Mr. Frank Basa reports
GOLD BULLION DEVELOPMENT INITIATES TRENCHING PROGRAM AT GRANADA
Gold Bullion Development Corp. has started its trenching program at Granada. The company,
based on SGS Geostat qualified person's recommendation in charge of the study, has
initiated a trenching program aimed at validating the existence and
position of mineralized zones at surface.
The main goal is to characterize and validate new shallow high-grade
zones identified in the drill holes GR-12-413, GR-10-21, GR-11-380,
GR-11-313 GR-10-104, GR-10-105, GR-10-125, GR-10-97, GR-10-53 and
GR-10-100. To reach those targets, digging parameters were set for each
trench and pit. The trenching work consists of four trenches and four test
pits to be done with an excavator. The trenches should be from zero to two metres deep and four metres wide. The test pit will consist of holes four metres wide and two metres deep. Channel sampling will be done in each
trench and pit.
A map and details of the location of the trenches and test-pit program,
totalling approximately 470 metres in length, can be viewed on the company's
website.
The company wants to take this opportunity to inform the community that
it will communicate its development plan in the coming weeks with
public consultations. The company has retained the services of C.C.
Consultants of Rouyn-Noranda to assist for the communication with the
community.
Claude Duplessis, PEng, is acting as the qualified person for
Gold Bullion Development in compliance with National Instrument
43-101 and has reviewed the technical contents of this press release.
We seek Safe Harbor.
© 2025 Canjex Publishing Ltd. All rights reserved.