11:25:41 EDT Mon 14 Oct 2019
Enter Symbol
or Name
USA
CA



Login ID:
Password:
Save
Mountain Boy Minerals Ltd (2)
Symbol C : MTB
Shares Issued 33,670,382
Close 2019-03-04 C$ 0.185
Recent Sedar Documents

Mountain Boy partner drills 5.12m of 16.56g/t Au at Red

2019-03-05 12:17 ET - News Release

Mr. Lawrence Roulston reports

RED CLIFF PARTNER REPORT DRILLING RETURNS 16.56 G/T GOLD OVER 5.12 METRES

Mountain Boy Minerals Ltd.'s joint venture partner -- Decade Resources Ltd. -- has released the final assay results from the 2018 drilling on the Red Cliff property. Highlights of drilling, as reported by Decade, include:

  • 16.56 grams per tonne gold over 5.12 metres in DDH-MON-18-50;
  • 13.90 g/t gold over 2.99 m in DDH-MON-18-48;
  • 21.90 g/t gold over 1.83 m in DDH-MON-18-58;
  • 8.93 g/t gold over 6.1 m in DDH-MON-18-67;
  • 13.58 g/t gold over 3.2 m DDH-MON-18-46.

Mountain Boy holds a 35-per-cent interest in the Red Cliff project located in the Stewart camp of British Columbia's Golden Triangle. Decade is operator of the project. Red Cliff was the first significant mine in the Stewart area, with a rail line built to transport ore to the port at Stewart. Between 1908 to 1912, about 2,385 metres of underground development was carried out on five levels, focused on the copper-rich zone at the valley level. The recent work is directed at the Waterpump and Montrose zones, which are located north of the original mine and at higher elevation. Those zones occur along 400 m of length in a gold-bearing structure that has been identified over at least a 2.3-kilometre length.

Lawrence Roulston, president of Mountain Boy, commented: "We continue to be encouraged by these latest results, which support our belief that Red Cliff represents a large and well-mineralized gold system. Road accessible and just 2.5 kilometres from a paved highway, Red Cliff is ideally situated for mine development. Mountain Boy and Decade are examining options for an independent review and a resource estimate, which will provide further guidance in how best to advance this project."

Final results of the 2018 drilling, as reported by Decade, are shown in the attached table.

                      MONTROSE ZONE  
                                
DDH No.        From (m)   To (m)    Core length (m)*  Gold (g/t)

MON-2018-45     208.90   210.06               1.16         1.78
and             211.89   215.24               3.66         8.94
and             224.54   225.64               1.10         6.33
and             227.44   228.05               0.61         9.06
MON-2018-46     202.41   203.05               0.64         2.06
                206.10   207.77               1.68         4.59
                210.82   214.02               3.20        13.58
MON-2018-48     225.64   226.25               0.61         3.97
                233.84   236.13               2.29        13.90
                245.30   246.34               1.04         1.46
                251.89   257.32               5.43         3.90
MON-2018-49     233.84   236.89               3.05         1.37
                238.45   239.05               0.61        25.10
                239.94   245.12               5.18         7.16
                257.01   259.91               2.90         9.29
MON-2018-50     236.89   239.94               3.05         1.41
                243.96   249.09               5.12        16.56
                252.01   253.66               1.65         2.83
                268.35   269.27               0.91        13.70
MON-2018-51     274.39   276.86               2.47         3.74
                278.08   278.54               0.46         2.26
                281.25   281.71               0.46         4.33
                294.82   296.74               1.92        17.93
MON-18-52       370.24   371.62               1.37         1.29
                380.12   381.62               1.49         4.86
                382.84   383.66               0.82         3.26
                384.60   385.43               0.82         3.76
                390.09   392.38               2.29         1.74
                395.43   398.48               3.05         2.88
MON-18-55       215.24   218.29               3.05         2.25
MON-18-56       236.13   240.24               4.12         8.59
Incl.           236.13   237.04               0.91        12.60
Incl.           239.73   240.24               0.52        45.50
                242.96   243.29               0.34         4.49
                246.04   247.10               1.07         1.36
MON-18-57       242.53   244.51               1.98         1.85
                252.74   253.35               0.61         2.08
MON-18-58       307.01   308.84               1.83        21.90
                316.46   317.13               0.67         1.36
MON-18-59       235.12   236.89               1.77         2.99
                239.09   240.30               1.22         4.36
                252.87   253.87               1.01         3.95
                258.23   261.28               3.05         7.61
MON-18-60        91.01    92.59               1.59         3.88
                114.63   117.68               3.05         1.06
MON-18-61       108.54   111.59               3.05         6.57
                114.63   116.62               1.98         1.25
                121.65   123.78               2.13         1.05
MON-18-62       148.48   151.07               2.59         2.01
                155.43   156.49               1.07        11.28
MON-18-63        95.73    96.65               0.91         8.23
                157.62   158.90               1.28         3.27
                169.42   172.26               2.84         1.44
                193.75   197.26               3.51         5.05
MON-18-64       214.12   214.88               0.76         5.85
                220.27   222.56               2.29         1.15
                227.74   230.79               3.05         1.87
                250.76   255.79               5.03         6.88
Incl.           251.83   254.27               2.44        12.56
MON-18-65       105.49   108.54               3.05         3.37
                109.76   114.63               4.87         2.50
                117.68   120.67               2.99         3.55
                123.17   123.78               0.61        13.01
                126.83   129.88               3.05         1.35
MON-18-67        93.60    99.70               6.10         8.93
                110.52   112.50               1.98         3.31
                117.99   122.10               4.11         2.88
Incl.           117.99   118.90               0.61         6.94
    
* True width is believed to be 70 per cent of intersection 
length.
 

Paul Metcalfe, PGeo, a qualified person under National Instrument 43-101, is responsible for the technical aspects of this release. Actlabs in Kamloops and Loring Labs in Calgary provided the analysis on the core.

About Mountain Boy Resources Ltd.

In addition to its interest in Red Cliff, Mountain Boy is exploring 200 square kilometres in the American Creek and Bear Pass areas north of Stewart. Drill permitting is under way as part of an aggressive exploration program panned for this year. Mountain Boy is exploring a large and highly prospective property portfolio in the Stewart camp, at the southern end of the Golden Triangle in British Columbia. Mountain Boy projects are located on or near roads and within 45 kilometres of the deepwater port of Stewart.

© 2019 Canjex Publishing Ltd. All rights reserved.