2.64        1.14       2.8      0.01

(1) True thicknesses are interpreted as 60 to 90 per cent of stated intervals.
(2) No top cut has been used on analyses.
(3) Intervals use a 0.3-gram-per-tonne gold cut-off value. 
(4) Zinc interval, not subject to gold cut-off criteria.
  

Harvest project update

Diamond drilling results were also received for the Lihamat drill program, as described in the associated table.


Hole            From             To          Interval              Gold
ID               (m)            (m)           (m) (1)     (g/t) (2) (3)

LD001          49.00          51.00              2.00             9.840
LD002          35.00          36.00              1.00             4.300
               61.00          62.00              1.00             4.370
LD003                                            no significant results
LD004          15.50          17.00              1.50             3.300

(1) True thicknesses are interpreted as 60 to 90 per cent of stated 
intervals.
(2) No top cut has been used on analyses.
(3) Intervals use a 0.3-gram-per-tonne gold cut-off value.

Diagrams illustrating recent drilling results are available on the company's website.

Quality control

The planning, execution and monitoring of East Africa's drilling and quality control programs at the Harvest and Adyabo projects have been conducted under the supervision of Jeff Heidema, PGeo, East Africa's vice-president, exploration. Mr. Heidema is a qualified person as defined by National Instrument 43-101, and has reviewed and approved the geological information contained in this news release. Diamond drilling was co-ordinated by East Africa's contract geologists who also managed the preparation, logging and sampling of core and rock samples, in addition to carrying out bulk density measurements. During sampling, quality control standards and blanks were introduced at predetermined intervals to monitor laboratory performance. A system of field, reject and pulp sample duplicates was also incorporated, as were specific programs of reassaying and umpire lab assaying to both monitor laboratory performance and also characterize potential mineralization, all consistent with industry best practice.

Drill core samples have undergone preliminary preparation at the Bureau Veritas Mineral Laboratories facility in Ankara, Turkey, and are crushed to 80 per cent passing 10 mesh, and pulverized to 85 per cent passing 200 mesh (PRP70-1KG package). Analyses are conducted at both the Turkey facility and the Bureau Veritas Mineral Laboratories in Vancouver, Canada, with diamond drill core analyses utilizing aqua regia digestion and ICP-ES (inductively coupled plasma emission spectroscopy) for base metal and silver analyses (AQ370 package), and infill sample program utilizing aqua regia digestion and ICP-MS/ICP-ES (inductively coupled plasma mass spectrometry/inductively coupled plasma emissions spectroscopy) (AQ270 package) for base metal and silver analyses. Gold analyses are conducted at the Turkey Bureau Veritas Mineral Laboratories facility via fire assay fusion with AA (atomic absorption) finish, and gravimetric analyses are completed for overlimit samples (FA430, FA530-Au packages).

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.