11:08:27 EDT Sat 15 Mar 2025
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Arctic Fox Lithium Corp
Symbol AFX
Shares Issued 56,326,548
Close 2023-10-11 C$ 0.10
Market Cap C$ 5,632,655
Recent Sedar Documents

Arctic Fox adviser Claytens on site at Quebec projects

2023-10-12 12:49 ET - News Release

Mr. Harry Chew reports

MR. GARY CLAYTENS ONSITE TO ASSIST WITH THE SUPERVISION OF GROUND CREWS ON ARCTIC FOX LITHIUM CORP.'S PROJECTS IN THE JAMES BAY REGION OF QUEBEC

Gary Claytens, strategic adviser to Arctic Fox Lithium Corp., is on site at the company's projects in the James Bay region of Quebec. Mr. Claytens will assist in the supervision of the ground crews and provide guidance for the Company's exploration program.

Mr. Gary Claytens, Strategic Advisor to the Company, commented: "I am pleased to be working alongside ground crews on these projects as it provides me with first-hand knowledge of the terrain and any potential lithium bearing pegmatites on surface. I will be able to advise the crews and assist in mapping out an efficient exploration program on all of our projects."

Mr. Harry Chew President and CEO to the Company, commented: "The Company is lucky to have Mr. Gary Claytens onsite as he provides years of experience in the field especially in the lithium sector. I am comforted in knowing that Gary is onsite as his professionalism and expertise is unparalleled."

About Arctic Fox Lithium Corp.

Arctic Fox Lithium Corp. is a junior mineral exploration company focused on the acquisition and development of mineral properties containing battery, base and precious metals.

The Company's 5,976 hectare Kana Lake Lithium project is located north of the Fliszar Lithium showing in the James Bay region of Quebec. During a summer/fall 2022 survey program conducted by the Qu e bec Ministere de l'Energie et des Ressources Naturelles ( "MERN" ) their geologists identified this area as a new lithium prospective zone that is characterized by the presence of numerous E-W trending pegmatitic granite dykes. The presence of garnet and muscovite in these rocks indicates a hyperaluminous composition, suitable for the development of lithium mineralization. These pegmatites are consistent with the Fliszar Lithium showing to the south of the property which three grab samples rich in lepidolite, returned up to 1.83 per cent LiO2, 0.34 per cent Cs, 1.11 per cent Rb, 126 ppm Nb, 374 ppm Ta and 0.3 per cent Be*.

The Company's 2,756-hectare Pontax North Lithium Project (" Pontax North ") is located 12 km south of Allkem Ltd. (ASX/TSX:ALLKEM) (" Allkem ") James Bay Lithium Project and 12 km north of Stria Lithium Inc.'s (CSE:SRA) Pontax Lithium Project, located in northern Quebec, approximately 130 km east of James Bay and the Cree Nation's Eastmain community.

The northern portion of Pontax North contains a lithium prospective zone in a similar geological environment to Allkem's project. According to the Quebec Ministere de l'Energie et des Ressources Naturelles (MERN) this zone is characterized by the abundance of S-type pegmatitic granite intrusions, a lithology known for its Be, Li, Nb, and Ta potential. Beryl (a beryllium silicate mineral) is reported in several outcrops within this zone. The Property is known to contain a 10 km long pegmatite trend as mapped by MERN. This trend appears to be underexplored, despite its recognized lithium potential. Swarms of lithium-bearing granitic dykes are present 12 km north of the Property at Allkem's Cyr showing and at Stria Lithium's Pontax showing 12 km to the south.

Allkem is proposing to develop a lithium mine at their James Bay Lithium Project, located adjacent to the Billy Diamond Highway which provides access to key infrastructure in the region. The 2021 Feasibility Study and Maiden Ore Reserve (" FS ") details a 321 ktpa spodumene operation utilizing conventional open pit mining. Allkem's spodumene expertise from the success of its Mt. Cattlin operations in Western Australia has been applied to the design and development of the James Bay Project. The FS suggests that James Bay Project will be the most competitive operation in the region with the lowest capital and operating costs. Shallow, high-grade mineralization with favourable infrastructure also supports the low-cost operation. Allkem has published a mineral resource estimate of 40.3 Mt @1.40 per cent Li2O ( FS summary here ) and mineralization is still open.

Stria launched its first full drilling program at its Pontax project in 2017, completing seven holes for a total of 911.4 m. All seven holes intersected spodumene - bearing pegmatite dykes grading from 0.65 per cent Li2O to 2.49 per cent Li2O over a minimum of 1.0 m ( Stria Lithium web site ). The best intercept was 21.39m grading 1.16 per cent Li2O in drill hole 975-17-0142.

The Company's 1,056 hectare Delta Lake Lithium project (" Delta Lake ") is located 55 km southeast of Allkem's James Bay Lithium Project and 20 km north of Critical Elements Lithium Corp. (TSXV: CRE) (" CEL ") Rose Lithium Project.

The geological environment in the northwestern portion of Delta Lake is similar to that hosting Allkem's lithium mineralization. According to the Quebec Ministere de l'Energie et des Ressources Naturelles ( "MERN" ) this zone is characterized by the abundance of S-type pegmatitic granite intrusions, a lithology known for its Be, Li, Nb, and Ta potential. Beryl (a beryllium silicate mineral) is reported in several outcrops within this zone.

Allkem (55 km northwest) is proposing to develop a lithium mine at their James Bay Lithium Project, located adjacent to the Billy Diamond Highway which provides access to key infrastructure in the region. The 2021 Feasibility Study and Maiden Ore Reserve (" FS ") details a 321,000 tonne per year operation utilizing conventional open pit mining. Allkem's spodumene expertise from the success of its Mt. Cattlin operations in Western Australia has been applied to the design and development of the James Bay Project. The FS suggests that James Bay Project will be the most competitive operation in the region with low capital and operating costs. Shallow, high-grade mineralization with favourable infrastructure also supports the low-cost operation. Allkem has published a mineral resource estimate of 40.3 Mt @1.40 per cent Li2O ( FS summary here ) and mineralization is still open.

CEL's Rose Lithium-Tantalum mine (20 km south) is anticipated to start production in approximately 21 months. The mine will excavate a total of 26.3M tonnes ore grading an average of 0.87 per cent Li 2 O and 138 ppm Ta 2 O 5 after dilution. The mill will process 1.61M tonnes of ore per year to produce an annual average of 224,686 tonnes of technical and chemical grade spodumene concentrates and 441 tonnes of tantalite concentrate. The ore is contained in several parallel and continuous shallow dipping pegmatite dykes outcropping on surface. The ore zones are open at depth and a future underground operation is possible. Over the life of mine, the open pit will excavate a total of 182.4M tonnes of waste rock and 10.9 M tonnes of overburden. The average strip ratio is 7.3 tonnes of waste per tonne of ore. ( CEL website ).

* This news release contains information about adjacent properties on which Arctic Fox has no right to explore or mine. Readers are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on the Company's properties.

The technical information contained within this News Release has been reviewed and approved by Gerald G. Carlson, Ph.D., P.Eng., Director of Arctic Fox and Qualified Person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects.

We seek Safe Harbor.

© 2025 Canjex Publishing Ltd. All rights reserved.