12:59:15 EST Wed 18 Nov 2026
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Element 29 Resources Inc
Symbol ECU
Shares Issued 120,332,598
Close 2024-12-23 C$ 0.58
Market Cap C$ 69,792,907
Recent Sedar+ Documents

Element 29 completes first two holes of Elida program

2024-12-23 18:21 ET - News Release

Mr. Richard Osmond reports

ELEMENT 29 COMPLETES THE FIRST TWO HOLES FROM THE PHASE-III DRILL PROGRAM AT ITS ELIDA PORPHYRY CU-MO-AG DEPOSIT IN CENTRAL PERU

Element 29 Resources Inc. has completed the first two drill holes, for 2,249.8 metres (m), from the phase III diamond drill program at its Elida porphyry copper-molybdenum-silver (Cu-Mo-Ag) deposit in central Peru.

Richard Osmond, president and chief executive officer of Element 29 Resources, states: "We are pleased to announce the successful completion of the two deepest drill holes at Elida. Both holes intersected strong porphyry-related hydrothermal alteration from the bedrock surface to depths exceeding 950 metres, indicating the potential to carry copper-molybdenum-silver mineralization. Both drill holes were terminated in strong porphyry alteration and remain open for future drilling campaigns."

Mr. Osmond continues: "We anxiously await geochemical assay results, which are expected in the coming weeks. The phase III drill program is also scheduled to restart in early Q2 2025 following the end of the rainy season in Peru."

The Elida diamond drill program was designed to potentially expand the existing pit-constrained initial inferred mineral resource estimate of 321.7 million tonnes of 0.39 per cent Cu, 0.03 per cent Mo and 2.61 grams per tonne (g/t) Ag at a cut-off of 0.2 per cent Cu and a 0.74:1 strip ratio (mineral resource). These drill holes were also planned to infill gaps within the exiting pit shell to potentially increase the higher-grade 59.7-million-tonne resource of 0.49 per cent Cu, 0.036 per cent Mo and 3.99 g/t Ag at a cut-off of 0.40 per cent (higher-grade resource), and continue drilling to depths of up to 1,000 m while in porphyry-related alteration and mineralization.

To date, there has been insufficient exploration to expand the existing pit-constrained initial inferred mineral resource estimate or to improve the overall Cu-Mo-Ag grades and it is uncertain if further exploration will result in an increase in the overall mineral resources. However, several previous drill holes have extended the porphyry Cu-Mo-Ag mineralization outside the existing pit shell, including drill hole ELID025, collared just north of the pit centre, which intersected 908.75 m of 0.39 per cent Cu, 0.035 per cent Mo and 2.9 g/t Ag (0.51 per cent copper equivalent (CuEq)) from bedrock surface at 38.4 m depth. This suggests that the Cu-Mo-Ag mineralization extends to depths of more than 900 m from bedrock surface within the porphyry-related hydrothermal footprint.

ELID033

Drill hole ELID033 is located 200 m to the west of ELID032, which previously returned 404.5 m of 0.45 per cent Cu, 0.032 per cent Mo and 3.6 g/t Ag (0.55 per cent CuEq) from bedrock surface at 45.5 m, and ended in 13.4 m of 0.75 per cent Cu, 0.032 per cent Mo and 7.2 g/t Ag (0.83 per cent CuEq) at 450.0 m depth. ELID033 was designed to extend the porphyry Cu-Mo-Ag mineralization found at the bottom of ELID032 beyond the existing pit shell to a depth of 1,000 m. The hole also aims to infill withing the existing pit shell, potentially expanding the higher-grade resource.

ELID033 was drilled to a depth of 1109.6 m at a minus-80-degree dip toward a 270-degree azimuth. The hole collared in 69.9 m of colluvium followed by a 77.55 m thick intermediate volcano sedimentary unit that is intensely potassic altered with secondary biotite and cut by a stockwork of porphyry-related quartz-pyrite-chalcopyrite-molybdenite veins (A veins) and locally early biotite veins (EB veins), which are sometimes overprinted by chlorite alteration. Starting at 147.45 m, the hole encountered 379.75 m of calc-silicate-altered calcareous siltstone showing intense porphyry-related skarn alteration with patches of brown and green garnet and pyroxene (skarn), both cut by abundant A veins. This is followed by a 60.8 m intercept calc-silicate-altered siltstone unit starting at 527.2 m that is strongly potassic altered with pervasive secondary biotite alteration cut by abundant A veins and local EB veins. Both sedimentary units are later cut by retrograde alteration as chlorite-epidote-pyrite-chalcopyrite-magnetite as patches and veins (retrograde) and minor sulphide veins with sericite halos (D veins) as a late phyllic alteration overprint. These units are also cut locally by narrow fingers of late mineral quartz monzonite porphyry dikes that are potassic altered with secondary biotite replacement cut by A veins.

At a depth of 588.0 m, the hole intersected a 233.25 m wide quartz monzonite porphyry intrusion that does not extend vertically to bedrock surface. This intrusion is pervasively potassic altered with secondary biotite replacement, and cut by A veins, and locally by anhydrite veins and patches. The intrusion also exhibits moderate phyllic alteration locally with supergene clay alteration occurring along structures where the core is more heavily fractured and broken. Near the lower contact, xenoliths of host rock sediments have been recognized that are also intensely potassic altered with secondary biotite cut by A veins.

At a depth of 821.25 m, the hole intersected 154.55 m of strongly calc-silicate-altered calcareous siltstone with skarn alteration, both cut by abundant A veins and retrograde alteration. This unit is cut by a 71.5 m intercept of moderate to strong potassic-altered quartz monzonite porphyry intrusion with secondary biotite locally overprinted by chlorite alteration and magnetite veinlets. This was followed by a 53.0 m sequence of calc-silicate-altered siltstones with pervasive secondary biotite and EB veins, cut by more abundant A veins. The drill hole ended at 1,109.6 m depth for operational purposes upon intersecting a 9.3 m wide heavily fractured quartz monzonite porphyry dike.

ELID034

Drill hole ELID034 was shut down in calc-silicate-altered calcareous siltstones at 161.2 m after three days trying to recover the drill rods. The hole is located roughly 120 m to the northwest of ELID025, which intersected 908.75 m of 0.39 per cent Cu, 0.035 per cent Mo and 2.9 g/t Ag (0.51 per cent CuEq) from bedrock surface at 38.45 m. This included 339.4 m of 0.50 per cent Cu, 0.036 per cent Mo and 4.3 g/t Ag (0.67 per cent CuEq) starting at bedrock surface, and 126 m of 0.42 per cent Cu, 0.035 per cent Mo and 2.51 g/t Ag (0.57 per cent CuEq) starting at 821.2 m, and continued to the bottom of the hole at 942.7 m depth. ELID034 was designed to follow-up on the porphyry-related Cu-Mo-Ag mineralization intersected in ELID025 to potentially expand the higher-grade resource and to continue drilling outside the existing pit shell to a depth 1,000 m while in porphyry Cu-Mo-Ag mineralization.

ELID034 was drilled to a depth of 161.2 m at a minus-85-degree dip toward a 270-degree azimuth before the hole was accidentally lost during a routine drill bit change. The hole collared in 57.65 m of colluvium followed by 103.55 m of calc-silicate-altered calcareous siltstones with patchy and lenticular zones of skarn alteration becoming more secondary biotite altered within less calcareous units. Both units were cut by abundant A veins and local EB veins, as well as later retrograde alteration and minor D veins.

ELID035

Drill hole ELID035 is located just five m north of drill hole ELID034. Like ELID034, this hole was designed to follow up on the porphyry-related Cu-Mo-Ag mineralization intersected in ELID025. The objective of this hole is to potentially expand the existing higher-grade resource and continue drilling outside the existing pit shell to a depth 1,000 m while in porphyry Cu-Mo-Ag mineralization.

ELID035 was drilled to a depth of 979.0 m at a minus-85-degree dip toward a 270-degree azimuth. The hole collared in 56.6 m of colluvium, followed by 356.85 m of calc-silicate-altered calcareous siltstones with patchy and lenticular zones of strong skarn alteration, cut by A veins, and overprinted by retrograde alteration and D veins. This transitions to a 179.6 m thick siltstone unit at a depth of 413.45 m, which is strongly potassic-altered with pervasive secondary biotite replacement and EB veins locally overprinted by chlorite alteration. In places, the intervals become more calcareous and strongly skarn altered, cut by abundant A veins, as well retrograde alteration and D veins.

At a depth of 593.8 m, the hole intersected a 385.95 m thick sedimentary sequence of potassic-altered feldspathic arenites and siltstones. These units are strongly potassic altered with pervasive secondary biotite replacement, and cut by A veins, and local anhydrite patch and veins. Retrograde alteration was recognized forming along a structural foliation that is widespread throughout the sequence. The dill hole ended at 979.0 m depth for operational purposes while still in strongly potassic-altered feldspathic arenite sediments.

About Elida porphyry Cu-Mo-Ag deposit

The Elida porphyry Cu-Mo-Ag deposit occurs along the east side of a large block of 29 contiguous concessions totalling 19,749 hectares (ha) that are 100 per cent owned by Element 29 Resources. The project is in west-central Peru and is road accessible from the capital city, Lima, along the Pan American Highway, 170 kilometres northwest to the coastal city of Barranca, then inland 75 kilometres along a secondary road with paved and unpaved surfaces.

Elida is well located for future mine development, and will benefit from nearby infrastructure and a skilled work force. The project is situated at a moderate elevation between 1,500 m and 2,000 m with access to transportation routes to coastal shipping ports and power infrastructure, including a 45-megawatt hydroelectric generation facility situated just 15 kilometres from the property.

The Elida porphyry complex is a Cu-Mo-Ag mineralized multiphase porphyry system with a 2.5-kilometre-by-2.5-kilometre (km) hydrothermal alteration footprint at surface, associated with Eocene-aged quartz monzonite stocks, emplaced into the Cretaceous volcano sedimentary sequence and a granodiorite member of the Peruvian coastal batholith. Elida is one of the first Eocene-age mineralized porphyry systems discovered in Peru.

Previous drilling by Element 29 intersected multiple, long intervals of porphyry Cu-Mo-Ag mineralization, which has been traced to a depth of greater than 900 m, where it remains open. Most of the Cu-Mo mineralization is carried in A veins and C veins that were formed during the waning stages of potassic alteration, with a significant secondary amount of Cu mineralization carried in later E-type veins.

Based on 14,361.4 m of diamond drilling, Element 29 completed an independent pit-constrained inferred mineral resource estimate, which outlined 321.7 million tonnes of 0.32 per cent Cu, 0.029 per cent Mo and 2.61 g/t Ag at a cut-off grade of 0.2 per cent Cu and a 0.74:1 strip ratio.

Information on the mineral resource estimate is in the technical report, available on the company's website and on SEDAR+, titled, "NI 43-101 Technical Report, Mineral Resource Estimation of the Elida Porphyry Copper Project in Peru," with an effective date of Sept. 20, 2022, and prepared in accordance with Form 43-101F1 by Marc Jutras, PEng MASc, principal, mineral resources, Ginto Consulting Inc., a qualified person as defined in National Instrument 43-101, Standards of Disclosure for Mineral Projects, who is independent of Element 29.

Qualified person

The scientific and technical content of this news release has been reviewed and approved by Richard Osmond (PGeo), Element 29's president and CEO, who is the qualified person as defined by National Instrument 43-101, Standards for Disclosure for Mineral Projects.

About Element 29 Resources Inc.

Element 29 is an emerging junior resource company with a highly experienced management team and board focused on exploring and potentially developing Tier 1 copper deposits in Peru, one of the lowest-cost, lowest-risk mining jurisdictions globally.

The company's principal objective is to explore and potentially develop its Elida porphyry copper deposit in west-central Peru, which has an initial inferred mineral resource estimate of 321.7 million tonnes grading 0.32 per cent Cu, 0.03 per cent Mo and 2.61 g/t Ag at a cut-off grade of 0.2 per cent Cu and a low 0.74:1 modelled strip ratio. The mineral resource estimate information is available in "NI 43-101 Technical Report, Mineral Resource Estimation of the Elida Porphyry Copper Project in Peru," dated Sept. 20, 2022, and prepared in accordance with Form 43-101F1 by Marc Jutras, PEng, MASc, Ginto Consulting.

Alongside Elida, the company has three early-stage, highly prospective porphyry Cu projects in Peru for more than 25,000 ha of titled concession. These include the Flor de Cobre porphyry Cu-Mo prospect, situated in the southern Peru copper belt, just 26 km from the Cerro Verde copper mine (Freeport-Buenaventura), as well as the Paka and Pahuay porphyry Cu skarn prospects related to potential tertiary-aged, mineralized porphyry complexes intruding along the eastern margin of the Peruvian coastal batholith.

All projects are well located for future mine development and will benefit from nearby infrastructure, including roads, power lines, ports, water and a skilled work force.

We seek Safe Harbor.

© 2026 Canjex Publishing Ltd. All rights reserved.