Sierra Metals produces 10.94 MMoz AgEq in 2015

2016-02-09 00:30 ET - News Release

Mr. Mike McAllister reports

SIERRA METALS REPORTS 2015 PRODUCTION AND ANNOUNCES 2016 PRODUCTION OUTLOOK

Sierra Metals Inc. has released fourth quarter production results, including an increase in copper equivalent production and record throughput at its Bolivar mine, and an increase in silver equivalent production at its Cusi mine, while the restructuring process at its Yauricocha mine continued to temporarily depress throughput and grades resulting in lower production for the three-month period ended Dec. 31, 2015.

Total consolidated tonnes processed increased by 9 per cent; however, silver equivalent and copper equivalent production both decreased by 7 per cent, respectively, for the 12-month period. Results are from Sierra Metal's three underground mines in Latin America: the Yauricocha polymetallic mine in Peru and the Bolivar copper and Cusi silver mines in Mexico.

Fourth quarter production highlights:

  • Total tonnes processed of 456,842;
  • A 7-per-cent increase over fourth quarter 2014 silver equivalent production of 2.3 million ounces;
  • A 23-per-cent decrease from fourth quarter 2014 copper equivalent production of 15.6 million pounds;
  • A 23-per-cent decrease from fourth quarter 2014.

Fourth quarter consolidated metal production declined as a result of reduced plant throughput of 14 per cent and lower ore grades at the Yauricocha mine in Peru, which was partially offset by the increase in throughput at both the Bolivar and Cusi mines. The decrease in throughput at the Yauricocha mine continues to be attributable to the continuing restructuring that has addressed the management of water control issues, and is focused on the improvement of mine sequencing and implementation of best practices and mechanization of the mine.

"While we anticipate improved consolidated results in the current year, we are extremely pleased to see increased copper equivalent production at Bolivar and growth in silver equivalent production at Cusi," commented Mark Brennan, president and chief executive officer of Sierra Metals. "We continue to focus on the restructuring and rehabilitation at the Yauricocha mine with the implementation of best practices and the introduction of modern methodologies. Management is optimistic that these beneficial changes that have resulted in lower production in the near term will serve to increase production in the coming years."

He continued, "Further success in brownfields exploration such as the recent discovery of the Esperanza zone at our Yauricocha mine, combined with our production optimization program, shall enable Sierra Metals to continue on a solid path of increased production and resource growth for the foreseeable future."

Production guidance for 2016

The company is pleased to announce consolidated production guidance for 2016.

                   GUIDANCE FOR 2016   
                                           Low        High

Silver ounces                        2,600,000   3,200,000
Copper pounds (000s)                    24,400      30,100
Lead pounds (000s)                      26,700      32,900
Zinc pounds (000s)                      43,200      53,400
Gold ounces                              9,100      11,200
Silver equivalent ounces (000s)         10,400      12,800
Copper equivalent pounds (000s)         69,100      85,300

All metals have a higher production guidance for 2016 than compared with 2015 production with the exception of lead. Production of lead at the Yauricocha mine is forecasted to be lower due to required stope development, which has yet to be completed, as well as anticipated lower grades at depth in the central mine zone. Replacement of higher-grade lead zones is expected to come from the recently discovered Esperanza zone in the future.

Consolidated production results

                                   CONSOLIDATED PRODUCTION

                                       Three months ended     Twelve months ended       Guidance for 2015      
                                      Dec. 31,    Dec. 31,    Dec. 31,    Dec. 31,        Low        High
                                         2015        2014        2015        2014

Tonnes processed (mt)                 456,842     428,859   1,864,706   1,706,715  18,050,000   2,105,000
Daily throughput                        5,221       4,901       5,328       4,892
Silver ounces                         603,114     875,400   3,104,952   3,148,145  31,440,000   3,668,000
Copper pounds (000s)                    5,493       5,908      23,197      22,643      21,000      24,300
Lead pounds (000s)                      7,920      12,096      42,177      48,834      44,300      51,800
Zinc pounds (000s)                      9,265      13,399      42,077      54,256      41,900      48,900
Gold ounces                             2,201       2,329       9,066       9,457      11,200      13,000
Silver equivalent ounces (000s)         2,341       3,058      10,943      11,788      10,800      12,600
Copper equivalent pounds (000s)        15,609      20,385      72,946      78,588      72,400      84,300

Yauricocha mine, Peru

The Yauricocha mine processed a total of 193,710 tonnes in fourth quarter 2015, representing a 14-per-cent decrease compared with fourth quarter 2014.

Lower metal production was driven by lower plant throughput and lower head grades from the polymetallic and lead-oxide concentrates.

Lower recoveries of lead and silver were a consequence of lower head grades in the ore sources available to be mined in 2015 versus 2014.

A summary of production from the Yauricocha mine for fourth quarter 2015 has been provided in the attached Yauricocha production table.

                  
                               YAURICOCHA PRODUCTION

                                        Three months ended     Twelve months ended      
                                       Dec. 31,    Dec. 31,    Dec. 31,    Dec. 31,
                                          2015        2014        2015        2014

Tonnes processed (mt)                  193,710     224,986     832,225     885,495
Daily throughput                         2,214       2,571       2,378       2,545
Silver grade (g/t)                       86.13      116.78      102.62      112.95
Copper grade                              0.38%       0.71%       0.49%       0.59%
Lead grade                                2.46%       3.09%       2.93%       3.20%
Zinc grade                                2.48%       3.07%       2.57%       3.14%
Gold grade (g/t)                          0.63        0.71        0.70        0.78
Silver recovery                          53.53%      70.48%      65.23%      65.97%
Copper recovery                          64.94%      65.52%      61.68%      66.70%
Lead recovery                            64.98%      75.85%      73.28%      74.70%
Zinc recovery                            87.45%      88.08%      89.38%      88.54%
Gold recovery                            26.38%      26.41%      26.74%      25.69%
Silver ounces                          287,140     595,340   1,791,056   2,121,565
Copper pounds (000s)                     1,047       2,304       5,567       7,697
Lead pounds (000s)                       6,814      11,632      39,430      46,714
Zinc pounds (000s)                       9,265      13,399      42,077      54,256
Gold ounces                              1,041       1,360       5,018       5,683
Silver equivalent ounces (000s)          1,239       2,157       6,614       8,194
Copper equivalent pounds (000s)          8,259      14,378      44,094      54,625

Bolivar mine, Mexico

Bolivar had an exceptional quarter in fourth quarter 2015, with a 22-per-cent increase in copper equivalent production and record quarterly plant throughput of 211,311 tonnes, a 32-per-cent increase compared with fourth quarter 2014. Copper production of 4.4 million pounds increased 23 per cent, silver production of 102,894 ounces increased 11 per cent and gold production of 833 ounces increased 25 per cent compared with fourth quarter 2014. The increase in copper, silver and gold production was driven by higher plant throughput, higher gold head grades and higher recoveries of copper compared with fourth quarter 2014.

A summary of production for the Bolivar mine for fourth quarter 2015 has been provided in the attached Bolivar production table.

            
                                 BOLIVAR PRODUCTION 

                                          Three months ended       Twelve months ended               
                                        Dec. 31,     Dec. 31,     Dec. 31,     Dec. 31,
                                           2015         2014         2015         2014

Tonnes processed (mt)                   211,311      159,904      830,447      665,951
Daily throughput                          2,415        1,827        2,373        1,903
Copper grade                               1.13%        1.25%        1.15%        1.22%
Silver grade (g/t)                        19.37        22.03        20.57        22.54
Gold grade (g/t)                           0.31         0.29         0.30         0.23
Copper recovery                           84.29%       82.10%       84.02%       83.28%
Silver recovery                           78.18%       81.85%       80.18%       82.15%
Gold recovery                             40.04%       45.32%       40.49%       49.38%
Copper pounds (000s)                      4,447        3,604       17,629       14,946
Silver ounces                           102,894       92,689      440,401      396,421
Gold ounces                                 833          665        3,216        2,485
Silver equivalent ounces (000s)             822          675        3,286        2,794
Copper equivalent pounds (000s)           5,480        4,499       21,904       18,624

Cusi mine, Mexico

Total ore processed of 51,821 tonnes during fourth quarter 2015 increased 18 per cent compared with fourth quarter 2014, and the average daily throughput of 597 tonnes per day was the highest ever achieved in a quarter at Cusi. Silver production of 213,080 ounces increased 14 per cent, while gold production of 327 ounces and lead production of 1.1 million pounds increased by 8 per cent and 138 per cent, respectively, compared with fourth quarter 2014. The increase in metal production during fourth quarter 2015 was due to higher plant throughput, higher silver and lead head grades, and higher gold and lead recoveries.

A summary of production for the Cusi mine for fourth quarter 2015 has been provided in the attached Cusi production table.

      
                                    CUSI PRODUCTION 
 
                                         Three months ended       Twelve months ended               
                                       Dec. 31,     Dec. 31,     Dec. 31,     Dec. 31,
                                          2015         2014         2015         2014

Tonnes processed (mt)                   51,821       43,969      202,033      155,269
Daily throughput                           592          503          577          444
Silver grade (g/t)                      175.20       173.13       175.88       166.69
Gold grade (g/t)                          0.29         0.33         0.22         0.42
Lead grade                                1.19%        0.62%        0.78%        0.78%
Silver recovery                          73.00%       76.56%       76.46%       75.70%
Gold recovery                            67.91%       66.08%       57.22%       61.89%
Lead recovery                            81.10%       77.06%       79.08%       79.06%
Silver ounces                          213,080      187,371      873,496      630,159
Gold ounces                                327          304          831        1,289
Lead pounds (000s)                       1,106          464        2,747        2,120
Silver equivalent ounces (000s)            281          226        1,043          801
Copper equivalent pounds (000s)          1,870        1,507        6,948        5,339

Quality control

All technical data contained in this news release have been reviewed and approved by Gordon Babcock, PEng, chief operating officer, a qualified person under National Instrument 43-101 (standards of disclosure for mineral projects).

We seek Safe Harbor.