SKEENA ANNOUNCES 5.3 MOZ AT 4.3 G/T AUEQ MEASURED AND INDICATED RESOURCES AT ESKAY CREEK
Skeena Resources Ltd. has provided an updated mineral resource estimate (MRE) for the Eskay Creek gold-silver project, located in the Golden Triangle of British Columbia, which has been reviewed and validated by SRK Consulting (Canada) Inc. The 2021 MRE was derived from 7,583 historical surface and underground diamond drill holes totalling 651,332 metres, with an additional 751 surface diamond drill holes completed by Skeena between 2018 and 2021, totalling 104,740 metres. The effective date of this MRE is April 7, 2021, and an updated technical report will be filed on the company's website and SEDAR within 45 calendar days of this disclosure.
2021 Eskay Creek resources
ESKAY CREEK PIT-CONSTRAINED RESOURCES
Reported at a 0.7-gram-per-tonne-gold-equivalent cut-off grade and underground resources reported at
2.4 and 2.8 g/t AuEq cut-off grades for long-hole and drift-and-fill mining, respectively (UG is
underground)
Tonnes AuEq Au Ag AuEq oz Au oz Ag oz
Category (000s) (g/t) (g/t) (g/t) (000s) (000s) (000s)
Measured pit 17,312 5.8 4.2 118.4 3,213 2,322 65,908
Measured UG 345 6.1 5.2 67.3 68 58 747
Total measured 17,657 5.8 4.2 117.4 3,281 2,380 66,655
Indicated pit 20,342 2.9 2.2 52.5 1,903 1,439 34,362
Indicated UG 506 5.3 4.9 35.8 87 79 583
Total indicated 20,848 3.0 2.3 52.1 1,990 1,518 34,945
M+I pit 37,654 4.2 3.1 82.8 5,116 3,761 100,270
M+I UG 851 5.7 5.0 48.6 155 137 1,330
Total M+I 38,505 4.3 3.1 82.1 5,271 3,898 101,600
Inferred pit 5,239 1.4 1.0 25.0 231 174 4,203
Inferred UG 429 4.9 4.1 57.0 67 57 787
Total inferred 5,668 1.6 1.3 27.4 298 231 4,990
Pit-constrained resource growth discussion
The company's phase 1 and phase 2 infill drilling programs were immensely successful in not only recategorizing pit-constrained resources but also adding additional resources in the 22 zone, 21A zone, 21B zone and the recently discovered 21C-HW zone. Furthermore, the NEX (Northern Extension) zone has now been incorporated into the pit-constrained resource base. This new Northern pit expansion integrates the largely measured and indicated NEX zone and provides the potential for additional reserves.
In 2019, the company's MRE utilized conservative zero-grade 1.0-metre buffers surrounding historical stopes and development partially imposed due to spatial uncertainty. Consequently, mineralization occurring inside these buffers was not reported. During 2021, numerous phase 2 drill holes predictably intersected the modelled historical workings, which provided spatial confidence resulting in the reduction of the buffers from 1.0 metre to 0.2 metre. Over all, this translated into the reporting of an additional 731,000 tonnes averaging 25.4 g/t AuEq (597,000 ounces AuEq).
MEASURED, INDICATED AND INFERRED PIT-CONSTRAINED RESOURCES
Tonnes AuEq Au Ag AuEq oz Au oz Ag oz
Category (000s) (g/t) (g/t) (g/t) (000s) (000s) (000s)
Measured 17,312 5.8 4.2 118.4 3,213 2,322 65,908
Indicated 20,342 2.9 2.2 52.5 1,903 1,439 34,362
M+I 37,654 4.2 3.1 82.8 5,116 3,761 100,270
Inferred 5,239 1.4 1.0 25.0 231 174 4,203
Reported at a 0.7 g/t AuEq cut-off grade.
Underground constrained resources discussion
Determination of underground resources with reasonable prospects for economic extraction was completed with stope optimization software that considered both long-hole and drift-and-fill mining methods based on the geometries of zones. Underground resources in the NEX zone and 22 zone were only informed by historical drilling data. However, the company's drilling programs have facilitated growth in the Water Tower zone (WTZ) and Lower mudstone (LM).
MEASURED, INDICATED AND INFERRED UNDERGROUND CONSTRAINED RESOURCES
Tonnes AuEq Au Ag AuEq oz Au oz Ag oz
Category (000s) (g/t) (g/t) (g/t) (000s) (000s) (000s)
Measured UG 345 6.1 5.2 67.3 68 58 747
Indicated UG 506 5.3 4.9 35.8 87 79 583
M+I UG 851 5.7 5.0 48.6 155 137 1,330
Inferred UG 429 4.9 4.1 57.0 67 57 787
Reported at a 2.4 g/t AuEq cut-off grade for long-hole mining and 2.8 g/t AuEq cut-off grade for
drift-and-fill mining.
Walter Coles, Skeena's president and chief executive officer, commented: "I would like to congratulate Skeena's vice-president exploration and resource development, Paul Geddes, and chief resource geologist, Kathi Dilworth, and their teams. They have delivered a terrific new resource estimate for Eskay Creek. The measured and indicated resources have increased by an astounding 186 per cent on a tonnage-weighted basis since our last resource report. I am eager to see how much more Paul and Adrian Newton, the company's director of exploration, can continue to grow the size of Eskay Creek as we target a Tier 1 annual production and reserve profile."
Measured and indicated resources
The conversion of pit-constrained resources to the measured and indicated categories is an important derisking milestone for Eskay Creek. The abundance of resources now categorized as measured is especially significant due to the very high confidence level of this category. The company anticipates a substantial percentage will ultimately convert to proven reserves once feasibility-level studies are completed. On a tonnage-weighted basis, 40 per cent, 48 per cent and 12 per cent of the current pit-constrained resources are respectively categorized as measured, indicated and inferred.
Additional 2021 NEX studies
Based on tonnage, 12 per cent of the new pit-constrained resources are categorized as inferred resources. The company is finalizing a small surface-based drilling program to convert these small pods of scattered mineralization to the measured and indicated categories. In the area of the Northern pit expansion, a program of geotechnical drilling and metallurgical sample collection will occur in Q2 2021 to enable the upgrade of resources to reserves.
Resource breakdown by lithology
Unmined mineralization at Eskay Creek is hosted largely in the rhyolite facies, which has lower concentrations of the epithermal suite of elements (mercury-arsenic-antimony) relative to the Contact mudstones. Preferential historical development and mining of the extremely high-grade mineralization hosted in the Contact mudstone have resulted in extensive depletion of resources in this rock type. The 2021 pit-constrained MRE indicates that on a tonnage-weighted basis, 68 per cent of the resources are hosted within the rhyolite facies, with only 18 per cent hosted in the remaining unmined Contact mudstone. The outstanding 14 per cent occurs predominantly within the hangingwall andesite-sedimentary lithology package, which lies stratigraphically above the Contact mudstone, with a minor amount in the footwall dacite.
Accelerated 2021 exploration program initiated
With the infill drilling programs completed and the pit-constrained resources having been largely converted to the measured and indicated categories, the company has initiated a property-scale exploration program. This accelerated program is designed to define additional near-surface, bulk-tonnage mineralization, with the goal of expanding the current resource base, and to supplement the existing mine plan. The program will involve a data compilation and interpretation period followed by judicious target ranking that will culminate in drill testing of near mine and regional targets in the second half of 2021. Dr. Harold Gibson, one of the world's foremost experts in VMS (volcanogenic massive sulphide) systems, has been engaged by the company to assist the program, which will be spearheaded by the company's director of exploration Adrian Newton, PGeo.
Eskay Creek deposit mineral resource estimate notes
The mineral resources disclosed in this press release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards on mineral resources and reserves definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council.
- Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves.
- As defined by National Instrument 43-101, the independent and qualified person for the Eskay Creek MRE is S. Ulansky, PGeo, of SRK Consulting (Canada) Inc., who has reviewed and validated the Eskay Creek MRE. The effective date of the MRE is April 7, 2021.
- Resources are reported in situ and undiluted for the pit-constrained and underground scenarios; both are considered to have reasonable prospects for economic extraction.
- In accordance with NI 43-101 recommendations, the number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.
- Metal prices used for the AuEq calculation are $1,700 (U.S.) per ounce of gold and $23 (U.S.) per ounce of silver. AuEq is equal to Au (g/t) plus (Ag gram per tonne divided by 74).
- Metallurgical recoveries reflective of test work that averages 90 per cent Au and 80 per cent Ag were utilized in the determination of cut-off grades for the open-pit and underground resources.
- The calculated pit-constrained cut-off grade was determined to be 0.66 g/t AuEq, whereas the long-hole stoping and drift-and-fill underground mining method cut-off grades were calculated to be 2.4 g/t AuEq and 2.8 g/t AuEq, respectively. A pit-constrained cut-off of 0.7 g/t AuEq was selected for the MRE. Cut-off grades must be re-evaluated considering prevailing market conditions (including gold prices, exchange rates and costs).
- Two models were constructed in a two-stage process: a stage one pit-constrained model using a nine- by nine- by four-metre block size using two-metre capped composites. An underground model using a three- by three- by two-metre block size using one-metre capped composites was estimated in stage two.
- Block tonnage was estimated from volumes using bulk density values projected from defining rock type groups. Specific gravity values coded into the block model range from 2.66 grams per cubic centimetre to 3.0 grams per cubic cm.
- The geological model was updated in 2021 to include hangingwall and footwall sediments, which were previously merged within the stratigraphic packages. In addition, extrusive units were delineated below the prolific rhyolite lithology package.
- Eighty-four mineralization domains were created in Leapfrog Geo (Seequent) using two distinct methods: (1) an indicator RBF interpolant utilizing a nominal cut-off grade of 0.5 g/t AuEq and probability of 50 per cent was used for the Contact mudstone unit, and (2) the interval selection tool using a 0.5 g/t AuEq cut-off was the method of choice for the mineralization domains in the remaining lithology types. The mineralization domains were separated into major fault block and historical mining zones, and each domain was modified or reassessed individually to consider presiding mineralization features.
- All 84 mineralization domains were estimated and those blocks that were captured within the optimized pit shell at a 0.7 g/t AuEq cut-off were reported as pit-constrained resources. Nineteen of those mineralization domains, which fell below the level of the optimized pit, were reported within underground stope optimized shapes.
- Five low-grade shells were constructed and estimated along with the 84 mineralization domains slated for the pit-constrained resources only.
- A 3.0-metre hard boundary around all underground stopes was constructed so that high-grade composites from within mined-out areas had limited influence. The 3.0-metre restricting boundary was utilized in both the pit-constrained and underground estimation models.
- Grade capping was performed on each lithology-separated domain using two-metre composites in the open-pit model and 1.0-metre composites in the underground model, with both composite files honouring mineralized domain boundaries. Composites were distributed equally in length.
- Within the 84 mineralization domains, gold capping values ranged from seven to 650 g/t and silver capping values ranged from 40 to 25,000 g/t in the 2.0-metre composite file. Grade capping was performed separately in the five low-grade zones and did not exceed nine g/t gold and 200 g/t silver. Gold capping values ranged from four to 400 g/t and silver capping values ranged from 10 to 30,000 in the 1.0-metre composite file.
- Gold and silver variograms were used to determine the spatial relationship of composites over distance. Two-metre composites established the primary orientation, nugget, sills and ranges per rock-type-divided domain for the open-pit model. For the underground estimate, variograms for the 1.0-metre composites used the same orientations as the 2.0-metre composites. However, the nugget, sills and ranges were accordingly updated.
- Ordinary kriging was used for the estimation of gold and silver in all domains. Resources were estimated using Maptek Vulcan (version 2021.0.1) using subblocking capabilities of three- by three- by two-metre cell sizes for the pit-constrained model, and one- by one- by one-metre cell sizes for the underground model.
- Search orientations were modified with dynamic anisotropy using a surface which mimicked the local lithological units. Dynamic anisotropy was used for the 21A, 21B, 21C and the Lower mudstone zone. The remaining zones used an orientation defined by the variogram.
- The mineral resources were estimated using three passes with increasing search radii based on variogram ranges. Pass 1 approximated two-thirds of the range of the variogram; pass 2 equalled the range of the variogram and pass 3 equalled 2.5 times the variogram range in the pit-constrained and underground model.
- In both models, pass 1 used a minimum of eight composites and a maximum of 10 composites. Pass 2 used a minimum of five composites and a maximum of 15 composites and pass 3 used a minimum of three composites and a maximum of 15 composites. A maximum of two composites per hole was specified.
- Hard boundary interpolations were honoured between lithologies within the domains.
- A low-grade envelope model was estimated using two-metre capped composites within five domains. The variogram orientation for these low-grade domains was inherited from the nearest mineralization domain. One estimation pass using a restricted search of 25 m by 25 m by 15 m was allocated using a minimum of three composites and a maximum of 10 composites per estimated block. A maximum of two composites per hole were specified. Only coherent waste zone blocks estimated using a minimum of three drill holes were included in the inferred category.
- Measured, indicated and inferred resources were classified according to the following scheme for the pit constrained model:
- The measured category is defined as blocks interpolated only within pass 1, using a minimum of four drill holes, a kriging variance of less than 0.3 and an average distance of less than 15 metres to the gold composites.
- The indicated category is defined by blocks interpolated within pass 1 and pass 2 only and using a minimum of four drill holes.
- The inferred category is defined by blocks interpolated within passes 1, 2 and 3 using a minimum of two holes and a kriging variance of less than 0.8.
- For the underground model, the resources were classified according to the following scheme:
- The measured category is defined as blocks interpolated within pass 1 only using a minimum of four holes and an average distance of less than 15 metres to the gold composites.
- The indicated category is defined by block interpolated during pass 1 and 2 using a minimum of three drill holes.
- The inferred category is defined by block interpolated within pass 1, 2 and 3 using a minimum of two holes.
- In consultation with SRK's geotechnical team, who reviewed the documentation on fill type used previously at the Eskay Creek mine, an exclusion buffer of 1.0 metre surrounding the underground workings for the underground model was specified, whereas a buffer of 0.2 metre surrounds the underground workings in the proposed pit-constrained model. Estimated mineralization that occurs within these buffers is not included in this MRE.
- Estimates use metric units (metres, tonnes and g/t). Metal contents are presented in troy ounces (metric tonne multiplied by grade divided by 31.10348).
- Neither the company nor SRK is aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect this mineral resource estimate.
- The abundance and significance of As, Hg and Sb are currently under evaluation.
- The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature and there has been insufficient exploration to redefine the inferred mineral resources as indicated mineral resources. It is uncertain if further exploration will result in upgrading them to the indicated mineral resources category.
PIT-CONSTRAINED SCENARIO ASSUMPTIONS FOR DETERMINING CUT-OFF GRADES
WITH REASONABLE PROSPECTS OF ECONOMIC EXTRACTION
Input parameters Value Unit
Pit wall angles 45 Degrees
Reference mining cost $3 U.S. dollars per tonne mined
Mining recovery 95% Per cent
Mining dilution 5% Per cent
Processing cost $15.50 U.S. dollars per tonne processed
General and administration $6.00 U.S. dollars per tonne processed
Process recovery Au 90% Per cent
Process recovery Ag 80% Per cent
Sell price Au $1,700 x (0.95) U.S. dollars per ounce (95% payable)
Sell price Ag $23 x (0.95) U.S. dollars per ounce (95% payable)
Transportation/refining costs $25 U.S. dollars per ounce AuEq
Strip ratio 9.89:1 Unitless
UNDERGROUND SCENARIO ASSUMPTIONS FOR DETERMINING CUT-OFF GRADES WITH
REASONABLE PROSPECTS OF ECONOMIC EXTRACTION
Input parameters Value Unit
Reference mining cost $80 U.S. dollars per tonne mined
Processing cost $25 U.S. dollars per tonne milled
General and administration $12 U.S. dollars per tonne milled
All-in costs $117 U.S. dollars per tonne milled
Process recovery Au 90% Per cent
Process recovery Ag 80% Per cent
Sell price Au $1,700 x (0.95) U.S. dollars per ounce (95% payable)
Sell price Ag $23 x (0.95) U.S. dollars per ounce (95% payable)
Transportation/refining costs $25 U.S. dollars per ounce AuEq
Eskay Creek mineralization
The Eskay Creek deposit represents a shallow water, bimodal volcanic sequence hosted in a fault-bounded basin with an epithermal VMS (volcanogenic massive sulphide) signature. Rhyolite facies volcanics are overlain by mafic volcanics, with a clastic mudstone occurring at the contact between the two volcanic episodes. This mudstone represents the period of quiescence between the two volcanic events and is spatially and temporally related to the main mineralizing event at Eskay Creek. The epithermal suite of elements (Hg-Sb-As) and bonanza precious metal grades dominantly occur at this interface but are not homogenously distributed throughout the mudstone. Rather, they are spatially associated with vents fed from underlying synvolcanic feeders.
Due to the higher precious metal tenor of the mudstone-hosted mineralization, the vast majority of historical production at Eskay Creek occurred within this rock type, whilst the rhyolite-hosted feeder-style mineralization was less developed due to its lower Au-Ag tenor. Rhyolite-hosted mineralization is not enriched in Hg-Sb-As and was often blended with mudstone-hosted zones to reduce smelter penalties for the on-site milled concentrates and direct shipped ore (DSO).
About Skeena Resources Ltd.
Skeena is a Canadian mining exploration company focused on revitalizing the past-producing Eskay Creek gold-silver mine located in Tahltan territory in the Golden Triangle of northwest British Columbia, Canada. The company released a robust preliminary economic assessment in late 2019 and is currently focused on infill and exploration drilling to advance Eskay Creek to full feasibility by the end of 2021. Additionally, Skeena continues exploration programs at the past-producing Snip gold mine.
Qualified persons
The independent and qualified person for the Eskay Creek MRE is Sheila Ulansky, PGeo, of SRK Consulting (Canada) Inc. (Vancouver), who has reviewed, validated and approved the Eskay Creek MRE as well as the technical disclosure in this release. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, PGeo, vice-president of exploration and resource development, is the qualified person for the company and has validated and approved the technical and scientific content of this news release. The company strictly adheres to CIM Best Practices Guidelines in conducting, documenting and reporting its activities on its various exploration projects.