17:42:52 EST Sat 06 Dec 2025
Enter Symbol
or Name
USA
CA



Bayfield Ventures Corp
Symbol BYV
Shares Issued 70,053,367
Close 2012-10-02 C$ 0.36
Market Cap C$ 25,219,212
Recent Sedar Documents

Bayfield drills 5.5 m of 10.39 g/t Au at Burns Block

2012-10-03 09:16 ET - News Release

Mr. James Pettit reports

BAYFIELD ANNOUNCES ADDITIONAL BURNS BLOCK DRILL RESULTS IN THE RAINY RIVER DISTRICT, NW ONTARIO

Bayfield Ventures Corp. has released additional assays from the continuing exploration of the Burns Block project. The company's 100-per-cent-owned Burns Block gold-silver project is located in the Rainy River district of Northwestern Ontario and is situated adjacent to the east and on strike to Rainy River Resources' multimillion-ounce gold-silver deposit.

This news release covers the results from exploration and infill drilling in both the western and eastern portions of the Burns Block property. The assay results of four additional infill holes at the recently discovered East Burns gold-silver zone are reported here along with seven holes drilled in the northwest portion of the property in the area around the near-surface, high-grade discovery hole RR11-71 which intersected 26.70 grams per tonne gold and 170.69 g/t silver over 25.50 metres.

The first of the West Burns holes reported here is RR12-23 which was designed to test the immediate up-dip extension of the shallow, high-grade zone discovered in hole RR11-71 and then carry on to test the deeper mineralized zone discovered in previously reported hole RR10-3. Bayfield has long interpreted that the deeper, multigram gold mineralization intersected in RR10-3 lies within the eastern extension of Rainy River Resources' 433 zone. The easterly extension of this robustly mineralized zone onto Bayfield's Burns Block has only been drill tested with a few holes thus far.

Exploration in the East Burns area has been very active in the late summer with drilling on both sides of the Bayfield-Rainy River Resources property line. The East Burns gold-silver zone is a shear-hosted, southwest-plunging gold-silver-zinc-lead zone that is likely separate and underlying compared with similar mineralized zones intersected in the western portion of the property. Bayfield is continuing to explore the down-plunge extension of the East Burns zone which remains open at depth.

West Burns highlights:

  • Vertical hole RR12-26 intersected 5.5 metres of 10.39 grams per tonne gold and 191.32 g/t silver from a collar position 30 metres north of hole RR11-71. This is an approximate 10 m up-dip extension to the bonanza zone in RR11-71 and the mineralization starts at just 30.5 metres below surface.

  • Vertical hole RR12-27 intersected 29.0 metres of 1.12 g/t Au and 19.55 g/t Ag from a collar position 30 metres north-northeast of RR11-71. This mineralization appears to be a new zone which underlies the high-grade gold and silver zone in RR11-71.

  • Vertical hole RR12-28 intercepted 16.0 metres of 0.66 g/t Au and 31.45 g/t Ag (1.29 g/t gold equivalent) and 16.0 metres of 0.65 g/t Au and 15.38 g/t Ag (0.96 g/t AuEq) both within 122 metres of surface in a position 15 to 20 metres down dip of RR11-71.

  • Hole RR12-23 intersected the immediate up-dip extension of the RR11-71 high-grade zone and then was continued to a final depth of 836 metres to explore the 433 zone in a position 100 metres up dip and 70 metres east of the multigram gold drill intervals in hole RR10-3.

  • Zinc and lead overlimit assays from the twinned bonanza zone in RR12-23 are pending.

  • Porphyry-style quartz and quartz-carbonate veinlet swarms cutting highly porphyritic dacites deep in RR12-23 are locally gold-copper mineralized.

West Burns Block exploration/delineation discussion

RR12-23 was drilled with HQ core through the immediate up-plunge extension of the bonanza gold-silver zone in hole RR11-71. The purpose for this was to obtain larger core for detailed structural and mineralogical analysis as well as to have a larger sample for gravity recovery tests on the very high-grade gold and silver mineralization. Hole RR12-23 was continued to depth to test the 433 exploration horizon in a 100 m step-out from previous drilling. Following completion of RR12-23, another six shallow holes where drilled in the vicinity of RR11-71. The results of this drilling are included in the table, "Assay results from holes RR12-23 to RR12-29," in this news release.

Structural observations made from the detailed logging of the HQ core in the bonanza zone include the following summary points:

  • The bonanza-grade mineralization is hosted by brecciated dacites that are associated with both dark sphalerite and quartz carbonate veinlet swarms.

  • The veinlet swarms are deformed by centimetre-scale folding. These small-scale folds have pointed terminations and axial planes subparallel to foliation.

  • The veinlets commonly exhibit both crude mineral banding as well as quartz, carbonate, galena and gold-filled ladder-style cross-veinlets.

  • Most of the coarse, visible gold occurs in either fracture fillings or in steeply west-dipping tension gash veinlets. Geometry of the gash veinlets has been determined by field core orientation using the south-dipping, sheared foliation fabric for geometric control.

The points above indicate that the high-grade mineralization occurred within an environment of generally north-south compression and coincident north-south-trending fracturing. These fractures include both steeply west-dipping, native gold-bearing, echelon gash veinlets and subvertical, millimetre-scale, gold-galena-chalcopyrite-filled fractures.

Hydrothermal brecciation appears to have occurred prior to mineralization based on the lack of breccia clasts of mineralized veinlet or wall rock material. The overall picture in the northwest portion of the Burns property is pointing toward the presence of a focused hydrothermal vent invading a brittle-ductile, transtensional environment within the host shear zone. The geometry from field core orientations strongly suggests that north-striking, steeply west-dipping fractures focused the hydrothermal solutions within the bonanza-grade gold-silver zone.

The style of the brecciation and crude mineralogic banding in deformed, mineralized veinlets both strongly suggest that the hydrothermal solution underwent episodic boiling. This environment of mineralization is seen in numerous lode gold deposits worldwide.

This style of high-grade mineralization was extended up dip in hole RR12-26. Additionally, hole RR12-27 intersected coarse gold within low sulphide, bull-quartz-style veining in a position 10 metres below that of the bonanza-grade zone. This occurrence indicates that gold and silver mineralization has occurred on multiple horizons in the area around hole RR11-71.

The main goal of RR12-23 was to test the potential extension of the 433 zone in a position 100 metres up dip and 70 metres east from the multigram gold mineralization intersected in early 2010 in hole RR10-3. A persistent zone of pyrite mineralization was intersected at depth with foliated and altered dacites. This zone started at approximately 575 metres down hole and continued to 785 metres where a change to a porphyry-style quartz and quartz carbonate stock work veinlet zone began. This lower stock work zone occurs within an envelope of red potassium feldspar flooding and is chalcopyrite-bearing. Widespread, low-grade gold mineralization was found in both the pyrite zone and in the underlying veinlet stockwork.

             ASSAY RESULTS FROM HOLES RR12-23 TO RR12-29

                From       To   Interval       Au       Ag     AuEq
Drill hole        (m)      (m)        (m)    (g/t)    (g/t)    (g/t)

RR12-23        22.00    24.00       2.00     1.26    21.10     1.68         
including      23.00    24.00       1.00     1.85    28.70     2.42         
               34.00    38.00       4.00     0.41    17.80     0.77         
               43.00    59.00      16.00    26.15   348.74    33.12         
including      46.00    56.00      10.00    38.07   517.23    48.41         
including      46.00    54.00       8.00    44.51   601.50    56.54         
               83.00    96.00      13.00     0.49    23.25     0.96
including      83.00    87.00       4.00     0.93    52.60     1.98
              103.00   105.00       2.00     0.51    11.45     0.74         
              332.00   333.50       1.50     0.21     8.50     0.38         
              623.00   624.50       1.50     0.38     0.90     0.40         
              645.50   647.00       1.50     0.61     2.90     0.67         
              695.00   705.50      10.50     0.51     0.44     0.52         
              801.50   803.00       1.50     1.28     4.90     1.38         
RR12-24        21.00    39.00      18.00     0.28    10.59     0.49         
               47.00    48.00       1.00     0.26     4.60     0.35
               70.00    73.00       3.00     0.36     3.60     0.43
               79.00    80.00       1.00     0.27     5.00     0.37         
               83.00    84.00       1.00     0.33     2.10     0.37         
RR12-25        54.50    80.00      25.50     0.43     8.59     0.60
               78.50    80.00       1.50     0.95    24.00     1.43
RR12-26        12.30    48.50      36.20     1.92    40.91     2.74         
including      30.50    39.50       9.00     6.65    12.79     6.91         
including      30.50    36.00       5.50    10.39   191.32    14.22         
               32.00    34.00       2.00    22.24   420.00    30.64
               56.00    57.50       1.50     0.29    10.20     0.49
               63.00    65.00       2.00     0.34     4.70     0.43         
               75.50    77.00       1.50     0.24     8.90     0.42         
               81.50    88.60       7.10     1.52    25.38     2.03         
including      81.50    83.00       1.50     6.15   110.00     8.35         
RR12-27        29.00    58.00      29.00     1.12    19.55     1.51
including      50.00    53.00       3.00     4.76    72.93     6.22
RR12-28        35.00    36.00       1.00     0.18    15.20     0.48         
               45.00    48.00       3.00     0.30    10.93     0.52         
               69.00    85.00      16.00     0.66    31.45     1.29         
including      69.00    71.00       2.00     1.32     9.85     1.52         
including      81.00    84.00       3.00     1.68   110.27     3.89
including      82.00    84.00       2.00     2.19   150.50     5.20
               89.00    90.00       1.00     0.24     8.90     0.42         
               95.00   102.00       7.00     0.41    19.39     0.80         
              107.00   123.00      16.00     0.65    15.38     0.96         
including     120.00   122.00       2.00     1.70    67.65     3.05         
RR12-29        49.50    51.00       1.50     0.66     8.00     0.82

East Burns highlights:

  • Hole RR12-20 intersects 4.0 metres of 4.13 g/t Au and 19.66 g/t Ag in an infill collar position between holes RR12-5 and RR12-12.

  • Hole RR12-19 intersects 9.0 metres of 1.48 g/t gold and 26.10 g/t silver in an infill collar position between holes RR12-3 and RR12-5.

  • The mineralized zone remains open down plunge to the west-southwest on the Burns Block.

  • Mineralization is being found within a 50 m to 70 m wide zone of shearing, sericite-silica alteration and polymetallic base metal sulphide mineralization.

East Burns Block exploration/delineation discussion

The current results from East Burns continue to show that a focused zone of precious and base metal mineralization becomes more disseminated both up dip and down dip within the host shear and that the mineralized zone plunges in a southwest direction. The potential down-plunge extension of this mineralization remains completely untested southwest of previously reported hole RR12-12 which returned 13.5 metres of 5.13 g/t Au and 25.21 g/t Ag.

As is the case in the western portion of the property, higher grade gold and silver within this plunging zone of mineralization are coincident with the presence of discontinuous, quartz and quartz-carbonate veinlet swarms.

             ASSAY RESULTS FROM HOLES RR12-19 TO RR12-22

                From       To   Interval       Au       Ag     AuEq
Drill hole        (m)      (m)        (m)    (g/t)    (g/t)    (g/t)

RR12-19        55.70    57.00       1.30     1.48     0.10     1.48         
               77.00    78.50       1.50     0.50     0.10     0.50         
              354.50   356.00       1.50     1.52     1.20     1.54         
              534.50   536.00       1.50     0.97     0.30     0.98
              576.00   577.00       1.00     0.35     2.50     0.40
              581.00   590.00       9.00     1.48    26.10     2.00         
including     581.00   585.50       4.50     2.20     6.87     2.34         
including     584.00   585.50       1.50     4.33    14.40     4.62         
              606.50   617.00      10.50     0.52    13.54     0.79         
RR12-20       543.50   545.00       1.50     0.38     4.70     0.47         
              566.00   576.50      10.50     0.77     6.89     0.91         
including     566.00   570.50       4.50     1.15    34.50     1.84
including     566.00   567.50       1.50     1.61    30.40     2.22
              582.50   596.00      13.50     1.54     9.34     1.73         
including     587.00   591.00       4.00     4.13    19.66     4.52         
              587.00   588.50       1.50     8.10    36.00     8.82         
RR12-21       552.50   555.50       3.00     0.64     5.25     0.75         
including     552.50   554.00       1.50     0.89     8.80     1.07
              569.00   576.50       7.50     0.48     2.14     0.52
              585.50   590.00       4.50     1.06    37.13     1.80         
including     588.50   590.00       1.50     2.39    90.80     4.21         
RR12-22       249.50   251.00       1.50     0.38     2.50     0.43         
              290.00   291.50       1.50     0.32     3.40     0.39         
              552.50   554.00       1.50     0.35     6.00     0.47
              563.00   575.00      12.00     0.71     2.26     0.76
including     572.00   573.50       1.50     2.30     2.40     2.35         
              582.50   593.00      10.50     0.77     4.17     0.85         
including     584.00   587.00       3.00     1.58     7.15     1.72         

Quality assurance

Drill core analysis and assaying are being conducted by Activation Labs in Thunder Bay, Ont. The lab is ISO/IEC 17025:2005 (CAN-P-4E) certified. The drill core is split and sampled in standard 0.5 m to 1.5 m intervals. The core samples were analyzed for gold by 30-gram fire assay with AA finish and by gravimetric methods from assays over 5,000 parts per billion (overlimit). Screened total metallic assays are being performed on samples assaying over 5,000 ppb. The core samples were analyzed for silver by Ag aqua regia-ICP finish and Ag fire assay-gravimetric from assays over 100 parts per million (overlimit). The company has implemented a quality assurance and quality control program to ensure that the sampling and analysis of all samples are conducted in accordance with the best possible practices.

Robert Marvin, PGeo, CPG, vice-president exploration for Bayfield Ventures, is the qualified person as defined by National Instrument 43-101 and supervised both the project fieldwork and the preparation of the technical information in this release.

We seek Safe Harbor.

© 2025 Canjex Publishing Ltd. All rights reserved.