Ms. Nicole Brewster reports
RENFORTH COMMENCES JANUARY 2019 PARBEC DRILL PROGRAM
Renforth Resources Inc.'s first drill program for 2019 has commenced at Parbec, with drill and crew mobilization and drilling commencing Jan. 23, 2019. The first hole in this program will be at the eastern end of the Parbec mineralization, a stepout from the company's last hole in this area.
Results from the December, 2018, drilling will be released as available; that program was concentrated in the northwestern area of the property, targeting shallow mineralization which may be open pittable, with seven drill holes.
It is anticipated that the January, 2019, program will consist of approximately 1,500 metres in the eastern and ramp areas of the Parbec resource, undercutting previous results with deeper holes. In addition to this, two previously drilled holes in the northwestern area will be drilled deeper, assuming access is available, in order to reach the mafic volcanic contact on the northern side of the Cadillac break (the hangingwall). Project sections, consisting of assay and geological data, demonstrate a fairly consistent mineralized zone at the contact with the volcanics. In some instances, several holes will have to be resampled in the spring/summer where this contact zone was not sampled.
Brian H. Newton, PGeo, a qualified person pursuant to the guidelines contained in National Instrument 43-101, has approved the technical information found in this press release.
We seek Safe Harbor.
© 2024 Canjex Publishing Ltd. All rights reserved.