Mr. Michael Allen reports
STRIKEPOINT FILES NI 43-101 TECHNICAL REPORT OUTLINING EXPLORATION TARGET OF BETWEEN 819,000 AND 1,018,000 OZ AU ON THE HERCULES GOLD PROJECT IN NEVADA'S WALKER LANE, COMPLETES DRILL PROGRAM
Strikepoint Gold Inc. has filed its first technical report on the 100-per-cent-owned Hercules gold project located in the prolific Walker Lane, Nevada.
Michael G. Allen, president and chief executive officer of Strikepoint, noted: "Since acquiring the Hercules gold project in September, 2024, for $250,000, the company has begun rapidly advancing the project. We have summarized the efforts of previous operators and established the exploration target. In addition, we were quick to mobilize for our initial drilling program with the goal of confirming and expanding the known mineralization at Hercules. Our initial campaign completed seven drill holes totalling approximately 1,400 metres, with all samples currently in process and the results to be released shortly."
Report conclusions
The technical report includes a drill-defined, bulk-tonnage exploration target prepared in accordance with the guidelines set forth in National Instrument 43-101. The report establishes a baseline exploration target for Hercules ranging between 819,000 and 1,018,000 ounces of gold within 40.3 million to 65.6 million tonnes of mineralized material at an estimated grade range between 0.48 and 0.63 gram per tonne gold. The quantity and grade are conceptual in nature as there has not been sufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The exploration target expressed should not be misrepresented or misconstrued as an estimate of a mineral resource or mineral reserve. The exploration target model has not been evaluated for reasonable prospects of eventual economic extraction.
The authors of the technical report are Michael B. Dufresne, MSc, PGeol, PGeo, Fallon T. Clarke, BSc, PGeo, and Christian Bohm, PhD, PGeo, of Apex Geoscience Ltd. The authors are independent qualified persons as defined in NI 43-101.
Exploration target
The exploration target was developed using historical drilling, trenching data and gold assay results. Mineralization trends were evaluated using artificial intelligence to generate a trend model, which informed the construction of grade shells in combination with current geological understanding. These grade shells were used to estimate the distribution of mineralized tonnes and to support the generation of grade-tonnage curves. The exploration target and artificial-intelligence-generated model will be utilized to guide future drilling in these areas of known mineralization.
The exploration target used data from the Sirens, Hercules, Cliffs, Loaves, Lucky Rusty, Rattlesnakes and Northeast showings on the Hercules gold project. In this area, there are a total of 306 historical drill holes, yielding a total of 31,776 metres in the drill hole database along with data for 121 surface trenches. The drill hole database contains a total of 18,409 sample interval entries, with the trenches providing another 475 sample entries. A total of 5,620 sample intervals are contained within the mineralization domains utilized for the exploration target.
Numerous targets remain untested, and the previous drilled showings remain open for further expansion and potential conversion to mineral resources.
Of note, there are insufficient data in the historical database to provide silver grade estimates. The drill hole and trench database contains a total of 5,520 samples with greater than or equal to 0.1 gram per tonne gold and coincident silver analyses. The average Ag to Au ratio of those samples is 9.73 to 1. Silver was not modelled as part of the exploration target.
Drilling
The company completed seven drill holes into the northern portion of the Hercules gold project testing the Hercules, Cliffs and Loaves targets. All drill holes visually returned alteration and silicification that are consistent with gold mineralization in previous drill campaigns. All samples from the drill holes are at the assay lab, and results will be released as they become available.
Qualified persons
All technical data, as disclosed in this news release, has been verified by Michael G. Allen, PGeo, president and chief executive officer of the company. Mr. Allen is a qualified person as defined under the terms of National Instrument 43-101.
The Hercules gold project exploration target was completed by Michael Dufresne, MSc, PGeol, PGeo, president and chief executive officer of Apex, an independent qualified person as defined by NI 43-101. Mr. Dufresne has approved of the technical disclosure herein.
About Strikepoint Gold Inc.
Strikepoint is a multiasset gold exploration company focused on building precious metal resources in the western United States and in Canada.
Both the Hercules gold project and the Cuprite gold project are located in Nevada's Walker Lane gold trend, where Strikepoint is rapidly becoming one of its largest holders of mineral claims with approximately 145 square kilometres of prospective geology under claim.
The Walker Lane hosts AngloGold Ashanti's multimillion-once Silicon gold and Merlin discoveries and Kinross's Tier 1 Round Mountain mine.
In addition, the company controls two advanced-stage exploration assets in British Columbia's Golden Triangle: the past-producing high-grade-silver Porter-Idaho project and the high-grade-gold Willoughby project.
We seek Safe Harbor.
© 2026 Canjex Publishing Ltd. All rights reserved.