Mr. Peter Main reports
OCTOBER OPERATIONS UPDATE
During October, Rizal Resources Corp. continued to advance the T'boli project with gold sales
more than doubling September
sales at 361 ounces for the month. The project was very close to breaking even, with a result of $36,000 loss for the month, a significant improvement on the September quarter.
Results from the mine were very encouraging with the average grade increasing to four grams per tonne for the month. Mine development continued to advance on several levels, the south access, 525 and 505. The main objective over the next few months is to achieve a cash flow positive position.
Operational highlights for October, 2017
-
Gold production for October totalled 765,000 ounces, bullion sold totalled 361,000 for total revenue of $559,000 (23.1 million Philippine pesos) more than double September sales and gold in circuit (GIC) totalled 404 ounces.
-
The project achieved an operating loss of $36,000 (1.4 million Philippine pesos) versus a loss in September $115,000 (4.7 million Philippine pesos).
-
Gross revenue increased by 56 per cent from September.
-
Operating costs rose by 61 per cent, mainly due to the move to owner mining.
-
Total capital expenditures for October were $438,000 (18.2 million Philippine pesos) of which mine capex was 97 per cent.
-
Total of 116 metres of horizontal advance was achieved in October, 63-metre capital drive and 52 metres of development drive -- a significant improvement on development metres during September.
-
Mill availability was 98 per cent, less than planned mill feed resulted in utilization of only 62 per cent.
-
Mill throughput was 3,760 tonnes, a marginal increase over September's 3,561 tonnes.
OPERATIONS FINANCIAL SUMMARY
Summary September October
Gold in circuit oz 212 404
Gold produced oz 172 361
Silver produced oz 341 489
Total gold oz 383 765
Total silver oz 341 411
Gold revenue CAD $261,430 $552,269
Silver revenue CAD 5,624 6,781
Total revenue CAD 267,054 559,050
Mining costs CAD 63,973 172,828
Milling costs CAD 271,291 368,155
Total operating costs CAD 335,264 540,982
General and admin cost CAD 38,368 52,557
Social dev and environment CAD 7,924 1,452
Total costs CAD 381,555 594,991
Operating profit/loss CAD (114,501) (35,941)
Capital expenditure
Mill capex CAD 0 10,378
Mine capex CAD 380,225 426,842
Admin capex CAD 0 1,180
Total capital CAD 380,225 438,400
PROCESSING FACILITY
Processing September October
Tonnes milled t 3,561 3,760
Grade Au g/t 3.52 4.04
Recovery Au % 95.2% 94.1%
Gold in circuit oz 212 404
Gold produced oz 172 361
Silver produced oz 341 411
Total gold oz 383 765
MINING OPERATION
Mining September October
Decline advance m 55.80 63.50
Development advance m 12.00 52.50
Stoping t 336 232
ROM stockpile t 3,201 2,297
Tonnes sent to mill t 3,986 2,589
Dirk Richards, BSc (met/chem), MAusIMM (CP met), RPEQ, MRACI, is nominated as a qualified person as such term defined under National Instrument 43-101 -- Standards of Disclosure for Mineral Projects, has reviewed and verified the validity of the scientific and technical disclosure in this news release.